Public Hearing - September 30, 2013

    


       1      BEFORE THE NEW YORK STATE SENATE
              STANDING COMMITTEE ON ENERGY AND TELECOMMUNICATIONS
       2      ------------------------------------------------------

       3                         PUBLIC HEARING:

       4       TO EXAMINE AND ANALYZE THE PLANS, CONTENTIONS, AND
             ARGUMENTS PUT FORWARD IN RELATION TO THE INDIAN POINT
       5         CONTINGENCY PROCEEDING BEING CONDUCTED BY THE
                    NEW YORK STATE PUBLIC SERVICE COMMISSION
       6
              ------------------------------------------------------
       7

       8
                               Senate Majority Office
       9                       250 Broadway - 19th Floor
                               New York, NY 10007-2375
      10
                               September 30, 2013
      11                       10:00 a.m. to 3:00 p.m.

      12

      13
              PRESIDING:
      14
                 Senator George D. Maziarz
      15         Chair

      16

      17      SENATE MEMBERS PRESENT:

      18         Senator David Carlucci

      19         Senator Patricia Ritchie

      20

      21

      22

      23

      24

      25







                                                                  2
       1
              SPEAKERS                                PAGE  QUESTIONS
       2
              Rajendra Addepalli                         8      24
       3      Deputy Director - Office of Electric,
                   Gas & Water
       4      NYS Department of Public Services

       5      Gil Quinones                               8      24
              President and CEO
       6      New York Power Authority (NYPA)

       7      Stuart Nachmias                           36      45
              Vice President of Energy Policy
       8      Con Edison

       9      T. Michael Twomey                         59      70
              Vice President of External Affairs
      10      Entergy Wholesale Commodities

      11      Thomas Rumsey                             90      93
              Vice President of External Affairs
      12      New York Independent Service Operator

      13      Gavin Donahue                             97     104
              President & CEO
      14      Independent Power Producers of NY, Inc.

      15      Paul Haering                             106     113
              Vice President of Engineering and
      16           System Operations
              Central Hudson Gas & Electric
      17
              James Slevin                             116     124
      18      Vice President
              Dominic Marzullo
      19      Business Agent for Local 1-2
              James Spry
      20      An Executive Board Member for Local 1-2,
              and, Indian Point Employee
      21      Utility Workers Union of America

      22      Darren Suarez                            132     140
              Director of Government Affairs
      23      The Business Council

      24

      25







                                                                  3
       1
              SPEAKERS (Continued):                   PAGE  QUESTIONS
       2
              Arthur "Jerry" Kramer                    141
       3      Chairman
              New York Affordable, Reliable
       4           Electricity Alliance

       5      John Ravitz                              150     155
              Executive Vice President & COO
       6      The Business Council of
                   Westchester County
       7
              Phillip Musegaas                         155     174
       8      Hudson River Program Director
              Riverkeeper
       9
              Susan Shapiro                            185     213
      10      Attorney
              Radiation & Public Health Project
      11

      12

      13                            ---oOo---

      14

      15

      16

      17

      18

      19

      20

      21

      22

      23

      24

      25







                                                                  4
       1             SENATOR MAZIARZ:  Good morning, everyone.

       2             If I could call this hearing to order,

       3      I, first of all, want to state for the record that

       4      today is Monday, September the 30th, at

       5      approximately 10:15 p.m. [sic].

       6             We are starting a meeting of the

       7      Senate Energy Committee, a public hearing on the

       8      Indian Point contingency plan.

       9             For all those who are present, I want to

      10      thank you all for your attendance.

      11             Apologize probably for the long line -- long,

      12      hot line that you had to wait in to get through

      13      security to get into this building.

      14             I appreciate your patience, as do my

      15      colleagues.

      16             I'm joined today by Senator Patricia Ritchie

      17      from the North Country.

      18             I do want to say, just again for the record,

      19      that we have had responses of members of the Senate

      20      and this Committee who will attend.

      21             Those of you who are familiar with these

      22      hearings know that members do come and go based on

      23      their own time considerations.

      24             I certainly appreciate all of their

      25      attention.







                                                                  5
       1             We will be joined shortly by

       2      Senator David Carlucci; Senator Eric Adams, who is,

       3      I think, soon to be Brooklyn Borough President

       4      Eric Adams; Senator Felder, and Senator Dilan, have

       5      all RSVP'd that They will come for at least a part

       6      of this hearing.

       7             We are here today to examine and analyze the

       8      proceeding currently before the Public Service

       9      Commission to examine contingencies in the event,

      10      "in the event," of the closure of Indian Point

      11      Energy Center.

      12             There are currently proceedings before, not

      13      just the Public Service Commission, also before the

      14      Department of Environmental Conservation, and also

      15      before the federal Energy Regulatory Commission.

      16             Of most concern to this Committee is:

      17             The contingency plan, how much that would

      18      cost.

      19             It's been estimated to cost almost, "almost,"

      20      $1 billion to close Indian Point;

      21             Where the power would come from to replace

      22      the current power that is produced by Indian Point;

      23             And where the revenue would be derived from

      24      to pay for those costs.

      25             And I can tell you, myself, and speaking on







                                                                  6
       1      behalf of the members, at least the upstate members,

       2      Senator Ritchie and myself of this Committee, and

       3      the other upstate members of the Senate, we

       4      certainly do not want to see those costs, that

       5      burden -- that financial burden, placed upon

       6      businesses and residents outside of the Indian Point

       7      service area, and most particularly, those in

       8      Upstate New York.

       9             I have personally visited the Indian Point

      10      facility.

      11             I have seen how safe that particular facility

      12      is, both from the standpoint of natural disasters,

      13      and manmade disasters, terrorist attacks, and so

      14      forth.

      15             As I said, we are most concerned, "most

      16      concerned," with maintaining a clean, positive

      17      operating facility, and what should happen if these

      18      various agencies determine that something other than

      19      what's currently being done would replace

      20      Indian Point nuclear plant.

      21             So with that, I do want to thank my colleague

      22      Senator Ritchie.

      23             She traveled a great distance to be here

      24      today.

      25             She has been an extremely good partner on the







                                                                  7
       1      Energy Committee in going forth.

       2             And, certainly, I've heard from her, in my

       3      opinion, almost far too often, about protecting --

       4      protecting the area of the state that she represents

       5      from any increased costs in energy facilities.

       6             Senator Ritchie, would you like to -- care to

       7      make any opening statement before we go to our first

       8      witnesses?

       9             SENATOR RITCHIE:  Sure.

      10             I would just like to thank Senator Maziarz

      11      for calling this hearing on Indian Point.

      12             This issue is extremely important to me, as

      13      I represent the district that Nine Mile 1 and 2 in

      14      Fitzpatrick are located.

      15             They generate a third of the electricity

      16      upstate.

      17             They actually -- they actually have over a

      18      thousand employees, and are very important, not only

      19      to the rate that people pay in New York State, but

      20      also important to the economy of my district.

      21             So, I look forward to hearing the comments

      22      today, and appreciate the opportunity to ask some

      23      critically important questions I think that may not,

      24      at this point, address some of the issues that may

      25      come later with regard to the other three nuclear







                                                                  8
       1      plants that are in my district.

       2             SENATOR MAZIARZ:  Thank you very much,

       3      Senator.

       4             Our first witnesses, and we appreciate very

       5      much them taking the time to be here today:

       6             Is Gil Quinones, the president and CEO of the

       7      New York State Power Authority.

       8             Thank you very much, Gil;

       9             And, also, Rajendra Addepalli, the deputy

      10      director of the Office of Electric, Gas & Water for

      11      the New York State Department of Public Service.

      12             They're going to be testifying together.

      13             I assume, Mr. Quinones, you're going to go

      14      first.

      15             Thank you very much, Rajendra, for being

      16      here.

      17             Oh, I'm sorry.

      18             GIL QUINONES:  It's actually the opposite.

      19             SENATOR MAZIARZ:  The opposite, okay.

      20             I'm shocked that the --

      21             GIL QUINONES:  I yield my time to him.

      22             SENATOR MAZIARZ:  -- NYPA would not go first.

      23                  [Laughter.]

      24             RAJENDRA ADDEPALLI:  Good morning.

      25             Good morning, Senator Maziarz and







                                                                  9
       1      Senator Ritchie.

       2             Thank you for giving us the opportunity to

       3      come and discuss these issues with you this morning.

       4             What I will do in my testimony is answer a

       5      few questions, some of which that you have raised

       6      this morning:

       7             Why are we doing this contingency plan?

       8             What is in this plan?

       9             And, what is the cost of this plan?

      10             And, who's going to pay for it?

      11             And, how does it comport with the competitive

      12      wholesale markets that are in place?

      13             So, starting with, "Why do this plan,

      14      contingency plan?" numerous entities have done

      15      reliability analysis in the state, including the

      16      New York ISO and the City of New York, Con Edison,

      17      and others.

      18             And as part of the analysis, they examined

      19      what the reliability ramifications would be if

      20      Indian Point were not available post 2015 December.

      21             And they've all identified that, in summer

      22      2016, there will be reliability violations, and, so,

      23      there's a need to address that concern.

      24             And so how do we, address in, general

      25      retirements of plants in New York State?







                                                                  10
       1             Over the last number of years, numerous

       2      plants have retired, thousands of megawatts.

       3             We do have at the commission a policy

       4      statement for retirement of generation units.

       5             The policy statement asked the generators,

       6      about 80 megawatts, to file their notice six months

       7      in advance if the plant were to retire or mothball.

       8             And once a notice is filed, the commission

       9      conducts an analysis of the ramifications of the

      10      plant shutdown, working with the New York

      11      Independent System Operator and with the host

      12      utility (local utility).

      13             If there are no reliability issues, the

      14      plants are allowed to shut down.

      15             But if there are reliability concerns, they

      16      need to be addressed, either by the utilities

      17      through their solutions, such as transmission

      18      upgrades, but sometimes they may take time, in which

      19      case the generator may be asked to stay open through

      20      a commercial arrangement.

      21             The most recent examples -- many -- in the

      22      last number of years, many units have been allowed

      23      to retire because there were no reliability

      24      concerns.

      25             But in two cases recently, there were







                                                                  11
       1      concerns, and the utilities said they would need

       2      time to build their transmission solutions, and the

       3      generators were asked to stay open through a

       4      commercial arrangement; namely, for the Dunkirk unit

       5      and for the Cayuga unit.

       6             So, in this case, though, if the unit is not

       7      available post 2015 December, and we only get a

       8      six-month notice, or even a year notice, it's very

       9      difficult to replace the magnitude of the resources

      10      that we are talking about.

      11             There is a lead time needed to replace

      12      through either generation or transmission or demand

      13      reduction.

      14             We have less than three years to go; and, so,

      15      the commission has an obligation to ensure the

      16      reliability is maintained, that the lights stay on.

      17             So it's efficient and effective to have a

      18      plan in place to ensure that the lights stay on.

      19             So, in that context, the commission asked

      20      Con Edison, the primary downstate utility that would

      21      be affected, to work with the Power Authority, and

      22      other parties, like, the Department of Public

      23      Service staff, to come up with a reliability

      24      contingency plan, and Con Edison and NYPA filed one

      25      in February 2013.







                                                                  12
       1             So what does the plan consist of?

       2             The plan -- the reliability contingency plan

       3      had three prongs of solutions to address the

       4      reliability needs.

       5             The first prong is the proposed certain

       6      transition projects between Con Edison and the

       7      Power Authority, and one element of New York State

       8      Electric and Gas.

       9             These transmission solutions could be put in

      10      place by 2016 summer, and would address part of the

      11      reliability need.

      12             The second prong was to put in certain

      13      demand-reduction measures that would also help

      14      reduce need, or alleviate the concerns.

      15             The third prong, even after doing these two,

      16      we need more resources to fill the gap, so, they

      17      proposed issuing an RFP (request for proposals) to

      18      get additional incremental new generation or

      19      transmission solutions.

      20             And they asked the commission to approve this

      21      plan.

      22             And the commission, so far, has taken the

      23      following steps:

      24             One, allowed the utilities to move forward

      25      with these three transmission projects, subject to







                                                                  13
       1      halting and other conditions, given the lead time

       2      that is needed to implement the plans;

       3             Second, it allowed the RFP to move forward;

       4      to be issued, and get responses;

       5             And, third, it asked Con Edison to work with

       6      the NYSERDA and improve the demand-reduction plan.

       7             So what is in front of the commission right

       8      now is these multitude of solutions that would help

       9      address the reliability need: certain transmission

      10      projects proposed by the utilities, certain demand

      11      reductions proposed by the utilities, and the

      12      responses to the RFP.

      13             The commission asked the department staff to

      14      review the RFP responses, because Con Edison and

      15      NYPA are also in the play with their transmission

      16      projects, for unbiasedness.

      17             The department staff has been reviewing these

      18      proposals, and is expected to find out which is the

      19      optimal portfolio solutions that would meet the

      20      reliability needs, keeping the costs low to

      21      consumers, and addressing the risks that are

      22      entailed in selecting these projects.

      23             So that's the, in essence, contingency plan.

      24             And in terms of what does it cost, clearly,

      25      each of these solutions would lead to certain







                                                                  14
       1      investments up front that would be made, whether

       2      it's transmission or demand reduction or a

       3      generation solution.

       4             In addition to satisfying the reliability

       5      need, what these solutions would also provide are

       6      benefits to consumers; economic benefits to

       7      consumers, in terms of reduced energy prices and

       8      reduced capacity prices.

       9             So one has to look at, what is the net cost

      10      to ratepayers of this portfolio of solutions?

      11             Again, our interest is to minimize the cost

      12      to ratepayers, and, to reduce the risks associated

      13      with them.

      14             And, so, the first order of business for us

      15      would be to analyze, What if Indian Point stayed

      16      open, would these solutions still cost ratepayers

      17      money?

      18             But, if the benefits exceed costs, even if

      19      Indian Point stayed open, then it would be in the

      20      interests of the ratepayers to pursue such solutions

      21      that make sense, that not only provide reliability

      22      benefits, but provide economic benefits.

      23             So that analysis is underway in terms of

      24      selecting the optimal portfolio that would

      25      reduce/minimize costs, maximize benefits, and reduce







                                                                  15
       1      risks.

       2             In terms of, "How would the costs be

       3      allocated?" the commission asked the department

       4      staff to come up with a straw proposal to address

       5      how to allocate the costs.

       6             The staff star proposal essentially

       7      articulated a so-called "beneficiaries pay

       8      approach," which means, those who would benefit from

       9      these projects should pay for them.

      10             And the benefits were focused on reliability

      11      benefits: who would otherwise be affected, in terms

      12      of reliability, through these projects?

      13             They are the ones benefiting from a

      14      reliability perspective, so they should pay for

      15      these projects.

      16             It's called a "reliability-based

      17      beneficiaries approach."

      18             So that's the straw proposal.

      19             And, we conducted two technical conferences.

      20             We received numerous comments.

      21             There are other entities that have proposed

      22      other approaches, such as, the beneficiaries should

      23      be thought of more broadly.

      24             If there are other benefits beyond pure

      25      reliability benefits, they should be accounted for







                                                                  16
       1      in the cost-allocation approach.

       2             So those comments are also being examined.

       3             And, the commission would deal with this

       4      issue, along with the selection of the optimal

       5      portfolios, as to how the costs should be allocated.

       6             And some of the parties have suggested

       7      different approaches for different elements of this

       8      plan.

       9             For example:

      10             Certain demand-reduction measures, costs

      11      should be allocated this way; for certain

      12      generation, it should be done a little bit

      13      differently; and, for transmission, yet differently.

      14             So, they're all being analyzed by us at this

      15      point.

      16             And the next question that comes up is,

      17      Why -- or, how does this comport with the existing

      18      marketplace?

      19             And as I said before, if there is certainty

      20      and there is adequate lead time, it's more than

      21      likely the market would address the needs.

      22             We would not have to intervene in any

      23      fashion.

      24             But given the unique circumstance here, there

      25      is uncertainty, and, given our obligation to keep







                                                                  17
       1      the lights on, we have to do this contingency plan.

       2             So what we did to comport with the

       3      marketplace, the first instance of asking for a full

       4      replacement of the power, this is over

       5      2,000 megawatts of a power plant, the reliability

       6      plan that the commission sought is looking at a bare

       7      minimum needed for reliability purposes, just around

       8      1450 megawatts.

       9             So, you're not trying to replace the full

      10      amount, but just to meet the -- enough needed for

      11      reliability purposes.

      12             Second, the RFP that the Power Authority

      13      issued, many elements in the RFP, especially dealing

      14      with the generation, comport with market-price

      15      signals of how efficiently they should be

      16      dispatched.

      17             And, third, many of the -- there are

      18      provisions in the RFP to halt the project.

      19             Should the commission find new information in

      20      the coming months and years that suggests that there

      21      is no need for this project, it could be halted if

      22      it makes sense.

      23             So, in these terms, it is trying to be as

      24      responsive to the needs.

      25             So, in conclusion, it is appropriate, and it







                                                                  18
       1      is necessary, for the commission to address this

       2      contingency plan, to meet the reliability needs to

       3      keep the lights on.

       4             And, we are not taking a position as to

       5      whether Indian Point should be open or should shut

       6      down.

       7             That's not our view.

       8             Our view is purely focused on keeping the

       9      lights on.

      10             And, what are the next steps?

      11             We intend to recommend to the commission, in

      12      the very near future, the optimal set of solutions

      13      that would help address the reliability need,

      14      minimizing net cost to ratepayers, reducing the

      15      risk, and also deal with the cost-allocation

      16      recommendation.

      17             That concludes my remarks, and Mr. Quinones

      18      will provide his.

      19             SENATOR MAZIARZ:  Thank you.

      20             GIL QUINONES:  Thank you very much.

      21             Good morning, Senator Maziarz.

      22             Good morning, Senator Ritchie.

      23             Good to be with you here in southeast

      24      New York.

      25             As you know, we meet a lot upstate in your







                                                                  19
       1      areas.

       2             My name is Gil Quinones.

       3             I am the president and chief executive

       4      officer of the New York Power Authority.

       5             Thank you for the opportunity to testify

       6      today regarding the nature and importance of

       7      generator-reliability contingency plans.

       8             As I will discuss in more detail, contingency

       9      plans allow for advanced measures to prepare for

      10      large power-plant retirements, such as the potential

      11      closures of the Indian Point Energy Center in

      12      Westchester County or the Dunkirk and Cayuga coal

      13      facilities in Western New York.

      14             Given the uncertainties surrounding the

      15      continued operation of such facilities, and in light

      16      of their size, impact on transmission flows, and

      17      proximity to load centers, such preparations are

      18      critical to the continued resilience and reliability

      19      of this state's interconnected electric system.

      20             In 2012, Governor Cuomo proposed an

      21      Innovative Energy Highway Initiative to upgrade and

      22      modernize the state's power system.

      23             I was privileged to serve as a co-chair of a

      24      task force that the Governor named to oversee

      25      development of a series of recommendations to bring







                                                                  20
       1      this far-reaching proposal to fruition.

       2             One of our most significant recommendations

       3      called for the development and implementation of

       4      reliability contingency plans, to prepare for

       5      potential large power-plant retirements.

       6             The task force recognized that recent and

       7      pending environmental regulations, coupled with low

       8      demand growth and low natural gas prices, could lead

       9      to accelerated retirements of older facilities in

      10      the state, creating uncertainty for the power

      11      supply.

      12             The recommended action addressed a critical

      13      aspect of this problem.

      14             By virtue of plant size, location, or issues

      15      regarding the timing of potential retirements, the

      16      electricity market may not be in a position to

      17      respond adequately to the shutdown of certain power

      18      plants once retirement is announced.

      19             This is the potential case with Indian Point,

      20      a nuclear power plant of approximately

      21      2,000 megawatts located in the village of Buchanan,

      22      about 30 miles north of the state's major load

      23      center in New York City and owned by subsidiaries of

      24      Entergy Corporation.

      25             As I have indicated, the need to address







                                                                  21
       1      actual or potential power-plant retirements goes

       2      well beyond Indian Point.

       3             In fact, the New York Independent System

       4      Operator recently reported that the owners of 19 of

       5      the state's generating facilities, representing

       6      almost 1700 megawatts of capacity, have either

       7      retired them during the past 17 months or served

       8      notice of their intent to do so in 2013.

       9             Just over a month ago, Entergy itself

      10      announced that it intends to close its 635-megawatt

      11      Vermont Yankee nuclear plant by the end of next

      12      year, essentially, giving the ISO-New England region

      13      only a one-year lead time to prepare for their

      14      retirement.

      15             Nationwide, the retirements of five nuclear

      16      reactors have been announced within the past year.

      17             This is an industry trend that we cannot

      18      ignore.

      19             The Indian Point situation is exacerbated by

      20      the plant's importance to the New York City load

      21      center, and by the fact that the federal license for

      22      one of the two units expired two days ago, and the

      23      other is scheduled to expire in December 2015.

      24             Although Nuclear Regulatory Commission

      25      regulations allow continued operations until the







                                                                  22
       1      license-renewal process is complete, significant

       2      uncertainty persists regarding whether Entergy will

       3      be able to obtain all the permits and approvals

       4      required to keep both units operating for an

       5      extended period beyond the expiration of their

       6      licenses.

       7             Thus, in adopting the Energy Highway Task

       8      Force's recommendation, the Public Service

       9      Commission, in a November 30, 2012, order commenced

      10      a proceeding specifically to solicit a reliability

      11      contingency plan for Indian Point.

      12             As you have heard from Mr. Addepalli,

      13      Con Edison and NYPA developed a contingency plan for

      14      Indian Point, and filed it with the commission

      15      earlier this year.

      16             The plan identified 1,450 megawatts of

      17      reliability deficiencies that would occur in the

      18      event Indian Point shuts down.

      19             Part of the plan called for NYPA to issue a

      20      request for proposals to solicit a target

      21      1,350 megawatts in generation and transmission

      22      proposals from private developers, which we did on

      23      April 3rd.

      24             As Mr. Addepalli indicated, DPS

      25      (Department of Public Service) staff is now







                                                                  23
       1      evaluating responses to the RFP.

       2             I would now like to address two issues that

       3      have been raised in public statements related to

       4      this hearing.

       5             First, contrary to what has been alleged, no

       6      Power Authority revenue from any source, including

       7      the Niagara Power Project or the St. Lawrence FDR

       8      project, will be used to subsidize projects arising

       9      from the RFP.

      10             Second, NYPA has no role in determining

      11      whether Indian Point will be retired.

      12             Our involvement in the RFP and

      13      contingency-planning process is intended only to

      14      prepare for a possible shutdown.

      15             The Power Authority, in fact, is unable to

      16      predict whether or when the Indian Point Energy

      17      Center will be retired; yet, it is that very

      18      uncertainty surrounding Indian Point's relicensing

      19      and permitting issues that makes it critically

      20      important to plan ahead to prevent the significant

      21      adverse impacts on the state's electric system that

      22      will occur if suitable replacement power is needed,

      23      and unavailable.

      24             The Indian Point contingency plan is a

      25      prudent and essential insurance policy for the







                                                                  24
       1      state's citizens.

       2             It will provide us with the best possible

       3      combination of reliable, economical, and

       4      environmentally compatible power sources.

       5             In contrast, the failure to act now in timely

       6      fashion would represent a striking abdication of the

       7      state's responsibilities and would violate the most

       8      basics standards of effective public policy.

       9             This concludes my prepared remarks, and

      10      Mr. Addepalli and I will be pleased to take your

      11      questions.

      12             SENATOR MAZIARZ:  Thank you very much,

      13      Mr. Addepalli and Mr. Quinones.

      14             We appreciate, again, you being here today.

      15             And I believe we are going to just put some

      16      graphics up here.

      17             But, before we do that, let's --

      18             Oh, okay.

      19             Gil, this document is from NYPA's Prosperous

      20      Conference that was held in relation to replacement

      21      generation under the Indian Point contingency plan.

      22             This meeting was held on April the 12th of

      23      this year.

      24             You certainly recognize this document, don't

      25      you?







                                                                  25
       1             GIL QUINONES:  Yes.

       2             SENATOR MAZIARZ:  Could you just explain this

       3      document, and, you know, what it means, for the

       4      benefit of our Committee.

       5             GIL QUINONES:  Well, the -- what this is, is

       6      an illustration of how the capacity markets work.

       7             The bottom line, And I think, you know,

       8      rather than going through the details on the

       9      three bullets above, I think what you're interested

      10      in is that last bullet, that "the seller does not

      11      bear mitigation risk."

      12             SENATOR MAZIARZ:  Exactly.

      13             Because when you just testified was, it's not

      14      going to cost NYPA -- it's not going cost NYPA's

      15      ratepayers any money.

      16             And, you know, this doesn't seem to agree

      17      with that statement.

      18             GIL QUINONES:  Well, let's -- first of all,

      19      I think we need to rewind.

      20             I don't want to prejudge what the commission

      21      will select in terms of the optimum portfolio.

      22             We don't know, at this point in time, whether

      23      the recommendation of the commission will have a

      24      rate impact.

      25             We don't know yet, you know, and I don't want







                                                                  26
       1      to prejudge that.

       2             And what this basically says is that, in the

       3      event that a power plant is selected and there is a

       4      capacity mitigation, which is the current market

       5      rules, that that risk will be -- will not be borne

       6      by the developer.

       7             And that is a true statement.

       8             SENATOR MAZIARZ:  Okay, if the contingency

       9      plan, I mean, if Indian Point is to -- is to --

      10      let's say, be recommended for closure, you know,

      11      what you're saying is, that NYPA will not

      12      participate at all in the cost of replacing that

      13      2,000-plus megawatts of power?

      14             GIL QUINONES:  NYPA's role is, if a power

      15      plant is selected, part of -- as Mr. Addepalli

      16      described, there are three buckets: you have demand

      17      reduction, you have transmission projects, and you

      18      have power plants.

      19             If a power plant is selected, the design of

      20      the RFP is for NYPA to be the counterparty for that

      21      power plant.

      22             But, also, as Mr. Addepalli described, if --

      23      and, again, I want to emphasize the "if" -- if that

      24      is the case, the beneficiaries of that reliability

      25      solution will bear the cost, not NYPA itself.







                                                                  27
       1             But, again, I think it's important, I just

       2      want to emphasize, it's really important, that we

       3      all not prejudge that there is a significant cost to

       4      this contingency plan that hasn't been determined,

       5      and let's wait until the commission submits its

       6      decision on what the potential solution is, and what

       7      are the costs associated with it.

       8             SENATOR MAZIARZ:  I have more questions, but

       9      I'll let Senator Ritchie go.

      10             SENATOR RITCHIE:  I have a few questions.

      11             I guess I would like to start by just trying

      12      to get, you know, my mind around what's going on.

      13             This contingency plan, has this happened

      14      anywhere else?

      15             GIL QUINONES:  When you say "anywhere

      16      else"...?

      17             SENATOR RITCHIE:  It's first time that --

      18      with Indian Point that this has been put into place,

      19      this proceeding?

      20             RAJENDRA ADDEPALLI:  In a very formal way,

      21      this may be one that caught the attention of many

      22      stakeholders, but, as I mentioned before, we have

      23      had many power plants retire in the state, and in

      24      certain cases, we -- there were reliability

      25      concerns, and we had proceedings in front of the







                                                                  28
       1      commission, through which, "What needs to be done to

       2      address the reliability need?"

       3             And utilities have proposed transmission

       4      projects, but said that it will take time, so, there

       5      was an agreement reached with the generator to keep

       6      them open during a period, through commercial

       7      arrangements.

       8             So, we had proceedings before the commission,

       9      but this is of a different ilk, given the magnitude

      10      of what we are looking at, and a multitude of

      11      solutions that are available here, possibly, to meet

      12      the need, and the lead time that is required here to

      13      meet the need.

      14             So, we have done retirement plans before, but

      15      this is a big size, relatively speaking.

      16             SENATOR RITCHIE:  When you previously had

      17      retirement plans, had the facilities indicated that

      18      they were going to retire the plant, or --

      19      I guess --

      20             RAJENDRA ADDEPALLI:  Yes.

      21             SENATOR RITCHIE:  -- it looks like there's a

      22      little bit of difference here, because, and correct

      23      me if I'm wrong, I've not seen anything that shows

      24      that Entergy has indicated that they don't want to

      25      continue and -- with the relicensing.







                                                                  29
       1             And what you're just describing there is

       2      something completely differently; correct?

       3             RAJENDRA ADDEPALLI:  Correct.

       4             That's a very good observation.

       5             In the other cases, the retirement policy

       6      only requires a six-month notice from the

       7      commission.

       8             And, the generators complied with the

       9      request; six months ahead, they told us that they

      10      would retire.

      11             And we analyzed, and there was a need in

      12      those couple of cases.

      13             Not all, a couple of those cases.

      14             Here, the situation could be different, if

      15      they announce six months ahead, or a year ahead, and

      16      say, We will not be available.

      17             In the other cases, there was an opportunity

      18      to keep them open through a commercial arrangement.

      19             If the NRC denies license, that opportunity

      20      doesn't exist.

      21             So, there is a different reliability concern

      22      here, and different opportunities, or lack of

      23      opportunities.

      24             SENATOR RITCHIE:  So you're saying --

      25             RAJENDRA ADDEPALLI:  This distinguishes it







                                                                  30
       1      from other --

       2             SENATOR RITCHIE:  -- so this plan is only put

       3      in place if, in fact, the licenses aren't renewed,

       4      or, if Entergy decides that they don't want to

       5      continue?

       6             Is that what you're saying?

       7             RAJENDRA ADDEPALLI:  That's correct.

       8             And if -- the lead time is the big issue: how

       9      much of a lead time do we need to bring in

      10      substitute resources?

      11             If the lead time is six months, then we

      12      don't -- we won't have to do much now.

      13             But many of these transmission or demand

      14      reduction or generation take time, two to

      15      three years at least.

      16             And, so, that's the difference.

      17             SENATOR RITCHIE:  So if their license is

      18      renewed and Entergy is going continue, then this

      19      plan goes away?

      20             RAJENDRA ADDEPALLI:  The license-renewal

      21      process, it's not clear if it would happen anytime

      22      soon, and -- but you cannot take the risk of waiting

      23      until the last minute, only to find that it may not

      24      happen.

      25             So, as I said, we have halting provisions in







                                                                  31
       1      the plan.

       2             That, if we find new information in the

       3      coming months and years, and if that tells us there

       4      is no need for this plan to continue, we should take

       5      another look and say, Should we stop some of these

       6      projects?

       7             And, at that time, we'll make an evaluation,

       8      what makes economic sense.

       9             SENATOR RITCHIE:  So I guess, for

      10      clarification:

      11             If the licenses are renewed and Entergy

      12      decides they are going to continue with the plan, if

      13      nothing changes, then it is the intent that this

      14      plan would be halted?

      15             RAJENDRA ADDEPALLI:  It's a question of

      16      timing, Senator, when you would learn about it.

      17             If you learn about it in 2015 fall, it may be

      18      too late, because the replacement solutions,

      19      perhaps, would be on the way, most of the way.

      20             And also, as I mentioned before, we want to

      21      minimize costs to ratepayers.

      22             So, if there are solutions that would make

      23      sense, in that the benefits exceed costs to

      24      ratepayers, even if Indian Point stayed open, it

      25      would behoove for us to move forward with those







                                                                  32
       1      solutions that minimize rates to ratepayers.

       2             SENATOR RITCHIE:  So I guess one of the

       3      concerns for me, as somebody who represents an area

       4      that has three nuclear facilities, is that

       5      considering, now, this seems to be a new contingency

       6      plan, a new proceeding, I'm wondering, why would any

       7      facilities take the risk of investing money to

       8      upgrade if, in fact, at any time, the PFC could, you

       9      know, swoop in and decide that there's going to be

      10      an opportunity to put a contingency plan in place?

      11             RAJENDRA ADDEPALLI:  The contingency plan

      12      came about because of the uncertainty and (a) of the

      13      plant being available, and (2) because of

      14      reliability concerns.

      15             With those three plants that you mentioned,

      16      one has to look at, is that even a question?

      17             There may be no issues associated with

      18      relicensing at all in the near future.

      19             And, second, if one or two -- not that I'm

      20      suggesting that they shut down, but if they were to

      21      announce, is there a reliability concern?

      22             So, there are other threshold conditions that

      23      had to be met.

      24             We have --

      25             GIL QUINONES:  Yeah, if I could just add,







                                                                  33
       1      I think the fundamental difference between the

       2      plants up in your area that you represent, and

       3      Indian Point, is that Indian Point is currently

       4      under a relicensing proceeding before the federal

       5      Nuclear Regulatory Commission.

       6             And that uncertainty really is the

       7      motivation, was the motivation, for us to be more

       8      proactive, rather than sitting back and waiting

       9      what -- what -- you know, what may happen in that

      10      proceeding.

      11             We wanted to be more proactive, the State,

      12      through the Public Service Commission, to make sure

      13      that reliability; safe, reliable electricity, is

      14      available to the citizens, especially here

      15      downstate.

      16             That's the fundamental difference: the plants

      17      upstate are not going through a relicensing process

      18      before the Nuclear Regulatory Commission.

      19             SENATOR RITCHIE:  And I understand that, but

      20      for me, personally, it looks like we're starting a

      21      precedence here --

      22             SENATOR MAZIARZ:  Exactly.

      23             SENATOR RITCHIE:  -- that, you know, this

      24      time maybe you're saying, because it's relicensing

      25      is coming up, but that doesn't mean, next time, now







                                                                  34
       1      that you've started the precedence, that it doesn't

       2      have to be at a time that the plant is up for

       3      relicensing.

       4             So, I will say for me, personally, it's a big

       5      concern.

       6             SENATOR MAZIARZ:  I would add to that

       7      concern.

       8             I think, you know, that, you know, this

       9      becomes the prototype.

      10             Eventually -- eventually, all those plants

      11      will be up for relicensing.

      12             And, you know, if -- I assume that not any of

      13      them are the size of the magnitude of the generator

      14      that Indian Point is, and I think that -- that's why

      15      I think this proceeding before the PFC has to be

      16      monitored very closely, because of what

      17      Senator Ritchie pointed out, this could become the

      18      prototype of what's going to happen.

      19             And I also think, to comparison -- and

      20      I apologize, I don't know if you were finished or

      21      not -- but, the comparison with Vermont Yankee is

      22      somewhat disingenuous for me.

      23             Vermont Yankee I think was a 600-, maybe

      24      600-plus-megawatt plant.

      25             I don't exactly -- I'm not very familiar with







                                                                  35
       1      the location of Vermont Yankee, but I can't believe

       2      it's in a -- in an area similar to, or with a need

       3      similar to, where Indian Point is located, you know,

       4      with such a large population, serving a capacity --

       5      serving a city like New York.

       6             So, I just don't think that's a very fair

       7      comparison either.

       8             I'm sorry, Senator, were you finished?

       9             SENATOR RITCHIE:  I'm all set.

      10             Thank you.

      11             SENATOR MAZIARZ:  Okay, I wanted to make that

      12      point about Vermont Yankee.

      13             I really don't have any other questions.

      14             Unfortunately, Senator Carlucci, I'm told,

      15      is, like, downstairs, on his way up here.

      16             So, if you would not go too far, he may have

      17      some questions for you later on.

      18             May we call you, if you could stick around

      19      for just a little while?

      20             GIL QUINONES:  I --

      21             SENATOR MAZIARZ:  You can't.

      22             GIL QUINONES:  I can't.

      23             I have to move on to another function.

      24             SENATOR MAZIARZ:  Okay, that's fine.

      25             Thank you.







                                                                  36
       1             We appreciate it.

       2             GIL QUINONES:  Thank you very much.

       3             RAJENDRA ADDEPALLI:  Thank you.

       4                  (Pause in the hearing.)

       5                  (The hearing resumed, as follows:)

       6             SENATOR MAZIARZ:  Thank you.

       7             Our next appearance is by Stuart Nachmias,

       8      the vice president of energy policy for Con Edison.

       9             Stuart.

      10             Thank you very much for being here.

      11             Thank you very much.

      12             STUART NACHMIAS:  Thank you.

      13             Good morning, Senator Maziarz,

      14      Senator Ritchie.

      15             SENATOR MAZIARZ:  Good morning.

      16             STUART NACHMIAS:  My name is Stuart Nachmias,

      17      and I'm Con Edison's vice president for energy

      18      policy and regulatory affairs.

      19             And thank you for the opportunity to present

      20      our views on the Indian Point contingency plan

      21      currently before the New York State Public Service

      22      Commission.

      23             I'd like to note up front, that in developing

      24      and presenting the Indian Point contingency plan,

      25      Con Ed took, and continues to take, no position on







                                                                  37
       1      whether Indian Point should close or is likely to

       2      close.

       3             However, it has, and continues to be, our

       4      position that if policymakers determine that

       5      Indian Point will be shut down, a plan to replace

       6      the electricity output of the facility needs to be

       7      developed and in place prior to any shutdown.

       8             On November 30, 2012, the New York State

       9      Public Service Commission issued an order, stating

      10      that the loss of Indian Point Energy Center could

      11      result in significantly reduced reliability at the

      12      time of shutdown, and for several years thereafter

      13      until replaced.

      14             According to the commission, the value of a

      15      reliability contingency plan to address reliability

      16      concerns associated with the closure of the nuclear

      17      power plants at the Indian Point Energy Center is

      18      increasingly apparent.

      19             Accordingly, the commission's order required

      20      that Con Edison, in conjunction with the New York

      21      Power Authority, develop a contingency plan to

      22      address the needs that would result for the summer

      23      of 2016 if Indian Point were to retire.

      24             The plan would enable the State to be ready

      25      for the closure of such a large generation facility,







                                                                  38
       1      whether or not the facility is actually closed at

       2      that time.

       3             In other words, the directive in the

       4      commission's November 30th order indicates that the

       5      commission has deemed it necessary and appropriate

       6      for the State to pursue a policy that prepares for

       7      the possible closure of Indian Point, even though

       8      that decision has not yet been made.

       9             Just a bit about the Indian Point Energy

      10      Center facility:

      11             I think it was mentioned by the prior folks,

      12      it's owned by Entergy, and consists two nuclear

      13      facilities, Units 2 and 3, each capable of producing

      14      approximately 1,020 megawatts, for a total of

      15      slightly over 2,000 megawatts, and they operate

      16      under a license from the Nuclear Regulatory

      17      Commission.

      18             It's our understanding Entergy has submitted

      19      a timely request to the Nuclear Regulatory

      20      Commission to extend its license, which is currently

      21      pending.

      22             Indian Point's annual energy output of,

      23      roughly, 16,000 -- million-megawatt hours accounts

      24      for approximately 30 percent of Con Edison's service

      25      area's annual consumption -- that's 10 percent of







                                                                  39
       1      the state's consumption -- and, it's currently

       2      required to maintain electric system reliability in

       3      the state.

       4             If replacement resources are not in place

       5      prior to a shutdown of Indian Point, the

       6      New York ISO may be required, at certain times and

       7      under conditions, to interrupt customers to match

       8      electric supplies with customer demand.

       9             The shutdown of the Indian Point units would

      10      also increase the price of electricity for

      11      consumers.

      12             Indian Point's electricity also provides

      13      economic and environmental benefits to our region

      14      and to other New York State electricity consumers.

      15             The shutdown of the units would increase the

      16      price of electricity for consumers, would increase

      17      greenhouse gases and other air emissions in the

      18      region, and would potentially impact the local

      19      economy.

      20             The shutdown would also adversely affect the

      21      fuel mix used to generate electricity in

      22      southeastern New York, resulting in the increased

      23      use of fossil-fuel-based supplies.

      24             As a result of these potential impacts, new

      25      facilities and infrastructure must be built and







                                                                  40
       1      placed into service before a permanent shutdown can

       2      occur.

       3             This means new transmission and replacement

       4      resources will need to be designed, receive all

       5      required permits, be constructed, tested, and placed

       6      into operation ahead of such shutdown in order to

       7      avoid reliability-criteria violations and other

       8      negative impacts.

       9             Further, it's our understanding, that while

      10      the license-renewal process will take many years,

      11      the final decision could happen very quickly, and

      12      once that decision happens, a shutdown, if it's

      13      required, would happen quickly as well.

      14             In response to the commission's directive, on

      15      February 1, 2013, Con Edison and the New York Power

      16      Authority filed a proposed Indian Point contingency

      17      plan.

      18             The plan focused on responding to the

      19      commission's order, and presenting the commission

      20      with realistic and cost-effective options to have

      21      alternative sources of energy in place should

      22      Indian Point close, and to meet the earliest

      23      possible date that such closure could impact the

      24      state's energy system, which is by the summer of

      25      2016.







                                                                  41
       1             In developing the plan, we considered the

       2      project should make sense even if Indian Point were

       3      to remain open, which is a possible outcome.

       4             The proposed plan featured the following

       5      elements:

       6             As was stated, we identified the reliability

       7      need to be approximately 1,450 megawatts in the

       8      summer of 2016 should Indian Point shut down.

       9             We have a proposal to implement approximately

      10      100 megawatts of peak-demand reduction, in

      11      conjunction with Con Edison, NYSERDA, and the

      12      New York Power Authority.

      13             Con Edison and NYPA proposed to begin

      14      development of three transmission solutions with,

      15      PFC approval, so they can be in place by the summer

      16      of 2016.

      17             An RFP was issued by NYPA, to solicit other

      18      new incremental generation and transmission

      19      proposals from third parties that could be in place

      20      by summer of 2016.

      21             A mechanism that would enable the commission

      22      to halt project development if it becomes clear that

      23      the projects are not needed by 2016, while also

      24      providing for cost recovery to developers of actual

      25      costs incurred up to that time.







                                                                  42
       1             And, we requested an independent evaluation

       2      of all proposals by the Department of Public

       3      Service, which would then recommend to the

       4      commission which projects should move forward to

       5      completion.

       6             The plan emphasized that it was essential

       7      that work begin promptly, with the suggested

       8      schedule to have facilities in place by summer of

       9      2016.

      10             One of the key elements of our plan was the

      11      proposal for Con Edison and NYPA to move forward

      12      with three transmission projects:

      13             A second 345-kV transmission line from Ramapo

      14      to Rock Tavern;

      15             The unbottling of generation on Staten Island

      16      via transmission investments;

      17             And, third, a Marcy South Series Compensation

      18      Project from Fraser to Cooper Corners

      19      reconductoring.

      20             The three projects were included in the plan

      21      for two key reasons:

      22             First, due to the nature of the projects, we

      23      would be able to build and construct them and have

      24      them in place by the summer of 2016;

      25             And, second, these projects will provide







                                                                  43
       1      benefits to consumers throughout New York,

       2      including, increasing electricity flows across the

       3      state's transmission system, enhancing economic

       4      development in the form of job creation during

       5      construction, and ongoing operations, stabilizing,

       6      and potentially increasing local tax revenues and

       7      enhancing wholesale power-market competition.

       8             Of course, these projects would also

       9      alleviate most, but not all, of the needs resulting

      10      from the shutdown of the Indian Point Energy Center.

      11             The Indian Point contingency plan lays out

      12      options for the State to prepare for a possible

      13      Indian Point Energy Center shutdown.

      14             It proposes transmission projects that make

      15      sense for customers throughout the state even if the

      16      plant is still in service, and presents a mechanism

      17      to add new third-party resources that would be

      18      needed if the plant is shut down.

      19             In other words, the plant is a roadmap for

      20      advancing projects that support the future of the

      21      state's electric infrastructure, while, at the same

      22      time, preparing for the potentially large-impact

      23      event, the shutdown of Indian Point.

      24             Moreover, since the plan is developed to

      25      benefit customers both with and without







                                                                  44
       1      Indian Point, Con Edison has proposed, and other

       2      New York transmission owners have supported, that

       3      the costs associated with the transmission projects

       4      should be shared across the state, with the heaviest

       5      share of cost being paid by downstate customers,

       6      from the Lower Hudson Valley, south.

       7             We believe such a cost allocation makes

       8      sense, as benefits from these transmission projects

       9      will accrue throughout the state.

      10             In summary, because of the significant size

      11      of the Indian Point Energy Center and the potential

      12      impact of such a large shutdown, should it occur as

      13      a result of state policy, it's reasonable to pursue

      14      a contingency plan now.

      15             Our contingency plan recognizes that we need

      16      to be prepared for that potential shutdown of

      17      Indian Point, and will also support an electricity

      18      system that can both be reliable and resilient to

      19      support the state's future.

      20             Thank you for the opportunity to discuss our

      21      perspectives on the Indian Point contingency plan,

      22      and I'm available to respond to any questions that

      23      you may have.

      24

      25







                                                                  45
       1             SENATOR MAZIARZ:  Thank you very much,

       2      Mr. Nachmias.

       3             We appreciate your appearance here today very

       4      much.

       5             I do want to just note for the record that

       6      we've been joined by my colleague

       7      Senator David Carlucci.

       8             Senator, thank you very much for being here.

       9             I did indicate at the beginning of the

      10      hearing that you were on your way, so, I did do

      11      that.

      12             Mr. Nachmias, let me go right to, I think,

      13      maybe the very last point that you made, that sort

      14      of jumped off the page at me, where you said

      15      something that seemed to me to controvert what

      16      Mr. Quinones and Mr. Addepalli said earlier, that

      17      the costs of a potential shutdown of Indian Point

      18      should be shared across the state by people who

      19      benefit from it.

      20             "Across the state," to me, includes

      21      North Tonawanda, New York, where I live, and get

      22      no -- absolutely no benefit at all from

      23      Indian Point, and, Senator Ritchie's area up in the

      24      North Country.

      25             Why would you contend that the cost should be







                                                                  46
       1      borne by people who live there?

       2             STUART NACHMIAS:  Well, these projects are

       3      being done for a variety of reasons, and one is

       4      public policy, and, there are benefits from these

       5      projects across the state.

       6             So, in addition to --

       7             SENATOR MAZIARZ:  What are the benefits?

       8             STUART NACHMIAS:  In addition to the capacity

       9      and energy benefits, there are opportunities for

      10      additional renewables development, and there have

      11      been proposals for wind resources in the upstate

      12      area.

      13             The project also increases the flow of energy

      14      from upstate to downstate, which will allow more

      15      generators upstate to be dispatched.

      16             It provides additional stabilization, in

      17      terms of jobs, in terms of tax revenues, in those

      18      local communities, and potentially keeps some of

      19      those units in service.

      20             I think we heard that some of the local

      21      retirements of generators in various parts of the

      22      state potentially result in local issues there.

      23             So there are benefits across the state, and

      24      so we do think it's appropriate that consumers

      25      across the state pay for these transmission







                                                                  47
       1      solutions, but we do have a proposal that has the

       2      heaviest share of those costs to the downstate

       3      region.

       4             SENATOR MAZIARZ:  So what you're saying is,

       5      that costs would be shared, but the heaviest

       6      burden -- the heaviest financial burden, let's say,

       7      would be borne by ratepayers within the Con Edison

       8      service territory?

       9             Is that --

      10             STUART NACHMIAS:  It's by ratepayers in the

      11      southern part of the state, so, it's not only

      12      Con Edison.

      13             SENATOR MAZIARZ:  Well, right --

      14             STUART NACHMIAS:  Yeah, but in the southern

      15      part of the state?

      16             SENATOR MAZIARZ:  -- but I assume Con Ed has

      17      the overwhelming majority --

      18             STUART NACHMIAS:  Yes.

      19             SENATOR MAZIARZ:  -- of those ratepayers.

      20             STUART NACHMIAS:  Yes.

      21             SENATOR MAZIARZ:  So, again, I will go back

      22      to the beginning of your statement.

      23             STUART NACHMIAS:  Sure.

      24             SENATOR MAZIARZ:  I wanted to start there at

      25      the end, because that one had the most impact,







                                                                  48
       1      but -- at least the most impact on me.

       2             You indicated very clearly, that if

       3      Indian Point -- if this contingency plan held that

       4      be Indian Point were to close down, that there would

       5      be a price increase for consumers, and that air

       6      quality would suffer?

       7             Did I hear that correctly?

       8             Or --

       9             STUART NACHMIAS:  From a greenhouse-gas

      10      perspective, certainly, Indian Point is a favorable

      11      plant, and so there would be, certainly.

      12             And also from a cost perspective, on a

      13      marginal cost basis.

      14             So, there would be both cost impacts and

      15      environmental impacts.

      16             We do think that our proposed projects

      17      mitigate the cost that would otherwise be incurred

      18      without them.

      19             So, it would allow the dispatch of the most

      20      economically efficient and cleanest generation from

      21      around the state, and would allow for development of

      22      renewables.

      23             So, we do think that the proposal we have

      24      would mitigate those impacts, but there still would

      25      be impacts from the result of Indian Point closing.







                                                                  49
       1             SENATOR MAZIARZ:  Well, I've got other points

       2      to make, but I want to turn it over to my

       3      colleagues.

       4             Senator Ritchie.

       5             SENATOR RITCHIE:  So I, of course, have a

       6      huge concern when you say that the cost is going to

       7      be borne across the entire state, for a number of

       8      reasons.

       9             I represent St. Lawrence County, with the

      10      NYPA facility.

      11             I know Senator Maziarz has a NYPA facility

      12      out in his area.

      13             And I already think that my area gets

      14      shortchanged when it comes to what happens there.

      15             Secondly, I have three nuclear power plants

      16      in Central New York and Oswego that could increase

      17      their generating capacity, from what I'm told,

      18      except for, there's an issue with the congestion

      19      with the transmission lines.

      20             So I'm not sure how I could possibly be

      21      supportive of a plan that would increase the rates

      22      to those in my district, considering we have a NYPA

      23      facility there, that we already ship power out; we

      24      have three nuclear plants, that we ship out; but

      25      have capacity to actually do more, if we could do







                                                                  50
       1      something about the transmission issue.

       2             And, you know, I noticed earlier that --

       3      during the contingency plan, apparently, there are

       4      three transmission lines that they're looking at.

       5             I guess, for me, I wonder why the

       6      transmission issue that's causing the congestion

       7      from those in Central New York and Western New York

       8      is not the first one on the top of this list, versus

       9      the three that are listed.

      10             So, I definitely have concerns.

      11             And, you know, the same as what

      12      Senator Maziarz said, it seems to be in direct

      13      contrast to what we just heard from the two previous

      14      speakers.

      15             STUART NACHMIAS:  So, thank you, and good

      16      morning.

      17             Exactly what you describe, these projects --

      18      by the way, two of these three projects are also in

      19      another proceeding before the Public Service

      20      Commission, to relieve that congestion and allow

      21      additional power to flow from upstate to downstate.

      22             And in recognition of that, we have proposed

      23      that the beneficiaries are across the state, and

      24      that there are some additional costs, but there

      25      would be commensurate benefits.







                                                                  51
       1             Ultimately, you know, the cost allocation

       2      that gets approved will be done by the regulators.

       3             They will consider, you know, the cost of the

       4      projects, and the potential benefits, including the

       5      benefits that we have suggested.

       6             But it is exactly, I think, the point that

       7      you just made with generation in upstate, that could

       8      be dispatched further and provide additional flow

       9      that would benefit those generators.

      10             Those are clean, efficient resources.

      11             They're good for the state, and would be a

      12      benefit across the state.

      13             SENATOR RITCHIE:  You can correct me if I'm

      14      wrong, but I thought you just said that Indian Point

      15      was a clean generation there too?

      16             STUART NACHMIAS:  Well, that's true, but this

      17      plan is what -- what would be the dispatch, both

      18      with or without Indian Point.

      19             And, certainly, in the case without

      20      Indian Point, Indian Point is, certainly, from a

      21      greenhouse-gas perspective, a clean plant, but there

      22      would be additional dispatch that would happen, and

      23      we want the cleanest, most efficient dispatch.

      24             And, so, the additional transmission would

      25      allow that, so it would mitigate what impacts would







                                                                  52
       1      potentially happen without these solutions.

       2             SENATOR RITCHIE:  So I guess I will just ask

       3      you:

       4             How would you propose that I would go back to

       5      the district that I represent, or any of the

       6      North Country that myself or Senator Little

       7      represents, and tell them that they're now going to

       8      bear the cost of what's -- or, at least part of the

       9      cost with regards to the retiring of Indian Point,

      10      if that proceeds?

      11             STUART NACHMIAS:  I think, you know, that the

      12      Public Service Commission has considered all the

      13      benefits.

      14             There are a variety of environmental

      15      benefits, benefits to local generators, local jobs

      16      in the upstate communities, property taxes that are

      17      supported, by the fact that these projects do allow

      18      additional flow of power across the state, and that

      19      is something that was viewed in a process through

      20      regulators, and those benefits were all considered.

      21             SENATOR RITCHIE:  I just have one other

      22      question.

      23             I see that you're the co-author of the plan

      24      with NYPA.

      25             I guess I would like to know how that came







                                                                  53
       1      about.

       2             STUART NACHMIAS:  It was a -- the order by

       3      the Public Service Commission ordered Con Edison and

       4      NYPA to submit the plan; and, so, that's what we

       5      did.

       6             SENATOR RITCHIE:  Senator Maziarz.

       7             SENATOR MAZIARZ:  Thank you, Senator Ritchie.

       8             Senator Carlucci.

       9             SENATOR CARLUCCI:  Yeah, thank you,

      10      Chairman Maziarz.

      11             Just a question, you had talked about

      12      economic development.

      13             Could you elaborate on some of those

      14      proposals; specifically, you mentioned Ramapo to

      15      Rock Tavern?

      16             STUART NACHMIAS:  So, thank you, and welcome.

      17             It's nice to see you.

      18             The Ramapo-Rock Tavern project, there is an

      19      existing transmission line from the Rock Tavern

      20      substation, which is in central Hudson territory,

      21      through to the Ramapo substation in Orange and

      22      Rockland territory.

      23             The proposal is to add a second

      24      345-kV transmission line along that right-of-way,

      25      so, it is using an existing right-of-way.







                                                                  54
       1             It's a project that had -- got its Article 7

       2      permitting back in the 1970s.

       3             And, so, there are certainly going to be jobs

       4      that result from the construction work to install

       5      that, that additional feeder.

       6             SENATOR CARLUCCI:  Do you have any numbers in

       7      terms of proposed jobs or estimates?

       8             STUART NACHMIAS:  You know, I don't have that

       9      number offhand, but, the project is a, roughly,

      10      $125-million project.

      11             SENATOR CARLUCCI:  And, then, would there be

      12      an increase in property taxes that would have to be

      13      paid?

      14             STUART NACHMIAS:  Well, to the extent that

      15      transmission -- you know, transmission assets do pay

      16      taxes, so there could be taxes associated with that.

      17             But also importantly, that transmission line

      18      enables more power to flow from upstate to

      19      downstate, so there will be more generation

      20      dispatched in the upstate area, and that helps

      21      support, I think, the financial viability of some of

      22      those units, with their associated taxes.

      23             SENATOR CARLUCCI:  You mentioned the second

      24      345 line.

      25             What does that mean in terms of generation,







                                                                  55
       1      or, in terms of moving electricity?

       2             STUART NACHMIAS:  So two of the solutions,

       3      that project, together with the project that the

       4      New York Power Authority is implementing called the

       5      "Marcy South Series Compensation," those

       6      two projects, together, will move about another

       7      400 megawatts of power, to flow from upstate into

       8      the southeast New York region.

       9             SENATOR CARLUCCI:  Thank you.

      10             SENATOR MAZIARZ:  I'm sorry, were you

      11      finished, Senator?

      12             SENATOR CARLUCCI:  Yes, thank you.

      13             SENATOR MAZIARZ:  Thank you very much.

      14             Mr. Nachmias, I just wanted to make a couple

      15      more points.

      16             You know, you mentioned about the potential

      17      closure, and encouraging renewables, and that

      18      everyone should share in the cost of that.

      19             You know, this Committee, with

      20      Senator Carlucci, Senator Ritchie, myself, the other

      21      members, and with the Assembly, and certainly with

      22      Governor Cuomo, have done a lot in the last

      23      two years to encourage renewables, to incentivize

      24      renewable energy, particularly solar, wind, and so

      25      forth.







                                                                  56
       1             But I have to tell you, it is very difficult.

       2             It is a lot easier said than done.

       3             I am currently involved in my district with a

       4      wind-generation project, which has pitted neighbor

       5      versus neighbor, family member versus family member,

       6      animosity that will last generations, over the

       7      siting of one windmill on a farm.

       8             The Power Authority just, probably, two or

       9      three years ago, not under the leadership -- I want

      10      to make it very clear -- not under the leadership of

      11      Gil Quinones, spent, probably, millions of dollars

      12      on an offshore wind project in Upstate New York, in

      13      Lake Ontario and Lake Erie, that, after spending

      14      millions of dollars on, went bust.

      15             So, you know, again, that was public money

      16      that was spent for siting of renewable sources.

      17             Not that -- not that -- I want to be very

      18      clear, I'm not opposed to that, this Committee is

      19      not opposed to that.

      20             We've done everything to encourage that.

      21             But to say to take 2,000-plus megawatts off

      22      the grid and it's going to be replaced by renewables

      23      in Upstate New York, or that -- you know, that's

      24      just very difficult.

      25             Very difficult.







                                                                  57
       1             And I want -- I know you represent -- or, I'm

       2      sorry, are affiliated with a company in the far --

       3      the far eastern region.

       4             And I just wanted to let you know, and

       5      I think Senator -- I believe Senator Ritchie would

       6      agree with me, I certainly don't speak for her, but,

       7      it's a lot easier said than done.

       8             Thank you.

       9             Any other questions?

      10             Oh, I'm sorry.

      11             Senator Carlucci.

      12             SENATOR CARLUCCI:  The plan that's put forth,

      13      have you taken into considering, like

      14      Senator Maziarz talked about, renewable energy

      15      sources that are coming online, or new conservation

      16      practices?

      17             How about new projects that are online to be

      18      built, or proposed?

      19             Was that taken into consideration?

      20             STUART NACHMIAS:  Well, the New York ISO, in

      21      its planning process, would already consider

      22      projects that are moving along in the pipeline, in

      23      its plan, so, anything incremental to that would be

      24      eligible.

      25             And certainly the thought was, that we could







                                                                  58
       1      facilitate some incremental renewable energy.

       2             Also, there's a 100-megawatt component of the

       3      plan that focuses on energy efficiency, demand

       4      response, support of some localized CHP.

       5             So, there's a variety of components of the

       6      plan that would address some of the elements that

       7      you speak to.

       8             SENATOR CARLUCCI:  Are you aware if the --

       9      there's a proposed desalinization plant in

      10      Rockland County.

      11             Has that been taken into consideration with

      12      the plan, in terms of energy consumption?

      13             STUART NACHMIAS:  Not that I could speak to

      14      right now, that I'm aware of.

      15             I guess, if that is already in the load

      16      forecasts, then it might be, but, I don't know

      17      whether or not it is yet in the load forecast.

      18             SENATOR MAZIARZ:  Any other comments or any

      19      anything you'd like to add, or any observations you

      20      would make on that?

      21             STUART NACHMIAS:  I appreciate the

      22      opportunity.

      23             I think my comments, and the comments from

      24      the folks before, are somewhat aligned, in terms of

      25      moving forward, and just preparing the State.







                                                                  59
       1             But I appreciate the opportunity to be here

       2      today.

       3             Thank you.

       4             SENATOR MAZIARZ:  I would make this

       5      observation, though, Mr. Nachmias, that, you know,

       6      you represent the -- you know, the private sector in

       7      the energy field; you know, and Mr. Quinones and

       8      Mr. Addepalli represent, kind of, the public sector,

       9      public agencies.

      10             You know, so -- you know -- and I realize you

      11      started off by saying that Con Ed does not take a

      12      position on the open or closure of it, and I can

      13      appreciate that.

      14             But, eventually, you know, down the road,

      15      we're going to need your type of expertise -- they

      16      are going to need your type of expertise on what's

      17      best for your customers.

      18             Thank you.

      19             STUART NACHMIAS:  Thank you.

      20             SENATOR MAZIARZ:  Our next appearance will be

      21      by T. Michael Twomey, the vice president, external

      22      affairs, from Entergy Wholesale Commodities.

      23             Hi, Mike.

      24             T. MICHAEL TWOMEY:  Good morning.

      25             SENATOR MAZIARZ:  Thank you very much for







                                                                  60
       1      being here today.

       2             T. MICHAEL TWOMEY:  Thank you for inviting

       3      me.

       4             SENATOR MAZIARZ:  How's business?

       5             T. MICHAEL TWOMEY:  Well --

       6             SENATOR MAZIARZ:  My father would say,

       7      "It could always be better."

       8             T. MICHAEL TWOMEY:  Could always be better.

       9             Good morning, Senator Maziarz,

      10      Senator Ritchie, Senator Carlucci.

      11             I appreciate the opportunity to appear at

      12      this hearing.

      13             My name is Mike Twomey and I am the

      14      vice president, external affairs, for

      15      Entergy Wholesale Commodities.

      16             Entergy Corporation, the owner of

      17      Indian Point, is one of the largest nuclear

      18      operators in the United States.

      19             It purchased Indian Point Unit 3 and the

      20      James A. Fitzpatrick facility in Oswego in 2000 from

      21      NYPA, and Indian Point Unit 2 was purchased from

      22      Con Edison in 2001.

      23             In the last 10 years, Entergy has invested

      24      more than $1 billion in the Indian Point facility,

      25      including hundreds of millions of dollars to







                                                                  61
       1      strengthen and enhance safety and security.

       2             Indian Point provides the following economic

       3      benefits:

       4             More than 1,000 full-time jobs that generate

       5      more than $140 million in annual employee payroll,

       6      more than $350 million in annual local purchases,

       7      approximately $75 million in annual property-tax

       8      payments and value-sharing-agreement payments to

       9      state and local governments, and more than

      10      $1 million in annual charitable contributions to

      11      non-profit organizations located within the

      12      Lower Hudson Valley and New York City.

      13             According to an economic study done by the

      14      Nuclear Energy Institute in 2004, Indian Point

      15      generates close to $1 billion in annual economic

      16      activity for the region.

      17             Indian Point has an excellent safety record

      18      and ranks among the most reliable in the nation.

      19             The NRC reporting regime includes full-time

      20      resident inspectors who have unrestricted access to

      21      plant information, as well as to any and all

      22      personnel.

      23             For 2012, Indian Point, once again,

      24      maintained all "green" NRC performance indicators

      25      and inspection findings following more than 11,000







                                                                  62
       1      hours of review by that independent agency, placing

       2      the station in the overall "green" category of the

       3      NRC's oversight program.

       4             According to the New York ISO, Indian Point

       5      currently provides between 25 percent and 30 percent

       6      of the electricity needed to serve New York City and

       7      significant parts of Westchester County, supplying

       8      approximately 2,000 megawatts of baseload power to

       9      homes, businesses, municipalities, hospitals, and

      10      other critical regional infrastructure.

      11             According to a study prepared by

      12      Charles River Associates commissioned by the

      13      New York City Department of Environmental Protection

      14      in 2011, Indian Point's retirement would lead to a

      15      2- to 3-billion-dollar increase in wholesale energy

      16      costs through 2030 for New York City consumers.

      17             Statewide, the increase would be 10 to

      18      12 billion for the same period.

      19             These increased wholesale energy costs would

      20      be in addition to the cost of building new

      21      generation and transmission infrastructure, which we

      22      believe would be at least 2000 -- excuse me, at

      23      least $2 billion based on most likely scenarios.

      24             New Yorkers already pay the highest statewide

      25      average residential electric rates in the contiguous







                                                                  63
       1      United States, based on 2012 data from the

       2      Energy Information Administration.

       3             Mr. Nachmias mention this had earlier:

       4             According to the CRA report, New York would

       5      see approximately a 15 percent increase in carbon

       6      emissions under most conventional scenarios, with,

       7      roughly, a 7 to 8 percent increase in nitrogen oxide

       8      commissions.

       9             Nuclear power plants do not burn hydrocarbons

      10      to generate electricity so they produce, virtually,

      11      no greenhouse gases.

      12             In 2011 alone, U.S. nuclear plants prevented

      13      the release of more than 600 million metric tons of

      14      carbon dioxide into the atmosphere.

      15             This is nearly as much carbon dioxide as is

      16      released annually from all U.S. passenger cars.

      17             Proposed national and regional

      18      carbon-reduction goals simply cannot be met without

      19      nuclear plants.

      20             Some critics of the facility mischaracterize

      21      Indian Point's contribution to the regional grid by

      22      looking only at the amount of power it delivers to

      23      utilities under purchase-power agreements, including

      24      a 500-megawatt purchase-power agreement with Con Ed

      25      we have in place through 2017, rather than looking







                                                                  64
       1      at the total amount of power the plant provides.

       2             In fact, utilities typically supply their

       3      needs with a mix of PPAs and open-market

       4      purchases.

       5             The mix of these purchases from Indian Point

       6      can change, but approximately 2,000 megawatts from

       7      the facility is continuously provided to the

       8      New York electric system.

       9             Indian Point submitted an application for a

      10      renewed operating license to the NRA in April 2007.

      11             The NRC staff has issued a final supplemental

      12      environmental impact statement and a final

      13      supplemental -- excuse me, safety-evaluation report,

      14      both of which support license renewal.

      15             Before the NRC can issue a final decision on

      16      Indian Point's license-renewal application, however,

      17      it must resolve 13 pending contentions filed by

      18      New York State and two environmental organizations.

      19             Nine of these contentions were tried before

      20      the ASLB in 2012, and the remaining four will be

      21      likely tried in early 2014.

      22             The Indian Point license-renewal proceeding

      23      is the most complex license-renewal proceeding ever

      24      conducted by the NRC.

      25             It will not be completed for several years.







                                                                  65
       1             The Timely-Renewal Doctrine established in

       2      the federal Administrative Procedure Act, and

       3      incorporated in NRC regulations, provides that if a

       4      licensee submits a timely application for license

       5      renewal, then the existing license does not expire

       6      until the application has been finally determined by

       7      the agency.

       8             The NRC regulations require reactor licensees

       9      to submit license-renewal applications five years

      10      before expiration in order to qualify for

      11      timely-renewal protection.

      12             Indian Point submitted its application for

      13      license renewal more than five years before the

      14      expiration of the existing Indian Point licenses.

      15             Therefore, until the NRC license-renewal

      16      process is complete, the current operating licenses

      17      for Indian Point Units 2 and 3 will not expire, but

      18      will, instead, be extended by operation of federal

      19      law.

      20             The NRC has completed specific inspections of

      21      Indian Point designed for licensees who will likely

      22      operate under the Timely-Renewal Doctrine.

      23             Over the weekend, on September 28th,

      24      Indian Point Unit 2 entered the period of extended

      25      operations, after receiving notifications from the







                                                                  66
       1      NRC that the plant had passed the appropriate

       2      inspections, and provided the NRC with the requisite

       3      assurances that various commitments are being met

       4      and will continue to be met.

       5             Going forward, the NRC's regulations will

       6      continue in full force during the timely-renewal

       7      period.

       8             In connection with the license-renewal

       9      application, Indian Point has made appropriate

      10      filings with the New York State Department of

      11      Environmental Conservation and the New York State

      12      Department of State to address state-related

      13      license-renewal issues.

      14             Given the limited time available for this

      15      hearing, I will not discuss those filings in detail.

      16             I would simply like to note that the record

      17      before NYSDEC demonstrates that Indian Point is

      18      entitled to a water-quality certificate.

      19             Indian Point's operations are protective of

      20      the Hudson River which is in better shape today than

      21      it was in 1973.

      22             And, with respect to NYSDOS, the record is

      23      clear that Indian Point either does not need a new

      24      consistency determination under the Coastal Zone

      25      Management Act, or, in the alternative, is entitled







                                                                  67
       1      to such a determination under the standards

       2      applicable to such a request.

       3             Finally, as part of the license-renewal

       4      proceeding, the NRC accepted public comments.

       5             More than 200 business, community, and labor

       6      groups from New York submitted comments in support

       7      of license renewal, including The Business Council

       8      of New York State, the Partnership for New York

       9      City, the New York Urban League, the New York Energy

      10      Consumers Council, the NAACP New York State

      11      Conference, the Westchester County Association, the

      12      New York State AFL-CIO, and Teamsters Joint

      13      Council 16, among others.

      14             The reliability contingency plan proceeding:

      15             In a November 30, 2012, order, the New York

      16      PSC opened a docket to evaluate the potential

      17      retirement of Indian Point.

      18             While the PSC recognized that Indian Point

      19      has a pending license-renewal application, it,

      20      nevertheless, directed Con Edison, with the

      21      assistance of NYPA, to develop and file a

      22      reliability contingency plan.

      23             On February 1, 2013, Con Edison and NYPA

      24      filed a joint plan in which they proposed a set of

      25      three transmission projects and an incremental







                                                                  68
       1      100-megawatt energy-efficiency program that would

       2      cost customers, in total, according to the filing,

       3      more than $800 million.

       4             While that figure has received a lot of

       5      attention in the media, it is important to note that

       6      those projects would not come close to replacing

       7      Indian Point's full 2,000 megawatts of capacity.

       8             The total cost of replacing Indian Point's

       9      capacity would likely be 2 to 2 1/2 billion dollars:

      10      the 800 million for the projects referenced above,

      11      and, at least one 1,000-megawatt CCGT, which would

      12      cost approximately 1 to 1 1/2 billion dollars.

      13             The 2- to 2 1/2-billion-dollar figure

      14      represents infrastructure and program costs only,

      15      and does not include the higher energy costs that

      16      would also be incurred.

      17             Indian Point submitted an alternative

      18      proposal in response to the NYPA RFP.

      19             Our proposal offers the most economic

      20      alternative to any of the other options because it

      21      is based on market pricing which is substantially

      22      lower than the cost of constructing new resources.

      23             Entergy submitted a proposal to provide

      24      competitively-priced electricity from Indian Point

      25      beginning in 2016, and requiring no public







                                                                  69
       1      subsidies.

       2             Entergy's proposal would save billions of

       3      dollars in unnecessary expenditures.

       4             The best reliability contingency plan for

       5      New York is to support Indian Point relicensing.

       6             Mr. Quinones referred to the reliability

       7      contingency plan as an insurance policy.

       8             Well, it's an insurance policy they're

       9      proposing for an event that New York can prevent

      10      from happening.

      11             The only uncertainty, with respect to

      12      Indian Point relicensing, concerns arguments and

      13      positions taken by New York State.

      14             Entergy will continue to urge New York State

      15      agencies to work collaboratively with the company to

      16      reduce any license-renewal uncertainty.

      17             In addition, we remain willing to work with

      18      New York State agencies and public utilities in a

      19      constructive manner to continue to provide New York

      20      consumers with a safe, reliable, and environmentally

      21      beneficial source of power.

      22             This concludes my prepared remarks, and I'm

      23      available to answer questions.

      24

      25







                                                                  70
       1             SENATOR MAZIARZ:  Thank you very much,

       2      Mr. Twomey.

       3             I'm going to turn it over to my colleagues

       4      first before I ask my questions.

       5             Senator Ritchie.

       6             SENATOR RITCHIE:  You talked about the safety

       7      record at the plant.

       8             Could you just elaborate on specifics?

       9             Has there ever been a leak?

      10             Has there ever been an issue where you had to

      11      evacuate the plant?

      12             I mean, could you just elaborate on the

      13      safety issue?

      14             T. MICHAEL TWOMEY:  I'm not aware of any

      15      situation where we had to evacuate, but, there

      16      certainly are, from time to time, in any industrial

      17      facility, there are steam leaks, there are other

      18      activities.

      19             The NRC, and the nuclear industry, requires a

      20      level of reporting that is unmatched in any

      21      industrial enterprise.

      22             We are more transparent than any industrial

      23      facility, and as a result, any routine, to minor, to

      24      more serious event, is reported, is discussed, is

      25      reviewed, is corrected, and is dealt with.







                                                                  71
       1             And the safety record, overall, for the

       2      facility, which has been operating for more than

       3      40 years, is better than, or as good at least, as

       4      any industrial facility in the country.

       5             SENATOR RITCHIE:  Could you just explain to

       6      me what happened at the Vermont Yankee plant?

       7             T. MICHAEL TWOMEY:  Yes.

       8             Vermont Yankee is a relatively small nuclear

       9      facility, a little over 600 megawatts, and, it

      10      operates in the New England Independent System

      11      Operator zone.

      12             It is a standalone unit, so it doesn't have

      13      the benefit of, for example, Indian Point is a

      14      two-unit site, so there are economies of scale.

      15             Your overhead costs are spread across two

      16      units.

      17             So, for example, we have to provide security

      18      at Vermont Yankee for one unit that produces only

      19      600 megawatts.

      20             We also provide security at Indian Point

      21      which has 2,000 megawatts.

      22             So, in a sense, you're dealing with

      23      Vermont Yankee, with a small facility, that doesn't

      24      generate the same level of revenue, but incurs many

      25      of the same costs.







                                                                  72
       1             And with the low price of natural gas

       2      recently in the last couple of years, that facility

       3      became less competitive in the marketplace, and

       4      that's because, although there is a relatively low

       5      cost to produce electricity, which is what the price

       6      is based on that the plant receives from the market,

       7      the overhead costs are higher, and their regulatory

       8      costs, there are increased investments that we've

       9      made in the plant.

      10             We have invested more than $400 million in

      11      Vermont Yankee since we bought it.

      12             And those fixed costs, those overhead costs,

      13      you do not get in market pricing.

      14             So as those costs either stay steady or

      15      increase, you don't have an ability to recover

      16      those; only your production costs.

      17             And, ultimately, that facility, we made the

      18      very tough decision that it was not economical to

      19      continue to operate it.

      20             And as a result, we've announced that that

      21      facility will cease power production at the end of

      22      the current operating cycle, which is expected to be

      23      at the end of 2014.

      24             SENATOR RITCHIE:  Are there similarities

      25      between that facility and Fitzpatrick?







                                                                  73
       1             T. MICHAEL TWOMEY:  There are many, quite

       2      frankly.

       3             Fitzpatrick, from our perspective, is also a

       4      single-unit facility.

       5             It's also in a difficult market, and it is

       6      situated in a way that is not unlike Vermont Yankee.

       7             We have announced, and we did announce, the

       8      day we made the Vermont Yankee announcement, that we

       9      intend -- currently intend to refuel Fitzpatrick

      10      next October, but that is an item, quite frankly, we

      11      have to review on a regular basis.

      12             SENATOR RITCHIE:  So could you just explain

      13      to me, if Indian Point is retired, would that have

      14      any other consequences, separate, to Fitzpatrick?

      15             T. MICHAEL TWOMEY:  Well, you know, there

      16      was, what would be the effect on Fitzpatrick of a

      17      closure of Indian Point?

      18             I don't know.

      19             I mean, I will say this, we have no intention

      20      of retiring Indian Point.

      21             The only uncertainty regarding Indian Point

      22      is whether we receive the licenses from the federal

      23      Nuclear Regulatory Commission.

      24             The staff at the Nuclear Regulatory

      25      Commission, which has been looking at this question







                                                                  74
       1      for six years, has reviewed all the technical

       2      information, and I believe it's close to

       3      28,000 hours of review.

       4             They've concluded that the plant is safe and

       5      can continue to operate.

       6             The uncertainty about Indian Point's

       7      continued operation is largely due to actions by

       8      New York State.

       9             So when I discuss this, it's not that we

      10      would choose to retire it; it's that New York would

      11      withhold permits.

      12             And we've got some legal arguments that we

      13      believe are very strong, that those permits are not

      14      needed, but, nothing's a guarantee.

      15             So, we don't intend to retire Indian Point,

      16      but, if Indian Point were not to obtain the

      17      necessary licenses, I don't know what the effect on

      18      Fitzpatrick would be.

      19             I don't know that it would help very much the

      20      situation in Upstate New York because the markets

      21      are so different.

      22             You would likely see other generation built,

      23      transmission investment.

      24             You would see the 2 to 2 1/2 billion dollars

      25      get spent, which, of course, would be paid for by







                                                                  75
       1      customers;

       2             You would see higher energy bills that would

       3      be paid for my customers;

       4             And you would see degraded air quality that

       5      everybody would suffer from.

       6             SENATOR RITCHIE:  One last question:

       7             Have you seen, I guess, anything like this

       8      happening with a facility that hasn't said that it

       9      was going to look at retiring the facility, with

      10      this contingency plan being set into motion?

      11             T. MICHAEL TWOMEY:  I have not seen --

      12             I'm sorry.

      13             Senator, I have not seen anything like this.

      14             You know, you asked some questions earlier

      15      about Fitzpatrick and the upstate plants.

      16             Fitzpatrick went through a license-renewal

      17      proceeding only a few years ago.

      18             There was no objection from the State of

      19      New York to that relicensing.

      20             New York gave the permits that were needed,

      21      and the facilities were relicensed.

      22             That has not been the case with respect to

      23      Indian Point.

      24             SENATOR RITCHIE:  In your estimation,

      25      considering the way this played out with this







                                                                  76
       1      contingency plan, do you believe that it would be

       2      harder to convince people in the future to invest in

       3      facilities, considering there's -- you would never

       4      know whether this was going to come into play?

       5             T. MICHAEL TWOMEY:  I will say that it would

       6      depend on the facility.

       7             We are in a bit of a unique situation.

       8             You have had other retirements where the

       9      owners of those facilities made the decision, on an

      10      economic basis, given the marketplace, that it was

      11      not in their interests to continue to operate.

      12             In this case, Indian Point is being

      13      challenged in a way that no other generation

      14      facility in the state of New York has been

      15      challenged by the State.

      16             And, so, I guess if you were thinking about

      17      investing, you'd have to gauge, what would the risks

      18      that you might be targeted for closure, in the term

      19      of your investment recovery.

      20             SENATOR MAZIARZ:  Senator Carlucci.

      21             SENATOR CARLUCCI:  Thank you.

      22             Mr. Twomey, you talked about New York State

      23      denying permits to Indian Point.

      24             Can you elaborate on that, why do you think

      25      that is?







                                                                  77
       1             T. MICHAEL TWOMEY:  Well they haven't denied

       2      any permits yet, just to clarify.

       3             We filed an application for a water-quality

       4      certificate with the New York State Environment --

       5      Department of Environmental Conservation.

       6             The staff of NYSDEC recommended a denial.

       7             But as of today, and the application's now

       8      been pending for either three, four, maybe even

       9      five -- yeah, I guess it's four years, there's been

      10      no final action by NYSDEC, which is one of the legal

      11      arguments we've raised, is that the NRC process

      12      gives states one year to act.

      13             And it's been four years, or at least

      14      four years -- I'd have to check my dates -- but

      15      New York has not made a final decision.

      16             And with respect to the NYSDOS

      17      (New York State Department of State), we've got an

      18      application for a CZMA consistency determination

      19      pending.

      20             We believe that the record shows that we're

      21      entitled to the permits.

      22             We are in the hearing process with NYSDEC.

      23             I certainly don't want to prejudge the

      24      process.

      25             We believe our witnesses have put on a







                                                                  78
       1      compelling case.

       2             We are certainly hopeful that the outcome of

       3      that process will be positive.

       4             We've also submitted a comprehensive

       5      application to NYSDOS.

       6             We're certainly hopeful that that will be

       7      reviewed with the same standards applied to our

       8      filing, that are applied to other filings by similar

       9      facilities.

      10             SENATOR CARLUCCI:  So it boils down to the

      11      recommendation of staff from the New York State

      12      Department of Environmental Conservation?

      13             T. MICHAEL TWOMEY:  At this point, yes.

      14             SENATOR CARLUCCI:  And what were those

      15      recommendations; why were they denying this?

      16             T. MICHAEL TWOMEY:  Well, they raised various

      17      issues.

      18             They raised an issue regarding rail --

      19      radiological -- proposed radiological effects on the

      20      river.

      21             Since that time, NYSDEC has actually settled

      22      that issue with us.

      23             The staff has settled that issue with us.

      24             The biggest issue they've raised --

      25             SENATOR CARLUCCI:  So it's from the DEC, but







                                                                  79
       1      now the Department of State has --

       2             T. MICHAEL TWOMEY:  No, the DEC will issue --

       3      will make a decision regarding that question.

       4             The NYSDOS question is under the Coastal Zone

       5      Management Act, which has up to 44 policies.

       6             It's not clear to me what policies the

       7      department will find are applicable.

       8             And for those that they find applicable, it's

       9      not clear whether we will be approved or denied, on

      10      which ones.

      11             They could determine, for example, that 17 of

      12      the 44 are relevant, and we could prevail on 15 and

      13      lose on 2; we could prevail on 2 and lose on 15.

      14             We just don't know.

      15             The decision timeline for that has not run

      16      yet.

      17             So what the New York State Department of

      18      Environmental Conservation, switching back to the

      19      proposed denial by the staff, their biggest issue,

      20      I would say, is probably the question of whether we

      21      should install two Yankee Stadium-size cooling

      22      towers on the Hudson River on either side of the

      23      facility, you know, as disruptive and negative

      24      consequences as those would provoke.

      25             For example, the saline level in the







                                                                  80
       1      Hudson River is such that, if you install cooling

       2      towers, you'd have output at the top of the cooling

       3      towers that would affect people who have asthma.

       4             But, nevertheless, the NYSDEC staff has

       5      proposed that cooling towers would be a better

       6      proposal than the current cooling system.

       7             We proposed an alternative, with wedge-wire

       8      screens, that we think achieves all the objectives.

       9             But those are the issues that are being tried

      10      in front of the administrative law judges, and we

      11      don't have a decision from the judges yet.

      12             We're hopeful that our evidence will be

      13      viewed more compelling -- as more compelling than

      14      the evidence that's been submitted by the opponents.

      15             SENATOR CARLUCCI:  So, now, is this -- are

      16      they stating that there is toxins that are spilling

      17      out from the spent fuel rods?

      18             T. MICHAEL TWOMEY:  That issue has been

      19      raised by one of the environmental organizations,

      20      and I'm not sure that it is actually germane to the

      21      NYSDEC proceeding.

      22             I know that that issue's been raised by

      23      certain environmental agencies, with the NRC, but,

      24      certainly, that question's been raised from time to

      25      time.







                                                                  81
       1             And we've opposed it, and we've indicated

       2      that we don't think there's been any harm to the

       3      Hudson River, and we will continue to do so.

       4             SENATOR CARLUCCI:  So it's Entergy's belief

       5      that there has been no toxins spilled into

       6      groundwater or the Hudson River?

       7             T. MICHAEL TWOMEY:  No.

       8             What our position has been, is that, if there

       9      have been releases, those releases have been

      10      consistent with whatever permits we have in effect,

      11      and that they haven't adversely affected the public

      12      health and safety.

      13             I can't say that there have been no releases,

      14      I'm not the expert on that, but I do believe that we

      15      have said repeatedly that we have not had an adverse

      16      effect on the river.

      17             SENATOR CARLUCCI:  But you would acknowledge

      18      that there has been releases of toxins, like

      19      strontium-90 and caesium-137 and tritium?

      20             T. MICHAEL TWOMEY:  I don't know about the

      21      specifics of the releases, but those are all

      22      regulated by the Nuclear Regulatory Commission.

      23             And I believe that we are in compliance with

      24      whatever groundwater standards we're required to be

      25      in compliance with.







                                                                  82
       1             SENATOR CARLUCCI:  The Nuclear Regulatory

       2      Commission allows for these toxins to be in our

       3      groundwater?

       4             T. MICHAEL TWOMEY:  The nuc- -- well, first

       5      of all, I mean, there's radiation -- there's

       6      background radiation all over the country.

       7             Above-ground atom-bomb testing in the '50s

       8      ensured that we would all have some level of

       9      background radiation regardless of where we live,

      10      and, the NRC has an obligation to ensure the public

      11      health and safety.

      12             I'm not the expert on which, what the levels

      13      are, but it is not a zero-release regimen.

      14             It is a "protect the public health and

      15      safety" regimen.

      16             And we certainly believe we do that.

      17             SENATOR CARLUCCI:  Okay.

      18             Now, talking about the spent fuel rods, what

      19      is the plan for those fuel rods?

      20             Where are they kept right now?

      21             T. MICHAEL TWOMEY:  Well, they're kept on the

      22      site, which is where they'll remain until the

      23      federal government honors its obligation to come and

      24      pick up spent fuel, which is an obligation that's

      25      been in place for many years.







                                                                  83
       1             SENATOR CARLUCCI:  So what happens if that

       2      obligation doesn't come to fruition?

       3             T. MICHAEL TWOMEY:  Well, we have two methods

       4      of storing the fuel.

       5             We have spent-fuel pools, which is where the

       6      spent fuel rods go initially.

       7             And then we've constructed dry-cask storage

       8      facilities, and we are moving spent fuel on some

       9      regular basis -- I don't have the schedule in front

      10      of me -- into dry-cask storage where it can remain

      11      in casks that are actually designed to be picked up

      12      by the Department of Energy.

      13             SENATOR CARLUCCI:  So the dry-cask storage,

      14      that's located right there on the grounds of

      15      Indian Point?

      16             T. MICHAEL TWOMEY:  Correct.

      17             SENATOR CARLUCCI:  Now, how big of a facility

      18      is that, and how much can it contain, in terms of --

      19             T. MICHAEL TWOMEY:  Well, eventually, we can

      20      store all of the spent fuel that is generated in

      21      Indian Point in dry-cask storage at the facility.

      22             We have it -- we have one pad in place

      23      already, at least one.

      24             We may have to construct another pad, but, we

      25      do have room on the site to store all the spent







                                                                  84
       1      fuel.

       2             SENATOR CARLUCCI:  When did that start, the

       3      dry-cask system?

       4             T. MICHAEL TWOMEY:  I'm not 100 percent sure.

       5             It was within -- certainly, since we bought

       6      the plant.

       7             My estimate, Senator, would be in the last

       8      five to six years.

       9             We can certainly get back to your office with

      10      more details on that question.

      11             SENATOR CARLUCCI:  How long would you have to

      12      store them in the dry cask?

      13             T. MICHAEL TWOMEY:  Well, we would store them

      14      in the dry casks until the federal government picks

      15      up the spent fuel.

      16             And that could mean a regional facility or a

      17      single national repository, depending on how that

      18      works out.

      19             SENATOR CARLUCCI:  What's the cost to

      20      maintain the spent fuel rods?

      21             T. MICHAEL TWOMEY:  I don't have that figure

      22      in front of me.

      23             I mean, we -- certainly, we pay the cost.

      24             SENATOR CARLUCCI:  Right.

      25             T. MICHAEL TWOMEY:  Consumers don't pay the







                                                                  85
       1      cost, because we don't -- that's one of the costs

       2      that I mentioned that we don't get to include in the

       3      price that we charge for power.

       4             So, from a New York-consumer standpoint, the

       5      cost is zero.

       6             SENATOR CARLUCCI:  But you don't have any

       7      idea what that actually costs the company?

       8             T. MICHAEL TWOMEY:  I don't know that.

       9             I did not come prepared to answer that

      10      question today, but that's -- again, we can provide

      11      that to your office as a follow-up.

      12             SENATOR CARLUCCI:  Great.

      13             So Entergy has plans to spend money on the

      14      containment of these fuel rods for, how long?

      15             T. MICHAEL TWOMEY:  For as long as we have

      16      to.

      17             SENATOR CARLUCCI:  So what happens if Entergy

      18      goes bankrupt, let's say, and those costs are borne

      19      by Entergy right now, who would pay that to contain

      20      those spent fuel rods?

      21             T. MICHAEL TWOMEY:  We do have

      22      decommissioning trust funds, and those funds allow

      23      for the spending -- for money to be spent on

      24      spent-fuel management.

      25             SENATOR CARLUCCI:  And that's money set aside







                                                                  86
       1      by nuclear-power companies?

       2             T. MICHAEL TWOMEY:  Correct.

       3             SENATOR CARLUCCI:  That can't be passed on to

       4      the consumer either?

       5             T. MICHAEL TWOMEY:  No.

       6             SENATOR CARLUCCI:  And do you have an idea of

       7      percentage of budget what that is for you guys?

       8             T. MICHAEL TWOMEY:  I do not have that

       9      number.

      10             SENATOR CARLUCCI:  Now, when we talk about

      11      where Indian Point is, you know, one of the big

      12      contentious points is that it's in a highly

      13      populated area.

      14             I live in the zone that would have to be

      15      evacuated.

      16             Where -- the evacuation plan, how does that

      17      work?

      18             Could you walk us through that?

      19             T. MICHAEL TWOMEY:  Well, we do have experts

      20      who spend every day worrying about that issue.

      21             I would note, primarily, that, first of all,

      22      Indian Point's location near New York City is not

      23      unique.

      24             There are nuclear facilities operating near

      25      Boston; Washington, D.C.; Chicago; Detroit; Miami;







                                                                  87
       1      Philadelphia; Pittsburgh; major cities all over the

       2      United States, and particularly on the eastern

       3      seaboard.

       4             In fact, the last figure I saw is, roughly,

       5      one-third of the United States citizens live within

       6      50 miles of a nuclear facility.

       7             They're a critically important part of our

       8      energy infrastructure, and, you know, a decision to

       9      reject nuclear power because of its proximity to

      10      nuclear -- excuse me, to populated areas would

      11      really be a rejection of nuclear power all over the

      12      country.

      13             And, it provides about 20 percent of the

      14      nation's power.

      15             SENATOR CARLUCCI:  Right, but --

      16             T. MICHAEL TWOMEY:  And from a clean

      17      energy --

      18             SENATOR CARLUCCI:  -- we're -- this is being

      19      specific to Indian Point and the -- you know, the

      20      geological fixtures that we have there, in terms of

      21      a large river, you know, constrained modes of

      22      transportation, so we've got to look at it case by

      23      case.

      24             And just the evacuation plans for

      25      Indian Point have never really been explained to me







                                                                  88
       1      thoroughly, in terms of understanding how we would

       2      actually evacuate that large amount of people across

       3      things like the Tappan Zee Bridge or the

       4      George Washington Bridge.

       5             So, is that something that you're confident

       6      in?

       7             And, how that would work?

       8             And, are you able to evacuate that area, that

       9      we are called is "in the zone," in that short period

      10      of time?

      11             T. MICHAEL TWOMEY:  Well, first of all,

      12      I think -- the answer is, yes, we're very confident

      13      in the effectiveness of the plan.

      14             The plan is really not just an Entergy plan.

      15             It requires coordination with federal

      16      agencies, FEMA, state agencies, local officials.

      17             Those plans are detailed.

      18             They are regularly reviewed.

      19             They are practiced.

      20             I -- there is a wealth of information about

      21      those plans, and I am not the best resource for you

      22      on that question.

      23             And what I'd like to do is, we can provide

      24      your office with a detailed description of the plan.

      25             Now, the evacuation area is proposed, in the







                                                                  89
       1      event that you needed to, is only about 10 miles

       2      outside the facility.

       3             And those plans are highly dependent on what

       4      exact type of an event you have, and what you would

       5      need to do.

       6             But, as I say, there are experts who, really,

       7      their full-time job is to worry about this every

       8      day.

       9             SENATOR CARLUCCI:  The thing that I'm trying

      10      to understand is, when we talk about that 10-mile

      11      radius.

      12             T. MICHAEL TWOMEY:  Right.

      13             SENATOR CARLUCCI:  So it's 10 square miles

      14      around the facility?

      15             T. MICHAEL TWOMEY:  I believe it's

      16      10 miles -- yeah, if you picked the center of the

      17      plant, it would be a 10-mile circle.

      18             SENATOR CARLUCCI:  So when you talk about

      19      evacuating that area, it's really not a complete

      20      evacuation, and that's what troubles me, in terms of

      21      what I've been told is, it depends on what the wind

      22      conditions are.

      23             T. MICHAEL TWOMEY:  Correct.

      24             SENATOR CARLUCCI:  Who signs off on that

      25      plan?







                                                                  90
       1             T. MICHAEL TWOMEY:  Well, FEMA, the NRC,

       2      state and local officials.

       3             SENATOR CARLUCCI:  And right now, you're

       4      confident that that's all moving forward?

       5             T. MICHAEL TWOMEY:  Very.

       6             SENATOR MAZIARZ:  Thank you very much,

       7      Mr. Twomey.

       8             I think that's it.

       9             T. MICHAEL TWOMEY:  I appreciate the

      10      opportunity to appear.

      11             Thank you.

      12             SENATOR MAZIARZ:  All right, thank you very

      13      much.

      14             We've been going now for almost two hours.

      15             We're going to take an absolute five-minute

      16      break.

      17             Okay?

      18             Thank you.

      19                  (A recess was taken.)

      20                  (The hearing resumed, as follows:)

      21             SENATOR MAZIARZ:  Our next witness is

      22      Tom Rumsey.

      23             Tom is the vice president of external affairs

      24      for the New York Independent System Operator.

      25             Tom, thank you very much for being here







                                                                  91
       1      today.

       2             THOMAS RUMSEY:  Thank you, Chairman.

       3             And good afternoon to Chairman Maziarz,

       4      Senator Ritchie, and Senator Carlucci.

       5             I appreciate the opportunity to speak today.

       6             We have submitted a pretty detailed response

       7      to the hearing notice, but I'd like to summarize

       8      that in about a page and a half, if you will,

       9      double-spaced, and then get to your questions.

      10             The New York Independent System Operator is a

      11      not-for-profit organization, independent of the

      12      state government, and, we take no position as to the

      13      closure or continued operation of Indian Point; only

      14      to the impacts of both.

      15             We serve three key functions for the state of

      16      New York:

      17             We're responsible for the reliable operation

      18      of New York's bulk electric system in accordance

      19      with all national, regional, and state reliability

      20      requirements;

      21             We administer New York's competitive

      22      wholesale electricity markets;

      23             And, finally, we conduct short- and

      24      long-range planning for the bulk electric system for

      25      the state of New York.







                                                                  92
       1             The three key points that I'd like to make

       2      regarding the hearing today is:

       3             One, to meet reliability requirements,

       4      approximately 1100 megawatts of replacement power or

       5      resources would have to be in place prior the

       6      closure of the Indian Point center to maintain

       7      reliability standards;

       8             Two, due to New York's existing transmission

       9      limitations, likely solutions to the closure would

      10      be new generation, additional demand response or

      11      distributed generation, and limited transmission

      12      upgrades;

      13             And, three, these proceedings have

      14      highlighted the aging New York's infrastructure --

      15             Sorry, now I'm much louder.

      16             It's like bad karaoke.

      17             -- New York's aging infrastructure.

      18             The opportunity that we have in front of us

      19      to upgrade the historic bottlenecks throughout the

      20      grid would benefit both upstate, it would help

      21      expand renewables throughout the state, and, with or

      22      without Indian Point, we shouldn't lose that

      23      opportunity.

      24             Please refer to the more detailed responses

      25      that we submitted for further details, and I'd like







                                                                  93
       1      to entertain any questions you have.

       2             SENATOR MAZIARZ:  Thank you very much, Tom.

       3             That was very short.

       4             THOMAS RUMSEY:  Yes, sir.

       5                  [Laughter.]

       6             THOMAS RUMSEY:  It's the fourth time we've

       7      been here, sir, and, same message.

       8             SENATOR MAZIARZ:  Tom, can the system take a

       9      closure by a 2,000-plus megawatt generator without

      10      having an impact on rates and reliability, just,

      11      overall?

      12             THOMAS RUMSEY:  Overall, right now, where

      13      Indian Point is located, by our analysis, you'd have

      14      1100 megawatts of a gap with resources.

      15             Those resources would have to be in place

      16      prior to the discontinued operation, or we'd have --

      17      we would not able to meet reliability standards.

      18             Now, those resources can be transmission,

      19      distributed generation, new generation, any

      20      combination, but they'd have to be available before

      21      you can close.

      22             SENATOR MAZIARZ:  Is the New York ISO taking

      23      part in the contingency planning process with the

      24      PFC?

      25             THOMAS RUMSEY:  We are the technical resource







                                                                  94
       1      for the State, so as they ask certain projects to be

       2      modeled, we will model them for them, but we are not

       3      a co-signer of the plan.

       4             SENATOR MAZIARZ:  But have they asked?

       5             THOMAS RUMSEY:  They have.

       6             SENATOR MAZIARZ:  Thank you.

       7             Senator Ritchie.

       8             SENATOR RITCHIE:  Just one question.

       9             Talking about -- Entergy was talking about

      10      the fact that they're in the relicensing process,

      11      and it would be extended until the decision is made.

      12             So I guess I'm trying to understand how all

      13      this would take place, that Entergy won't know until

      14      the end of that process; meantime, they have a

      15      2016 deadline.

      16             So I'm trying to understand how we could put

      17      something in place of what the loss is going to be

      18      with that kind of timetable, given the fact that we

      19      don't really know when the decision will be made.

      20             So, I don't really understand how this can

      21      all take place at the same time.

      22             THOMAS RUMSEY:  So as previous members -- or,

      23      testifiers have said, we've seen, roughly,

      24      5,000 megawatts of generation retire.

      25             When a generator puts in their notice to







                                                                  95
       1      retirement, the local -- or, the transmission owner

       2      and the New York System Independent Operator analyze

       3      the loss of that resource to see if there's any

       4      reliability violation, or if we need them to

       5      continue.

       6             We've had two cases where -- Dunkirk and

       7      Cayuga, where there have been local reliability

       8      needs; and, therefore, a contract is struck between

       9      the transmission owner and that asset owner to

      10      continue operations until a -- what's called a

      11      "gap solution," until a permanent solution can be

      12      reached.

      13             In this case, going down that path, you've

      14      seen one reactor now, as Mr. Twomey said, a couple

      15      days ago their license has, quote/unquote,

      16      "expired", but extended, because they've -- you

      17      know, the federal law allows them to continue if

      18      they've requested their relicensing on time.

      19             One avenue would be, that once the asset

      20      owner or the NCR tells us -- or, notifies that the

      21      plant is not going to continue, we then take them

      22      out of the base case, which is our planning

      23      document.

      24             Right now, we count them in because there is

      25      no indication that they will not continue.







                                                                  96
       1             We do do a sensitivity analysis, where we

       2      model the grid without Indian Point, but the base

       3      case that can drive market solutions has them in

       4      because, again, no final decision has been reached.

       5             One scenario, is that they would retire, but

       6      enter into a commercial agreement until the

       7      replacement resources were in; so they would

       8      continue until this "1100" gap was filled.

       9             Under the process the PSC is going under,

      10      they're being more proactive to get those resources

      11      identified and on the grid before a decision is

      12      reached.

      13             SENATOR RITCHIE:  And so what happens if that

      14      takes place and, Indian Point, its relicensing goes

      15      through?

      16             What happens at that point?

      17             THOMAS RUMSEY:  There's two options --

      18      there's really only two scenarios.

      19             One is, that power is economic, and it will

      20      come into the grid and operate.

      21             Those -- again -- or, there could be

      22      transmission upgrades that we believe are long

      23      overdue, and those would be beneficial in either

      24      scenario.

      25             Second, if they were to come in and they were







                                                                  97
       1      uneconomic, we would mitigate them so that they

       2      didn't have an impact on the markets.

       3             SENATOR MAZIARZ:  Senator Carlucci.

       4             SENATOR CARLUCCI:  No questions.

       5             SENATOR MAZIARZ:  Oh.

       6             Tom, thank you very much.

       7             THOMAS RUMSEY:  You're more than welcome.

       8             Have a great day.

       9             SENATOR MAZIARZ:  Our next witness is

      10      Gavin Donohue, president & CEO of Independent Power

      11      Producers of New York.

      12             Mr. Donahue, thank you.

      13             GAVIN J. DONOHUE:  Thank you, Senators.

      14             I had "good morning," but I'll say, good

      15      afternoon.

      16             SENATOR MAZIARZ:  Yeah.

      17             GAVIN J. DONOHUE:  Thank you, Senators, and

      18      Senator Maziarz, for inviting me here today.

      19             IPPNY represents over 80 generators, power

      20      marketers, and other participants in New York's

      21      competitive energy market, including Entergy, the

      22      owner of Indian Point.

      23             I've provided a comprehensive written

      24      testimony to the Committee, so I'll do my best to

      25      try not to be redundant and summarize it within the







                                                                  98
       1      10 minutes.

       2             SENATOR MAZIARZ:  Thank you.

       3             GAVIN J. DONOHUE:  Over the last 13 years,

       4      IPPNY members have provided over 75 percent of the

       5      state's electricity.

       6             Independent power producers have invested in

       7      excess of $10 billion to purchase, construct, and

       8      operate their facilities, and the generator

       9      community pay in annual taxes of over $600 million

      10      in New York State.

      11             IPPNY members utilize cutting-edge

      12      technologies, fuel types such as co-generation,

      13      nuclear, hydro, coal, wind, oil, landfill gas,

      14      natural gas, energy-from-waste, and biomass.

      15             Indian Point is a prime example, providing

      16      over 20 percent of New York City and

      17      Westchester County's electricity, investing over a

      18      billion dollars in upgrades, and paying over

      19      $75 million in taxes, and employing over a

      20      thousand folks at their facility.

      21             Over the last 13 years, the competitive

      22      electricity market has led to savings for energy

      23      consumers.

      24             Wholesale energy prices have declined since

      25      restructuring.







                                                                  99
       1             With an all-time low in 2012, an average

       2      price of $45.23 per megawatt hour, compared to the

       3      previous low of $48.63 in 2009.

       4             Reduced air emissions across the state, CO2

       5      has been reduced by 37 percent, SO2 by more than

       6      94 percent, and NOx by 80 percent.

       7             And we also have a much more efficient and

       8      reliable system, which I'll touch on later.

       9             New York State has also added

      10      10,000 megawatts of generating capacity, and over

      11      6,000 megawatts of renewable energy across the

      12      state.

      13             Competition in New York has also transferred

      14      the financial risks from the consumers and

      15      ratepayers to private investors.

      16             It's encouraged innovation and investment in

      17      a wide variety of technology sources to maintain

      18      this robust system.

      19             As a trade association representing wholesale

      20      energy generators and suppliers, one of IPPNY's

      21      primary goals is to ensure the continued development

      22      and enhancement of those competitive electricity

      23      markets.

      24             Today we're here to talk about the proposed

      25      reliability contingency plan, which I'll refer to as







                                                                  100
       1      the "RCP," we believe interferes and harms the

       2      competitive nature and the successes of the markets

       3      here in New York.

       4             The proposed RCP is an unnecessary attack on

       5      the marketplace, and harkens back to the days of

       6      command-and-control of over 15 years ago.

       7             The RCP is furthering the shutting down of an

       8      operationally viable, safe, and existing generator,

       9      while attempting to give preferential treatment to

      10      certain transmission projects at the expense of the

      11      public through a guaranteed cost-recovery mechanism.

      12             Throughout the Energy Highway process, IPPNY

      13      has repeatedly argued that any market intervention,

      14      such as the reliability contingency plan proceeding,

      15      is contrary to the nature of electric-industry

      16      restructuring, detrimental to markets, and chills

      17      New York's investment goals.

      18             One of the goals of New York State is to be

      19      open for business, and in the energy industry,

      20      regulatory certainty and consistency are key

      21      components to ensuring that private investment is

      22      maintained here in New York.

      23             The RCP is defective and contains many

      24      implementation flaws.

      25             Major acts -- aspects of the implementation







                                                                  101
       1      rely on future actions by the State Legislature and

       2      the FERC, over which the PSC and other state

       3      agencies, such as New York Power Authority, do not

       4      have jurisdiction.

       5             The RCP does not provide any guidance or

       6      alternative solutions if the Legislature does not

       7      pass the required legislation.

       8             While mentioning FERC, I would be remiss if

       9      I didn't mention that FERC has been unambiguous as

      10      it relates to mitigating new uneconomic generation.

      11             And the important point here is, that

      12      ratepayers and consumers could pay twice under this

      13      scenario, based on current policy, on how you

      14      mitigate uneconomic power.

      15             It's very important, as legislators, for you

      16      to realize that if uneconomic power is brought into

      17      the marketplace, it is very detrimental to the

      18      ratepayers here in this state.

      19             Touching on the planning process, I think

      20      it's safe to say that the New York ISO has experts

      21      in the planning area, that do a great job, that deal

      22      with the market participants in real time, they

      23      realize the problems that the market has, they see

      24      what the trends are in the marketplace, and that's

      25      how they do their planning process.







                                                                  102
       1             And the planning process that really is going

       2      on at the PSC, under the RCP, is really a one-time

       3      thing and isn't consistent with how the markets have

       4      been run for the last 15 years.

       5             Beyond the competitive energy markets and

       6      questionable changes to system reliability, the

       7      number one question that's been in the room today is

       8      "Who will pay for the contingency plan?"

       9             The PSC has advocated for a

      10      "beneficiaries pay" model, but that determination as

      11      to who the beneficiaries are, and what the ultimate

      12      cost of this proposal, is unclear.

      13             The proposed RCP exposes consumers to these

      14      unnecessary costs, and sends non-market investment

      15      signals to power-project developers.

      16             What ratepayers need to know, that if the

      17      project is built through a contract with NYPA, who

      18      it is -- who it is expected will be reimbursed by

      19      other utilities, and that project is halted for any

      20      reason, the developer of the project will not be

      21      responsible for its costs.

      22             Further -- and, Senator Maziarz, you touched

      23      on this this morning -- in its April presentation to

      24      parties interested in the RFP, NYPA explicitly

      25      stated that, quote, "Seller project developer does







                                                                  103
       1      not bear mitigation risks."

       2             So who does bear that risk?

       3             Do Senator Ritchie's constituents, does

       4      Senator Maziarz's constituents, bear that risk?

       5             And I think one of the issues that really has

       6      come out of this hearing is the fact that that is

       7      undetermined, and it adds value to why we're having

       8      this hearing today.

       9             When projects are built on market signals,

      10      those are primarily built on the backs of investment

      11      companies and their board of directors, and not on

      12      the ratepayers.

      13             I think, in conclusion, what I'd like to say

      14      about reliability, I mentioned at the beginning of

      15      my statement, is that the July heat wave, I think,

      16      showed a new record for demand here in New York.

      17             There was excellent performance by the

      18      generators and the utilities.

      19             The high level of asset availability has

      20      never been seen like that before.

      21             All units that could be available were

      22      available.

      23             We had no brownouts -- no significant

      24      brownouts or blackouts.

      25             And I think, you know, reliability should be







                                                                  104
       1      weighed here, and I think that that is one of the

       2      true tenants of the benefits of competition.

       3             New York has some of the best competitive

       4      energy markets in the state.

       5             We shouldn't walk away from those for

       6      unneeded or a perceived problem in the energy

       7      markets for reliability.

       8             Planning is okay, but let's do planning under

       9      a structure that actually makes some sense.

      10             So with that, Senator, I'll conclude my

      11      remarks.

      12             SENATOR MAZIARZ:  Thank you very much,

      13      Mr. Donohue.

      14             We appreciate you abbreviating your remarks.

      15             Do you think -- I mean, you had high praise

      16      for the ISO, and I do too, and their relationship

      17      with this Committee has always been very

      18      professional and very positive.

      19             But do you think that, going through this

      20      process with the PSC, and the Power Authority, and

      21      all of the other providers, both the private-sector

      22      utilities, that they're not taking reliability into

      23      consideration?

      24             GAVIN J. DONOHUE:  I think the ISO certainly

      25      is.







                                                                  105
       1             I think the PSC is trying to plan, but I also

       2      think that there's a planning process in place that

       3      says, We don't need resources till '21, '22.

       4             As we heard earlier, this is very unique to

       5      this power plant and this situation.

       6             What I think is something this Committee

       7      needs to realize, is that there's limited capital

       8      dollars.

       9             And when New York doesn't show that it's open

      10      really for business, those dollars are going to

      11      Pennsylvania or somewhere else.

      12             So, the continued regulatory uncertainty as

      13      to how we're going to maintain our energy policy,

      14      going forward, this type of proceeding, and the fact

      15      that we don't have answers to questions like

      16      "Who's gonna to pay?" sends those investments

      17      somewhere else.

      18             And I think that it's very important for the

      19      Committee to understand that.

      20             SENATOR MAZIARZ:  Thank you.

      21             Senator Carlucci?

      22             Senator Ritchie.

      23             SENATOR RITCHIE:  Just one question:

      24             Are your members concerned about the

      25      precedence that this contingency plan, the way that







                                                                  106
       1      it's been put in motion, the precedence that it's

       2      going to set, as far as, you know, this is

       3      Indian Point; next time around it could be somebody

       4      else?

       5             GAVIN J. DONOHUE:  There's a lot of problems,

       6      you know, with this process, because of the lack of

       7      clarity.

       8             And I would say, Senator, that we are

       9      concerned.

      10             SENATOR MAZIARZ:  Thank you, Mr. Donohue.

      11             Thank you very much.

      12             Our next witness is Paul Haering,

      13      vice president of engineering and environmental

      14      sciences [sic] for Central Hudson Gas & Electric.

      15             PAUL HAERING:  Good afternoon,

      16      Senator Maziarz, Senator Ritchie, Senator Carlucci.

      17             My name is Paul Haering.

      18             I'm vice president of engineering and system

      19      operations for Central Hudson Gas & Electric.

      20             In addition, I chair the technical working

      21      group of the New York State Assessment and

      22      Reliability Study, or what's called "STARS."

      23             This is a study of the transmission system,

      24      which began in 2008.

      25             It was conducted and funded by the state's







                                                                  107
       1      transmission owners, utilizing some expertise from

       2      the New York ISO, and a consultant, ABB.

       3             The same group of companies is acting

       4      together to form what is called the

       5      "New York Transco," utilizing the results of the

       6      STARS study, and has provided a comprehensive

       7      portfolio of projects as part of the Governor's

       8      Energy Highway Request For Information process.

       9             So, first and foremost, the primary concern

      10      related to the retirement of Indian Point, as we

      11      have heard this morning, is the reliability impacts

      12      on the state transmission system.

      13             And there have been several studies that have

      14      been identified: the New York ISO studies, as well

      15      as the STARS studies.

      16             Both of those studies have identified there

      17      are transmission security deficiencies of over

      18      1100 megawatts with the retirement of that facility.

      19             In addition, there are what's called

      20      "resource-adequacy issues" and "voltage issues" on

      21      the system.

      22             In addition, recently, there was an

      23      announcement of another generator in the downstate

      24      area called "Danskammer" that is going to retire.

      25             It had a major damage that was caused as a







                                                                  108
       1      result of "Superstorm Sandy."

       2             Those impacts further exacerbate the

       3      identified deficiencies.

       4             So I think what's important, as we've heard,

       5      is that, in order to retire the plant, there needs

       6      to be some mitigation or some process in place to

       7      address the deficiencies.

       8             But I think what's also important is to

       9      understand the economic impacts on consumers of the

      10      loss of this resource, and that is a significant

      11      concern to Central Hudson and its customers.

      12             And we see the impacts as really threefold:

      13             One is, that there's going to be higher

      14      market prices, and I'll talk a little bit about

      15      that;

      16             There's also the costs associated with these

      17      contingency plans;

      18             And then, in addition, beginning in the

      19      summer of 2014, the NYISO will be implementing

      20      what's called a "new capacity zone" in the

      21      Lower Hudson Valley, and that will have another

      22      dramatic impact on capacity prices for the same

      23      consumers that are potentially going to be harmed by

      24      the closure of the facility.

      25             So when it comes to wholesale market prices,







                                                                  109
       1      the retirements of the Indian Point has been

       2      quantified in a study that was performed for the

       3      New York State Department of Environmental

       4      Protection, by Charles River Associates.

       5             That report had identified that the

       6      wholesale-price increases of the retirement could be

       7      upwards of 1.5 billion annually.

       8             In addition, obviously, there's economic

       9      impacts with regard to jobs, and the economic

      10      benefits of the plant as well.

      11             In addition, this contingency-plan case that

      12      is -- the PSC has ongoing, first of all, has to

      13      identify what the contingency plans are; and then,

      14      second, is trying to address how these costs should

      15      be allocated.

      16             We also -- as these utilities have several of

      17      these transmission projects that are included in the

      18      proceeding --

      19             [Technical difficulties.]

      20             -- subject to halting, as we've heard

      21      previously.

      22             But in addition, NYPA has this RFP process,

      23      and we -- also, there are energy-efficiency and

      24      demand-response programs that are going to be

      25      administered by NYSERDA and Con Edison.







                                                                  110
       1             Although we take no position --

       2      Central Hudson takes no position with regard to the

       3      decision to retire the plant, we do agree that there

       4      needs to be -- we need to be prudent and be prepared

       5      for the eventual -- if there is a decision to retire

       6      the facility.

       7             We also feel it's prudent to move forward

       8      with the solutions at a pace that makes them --

       9      makes sure they're in place prior to the retirement

      10      date, but we also feel that there are certain

      11      solutions, that I could characterize as what I'll

      12      call "no-regret" solutions.

      13             They go beyond the benefits of just

      14      addressing the reliability impacts of Indian Point.

      15             And some of those are -- what are

      16      characterized as these "transmission projects."

      17             Several of these transmission projects that

      18      are included in this contingency-plan proceeding are

      19      also in a separate proceeding in front of the PSC

      20      called the "AC Transmission proceeding case."

      21             These projects, emanating from Edic,

      22      Upstate New York, all the way down to the

      23      southeastern portion of New York, will facilitate

      24      and ensure that existing generators upstate have

      25      ability to serve downstate markets.







                                                                  111
       1             So, the constraints that exist on the

       2      transmission system today will be eliminated as a

       3      result of these projects.

       4             It also goes a long way in addressing the

       5      reliability impacts of the Indian Point, if

       6      Indian Point were to be shut down.

       7             As currently proposed in these proceedings,

       8      PSC has two different cost-allocation models, so the

       9      same project that's in the AC case has a different

      10      cost allocation than what's in the Indian Point

      11      case.

      12             So we see there's a huge disconnect and issue

      13      that the PSC has in front of it, in terms of how

      14      it's gone about the process with regard to these

      15      proceedings.

      16             It is our position that there are these

      17      broader benefits with regard to these

      18      AC Transmission projects that, arguably, we consider

      19      no-regrets, and should be expedited, and allow the

      20      state transmission owners, and, eventually, the

      21      New York Transco, to begin to build those projects

      22      and have them in service as quickly as possible.

      23             Regarding the RFP process, Central Hudson

      24      feels that the competitive energy markets

      25      administered by the NYISO are the best way to ensure







                                                                  112
       1      reliable and low-cost, competitively-priced supply

       2      for the state's consumers.

       3             As currently proposed, NYPA would enter into

       4      bilateral contracts with these project developers;

       5      ultimately, then, through reimbursement agreements,

       6      pushing costs back onto consumers.

       7             As currently proposed, the costs that would

       8      flow back to our consumers is about 7 percent of

       9      these total project costs.

      10             And Central Hudson's a fairly small utility.

      11             We're about 3 percent of the load in the

      12      state.

      13             So, 3 percent of the load, and 7 percent of

      14      the cost of these contracts.

      15             Also, the full impact of these costs would

      16      be -- need to be coupled with the proposed new

      17      capacity zone which goes into the -- in effect in

      18      the summer of 2014.

      19             Right now, the current estimates are, these

      20      new capacity-cost prices will raise consumer costs

      21      in the Hudson Valley, anywhere from 200 to 350

      22      annually.

      23             In terms of Central Hudson's customers, about

      24      10 percent for residential customers, about

      25      15 percent increase in bills for commercial







                                                                  113
       1      customers.

       2             We feel that there's other options that could

       3      be pursued with existing generators in the

       4      Hudson Valley that could significantly mitigate the

       5      price impacts.

       6             So, Senator Maziarz, Senator Ritchie, and

       7      Senator Carlucci, I really appreciate the

       8      opportunity to speak to you this morning -- or, this

       9      afternoon.

      10             We feel this is a critical issue in front of

      11      the State, and appreciate the Committee evaluating

      12      this.

      13             And I'm happy to answer any questions.

      14             SENATOR MAZIARZ:  Thank you very much,

      15      Mr. Haering.

      16             We also appreciate your attendance here

      17      today.

      18             Let me just state, because you went through

      19      it rather quickly there:

      20             Did I understand you to testify that the

      21      closure of Indian Point could have an economic

      22      impact on energy rates, by the way of increased

      23      costs, to the tune of 1.5 billion annually?

      24             PAUL HAERING:  That was the number that

      25      I read, that was included in the CRA report that was







                                                                  114
       1      done for the New York State Department of

       2      Environmental Protection.

       3             SENATOR MAZIARZ:  And does it indicate how

       4      that would be allocated across the state?

       5             Would that be just customers -- energy

       6      customers within, let's say, Westchester,

       7      New York City, the --

       8             PAUL HAERING:  Senator, I believe the way

       9      this --

      10             SENATOR MAZIARZ:  -- the eastern portion of

      11      the state?

      12             PAUL HAERING:  -- it would be statewide, but,

      13      probably, the majority of those costs would be seen

      14      in increases in the downstate area.

      15             SENATOR MAZIARZ:  You understand that that is

      16      almost a -- diametrically opposed to what was

      17      testified to here earlier today by some previous

      18      witnesses?

      19             PAUL HAERING:  I -- that may have been the

      20      case.

      21             SENATOR MAZIARZ:  Thank you.

      22             PAUL HAERING:  Okay.

      23             SENATOR MAZIARZ:  Senator Ritchie?

      24             SENATOR RITCHIE:  No questions.

      25             SENATOR MAZIARZ:  Senator Carlucci?







                                                                  115
       1             SENATOR CARLUCCI:  No questions.

       2             SENATOR MAZIARZ:  You know, my colleagues

       3      don't have any other questions.

       4             I just think that's -- you know, that is the

       5      crux of the issue right here, is who's going to pay

       6      for it?

       7             PAUL HAERING:  I agree.

       8             And I think the other point is, that there

       9      are solutions out there that provide broader

      10      benefits.

      11             And we feel that some of those solutions

      12      would address some of the concerns that both you and

      13      Senator Ritchie have, relative to what the benefits

      14      are upstate, and allowing the plants upstate that

      15      could provide benefits downstate, by relieving the

      16      bottlenecks of the transmission system.

      17             SENATOR MAZIARZ:  I certainly agree with

      18      that, and that's why, I can't speak for the other

      19      member of this Committee, but this Committee, myself

      20      as the Chair of it, have been extremely supportive

      21      of the Governor's Energy Highway Proposal.

      22             Thank you very much, Mr. Haering.

      23             We appreciate it.

      24             PAUL HAERING:  Thank you.

      25







                                                                  116
       1             SENATOR MAZIARZ:  Next we're going to have

       2      three individuals: James Slevin, Dominic Marzullo,

       3      and James Spry.

       4             They represent the Utility Workers Union.

       5             Thank you very much, gentlemen, for being

       6      here today.

       7             JAMES SLEVIN:  Senator Maziarz,

       8      Senator Ritchie, and Senator Carlucci, thank you

       9      again today for having us here.

      10             I'm not going be long into it, repetitive,

      11      and to a lot of statements that were there before.

      12             And, I gave a written testimony, submitted in

      13      prior, earlier part of this week.

      14             With me today I have two vital people in my

      15      organization:

      16             Dominic Marzullo is a business agent that

      17      represents my 400 members that work in Indian Point;

      18             And, Jimmy Spry is an executive board member,

      19      but also an employee at Indian Point.

      20             So, I think they come with a vital message,

      21      that you're going to hear from them also.

      22             No doubt, this Committee has -- it's great to

      23      see what the actions they're looking at, at the

      24      contingency plans that are -- that the talk of the

      25      economic impact on the ratepayer, but it's also an







                                                                  117
       1      economic impact on the labor side of it.

       2             In the jobs that we have at Indian Point, I'm

       3      not just a member looking at these membership that's

       4      up there, but it's also my other members that work

       5      around the system.

       6             I represent a lot of generating facilities.

       7             I know that they're tired.

       8             They're working, they're putting the

       9      capacities out they can.

      10             I also represent a lot of utility workers

      11      that are out on the street, trying to work very hard

      12      doing what they do, day in and day out.

      13             But this impact of -- if they look to close

      14      Indian Point, is also an impact that's going to have

      15      on the labor market.

      16             And what's going to happen is, is there will

      17      be a job loss.

      18             If we don't have the power to produce out

      19      there to those people that are in Westchester County

      20      and the city of New York, those will be impacted

      21      greatly.

      22             "Greatly."

      23             Nobody will come here to build if we don't

      24      have that facility and we don't have the generation

      25      that goes out there every day in the market.







                                                                  118
       1             You know, some people say that, you know,

       2      with decommissioning, that there would be jobs

       3      there.

       4             Well, I can tell you from a sister local out

       5      in California, San Onofre, there was 1600 jobs, down

       6      to 400 jobs.

       7             They were only temporary jobs until they

       8      finally closed that plant down.

       9             But there is a tremendous impact,

      10      economically, to my membership, and the labor market

      11      out there.

      12             So like I said earlier, I'm not gonna keep it

      13      long here.

      14             SENATOR MAZIARZ:  Thank you.

      15             JAMES SLEVIN:  I have great members out

      16      there.

      17             I want you to listen to the testimony of

      18      Dominic Marzullo.

      19             SENATOR MAZIARZ:  Mr. Marzullo.

      20             DOMINIC MARZULLO:  Good afternoon,

      21      Senator Maziarz, Senator Ritchie, and

      22      Senator Carlucci.

      23             Thank you for having me here.

      24             My name is Dominic Marzullo.

      25             I'm a business agent for the Utility Workers







                                                                  119
       1      Union of America, Local 1-2, which represents 400

       2      men and women who work at Indian Point.

       3             Indian Point has been the most extensively

       4      inspected nuclear plant in history.

       5             It has received the NRC's highest safety

       6      rating of "green" for 8 years in a row.

       7             In addition, the NRC's inspection of

       8      Indian Point has undergone an in-depth,

       9      comprehensive evaluation by independent panel made

      10      up of experts in the nuclear safety, emergency

      11      preparedness, and public policy.

      12             The panel's conclusion was, that Indian Point

      13      meets all NRC requirements, and that the planned

      14      safety systems are both well-maintained and

      15      reliable.

      16             When I was a designer at Indian Point,

      17      I designed the installation of radiation monitors

      18      throughout the Unit 2 facility.

      19             Safety is paramount to me, and I am proud of

      20      the work I did.

      21             I accept nothing less than excellence at

      22      Indian Point.

      23             Since acquiring Indian Point a decade ago,

      24      Entergy has invested hundred of millions of dollars

      25      in safety technology and security upgrades for the







                                                                  120
       1      plant.

       2             If there were any concerns for our members'

       3      safety at Indian Point, at any time, in any way,

       4      you [sic] can assure you that Local 1-2 would be in

       5      the forefront of demanding the safe operation of the

       6      facility.

       7             In addition, to all of our members in the

       8      Indian Point, of course, work close to the plant;

       9      therefore, they will be the first to be affected by

      10      any safety problems.

      11             In addition, most of the men live quite

      12      close.

      13             They certainly would immediately raise any

      14      concerns that they had about the plant's safety, as

      15      any problems would greatly impact themselves and

      16      their families.

      17             What I am happy to note, that there's, no

      18      time, has ever been any problems.

      19             We wouldn't let it happen.

      20             The safety of our members and the public is

      21      our first order of business.

      22             Indian Point is a vital resource.

      23             It would be devastating that it should not be

      24      relicensed.

      25             Thank you very much.







                                                                  121
       1             SENATOR MAZIARZ:  Mr. Spry.

       2             JAMES SPRY:  Senator Maziarz and members of

       3      the Committee, thank you.

       4             My name is James Spry.

       5             I'm a member of the executive board of Local

       6      1-2, and I work at Indian Point.

       7             Just a little bit about my background:

       8             I was in the nuclear navy for nine years.

       9             I served aboard the USS Carl Vincent and the

      10      USS Nimitz.

      11             I was a reactor operator on those ships.

      12             I also worked at a facility close to Miami,

      13      Turkey Point, for 3 1/2 years as an instrumentation

      14      specialist.

      15             And I've worked at Indian Point for 23 years

      16      as an operator, and I'm now a planner there.

      17             I am an advocate for nuclear power, at

      18      Indian Point, and this country, so you know that.

      19             I would like to add some common sense to the

      20      debate surrounding Indian Point, in the hope that it

      21      will help its continued operation and lead to its

      22      relicensing.

      23             The fact is, if I and my fellow workers at

      24      Indian Point were not confident about the operation

      25      and safety of the facility, we would not work there.







                                                                  122
       1             We, obviously, would be the first ones

       2      impacted if there were any safety problems.

       3             I live nearby the Indian Point, within

       4      3 miles of the plant.

       5             I've lived there since 1993.

       6             And I also lived there from '87 to '89 in

       7      another stint there.

       8             My kids go to school there.

       9             I have other relatives that live right there

      10      in that town and they've all gone to school.

      11             Both of my boys were born in the area.

      12             If there was the slightest concern in our

      13      minds as to the plant's safety, do you think any of

      14      us would live there or have our families live

      15      anywhere near the plant?

      16             We work very hard every day to make sure that

      17      Indian Point is run safely, as that is in the best

      18      interests of ourselves, our families, and all

      19      New Yorkers.

      20             We want the people of this state and our

      21      state government to realize that we would not do

      22      anything which would endanger the people of

      23      New York, and would be the first to warn the public

      24      if there were any danger from the Indian Point

      25      plant.







                                                                  123
       1             That's the common sense we are looking for as

       2      we, the real experts, witness ideological and almost

       3      hysterical opposition to this safe, clean source of

       4      power.

       5             With no real energy plan in sight, please

       6      consider that Indian Point directly supports

       7      11,000 jobs in the Hudson Valley, in addition to the

       8      1200 employees there.

       9             Just think of the devastation that would be

      10      caused should nearly 14,000 New York families find

      11      themselves out of work.

      12             That's the grim picture that awaits us all if

      13      Indian Point closes.

      14             And please keep in mind that we would be the

      15      first to blow the whistle if there were any real

      16      danger from the operation of Indian Point.

      17             JAMES SLEVIN:  So as you heard from the

      18      testimony here, my members' safety is a vital, vital

      19      issue to them, day in and day out; to them and their

      20      families.

      21             And it's an important message we bring from

      22      the Local back out to them.

      23             And, we will undertake any questions you may

      24      have.

      25







                                                                  124
       1             SENATOR MAZIARZ:  Thank you very much,

       2      Mr. Slevin, Mr. Marzullo, and Mr. Spry.

       3             I have to say that, I believe it was at

       4      Senator Carlucci's request, I don't think

       5      Senator Ritchie was in the Senate at the time, that

       6      we did visit Indian Point for a tour.

       7             I was very impressed with the workforce

       8      there, with the safety procedures that were in

       9      place.

      10             We also did have a meeting with individuals

      11      on both sides of this issue, much like this, right

      12      there in -- in, I believe it was Rockland County.

      13             I'm not sure which town it was --

      14             SENATOR CARLUCCI:  Stony Point.

      15             SENATOR MAZIARZ:  -- Stony Point, yes.

      16             We did do that.

      17             But I have to say, that we have reached out,

      18      we have visited there.

      19             And the members of the Committee, again,

      20      I think I can speak, that they were most impressed

      21      with the workforce there.

      22             And, you know, we are -- we are -- are -- by

      23      this hearing, by that hearing, by that meeting, by

      24      visiting there, you know, we are looking to gain the

      25      type of information from all sides on this







                                                                  125
       1      particular issue.

       2             So, I really don't have any questions.

       3             Senator Carlucci, if you'd like to?

       4             SENATOR CARLUCCI:  Yeah, just a question:

       5             The workforce, what's the average salary of a

       6      member at Indian Point?

       7             JAMES SLEVIN:  The average salary is about

       8      $900,000 a year -- uh, I mean, $90,000 a year.

       9                  [Laughter.]

      10             SENATOR MAZIARZ:  I was just about ready to

      11      move.

      12                  [Laughter.]

      13             SENATOR CARLUCCI:  I think we heard from

      14      James Spry about your level of experience.

      15             What is the typical level of experience of an

      16      employee in the union?

      17             Is it as extensive as Mr. Spry, or, do you

      18      have entry-level employees?

      19             JAMES SLEVIN:  Yeah, we represent -- our

      20      union represents, from water companies, to

      21      generating companies, to utility companies, out

      22      there, so it all varies into it.

      23             But, some come from background in the

      24      military, and some come from just right off the

      25      street.







                                                                  126
       1             We do pride ourselves on trying to take

       2      people from the state of New York, and try to make

       3      sure that we get jobs coming into New York.

       4             SENATOR CARLUCCI:  How many members do you

       5      have in New York State?

       6             JAMES SLEVIN:  Close to 9,000.

       7             SENATOR CARLUCCI:  And you have 400 at

       8      Indian Point?

       9             JAMES SLEVIN:  Yes.

      10             SENATOR CARLUCCI:  Okay.

      11             But at Indian Point, what's the level of

      12      expertise, in terms of --

      13             JAMES SPRY:  I would say we have a

      14      super-experienced crew.

      15             I mean, our average age has got to be

      16      mid-40s.

      17             Most people -- a lot of the operators came

      18      from the military, military background.

      19             And some came from, you know, different

      20      institutions, and they got trained there.

      21             But, most of the people have extensive

      22      experience in nuclear power.

      23             SENATOR CARLUCCI:  So it's not like this

      24      would be the first facility you would work at?

      25             In terms of representing utility workers,







                                                                  127
       1      there's not really that much entry-level positions

       2      in your union at Indian Point?

       3             Or --

       4             JAMES SLEVIN:  Occasionally, in a maintenance

       5      side or a warehouse side, you may have those entry

       6      levels.

       7             We don't do the hiring.

       8             Entergy does the hiring.

       9             But we make sure that they look for a skilled

      10      person, because, in our union, we really pride

      11      ourselves on competent, skilled people.

      12             SENATOR CARLUCCI:  So it sounds like you have

      13      to be highly skilled, have a certain level of

      14      experience.

      15             So if the facility were to close, I take it

      16      that the employees here wouldn't look for other work

      17      in the area.

      18             They would look for work in a nuclear power

      19      facility.

      20             Is that correct?

      21             JAMES SLEVIN:  That would probably be, yeah.

      22             I mean, it's not as easy going into a regular

      23      generating facility and just learning that.

      24             It's a different atmosphere.

      25             SENATOR CARLUCCI:  Thank you.







                                                                  128
       1             SENATOR MAZIARZ:  As I recall, there was a

       2      pretty extensive training facility, though, for

       3      incoming employees when they were hired, by --

       4      I remember --

       5             DOMINIC MARZULLO:  Yes, there is, but there's

       6      ongoing, yearly, people have to, you know, requalify

       7      and get their training.

       8             You know, on and on.

       9             Especially the operators, they go to classes

      10      every year.

      11             You know, these are people that actually turn

      12      the wrenches and, you know, have the plant

      13      operating.

      14             So, they're constantly being retrained.

      15             JAMES SLEVIN:  Yeah, I mean, they, uh -- like

      16      Dominic had said, we negotiate a lot of training for

      17      them.

      18             We make sure that they get, always part of

      19      their skills, and enhanced, and further technology,

      20      and things like that.

      21             So, it's always ongoing.

      22             It never has stopped.

      23             No companies really come to us, because, the

      24      energy market is changing, day in and day out, and

      25      they want to make sure they're competitive in it.







                                                                  129
       1             SENATOR CARLUCCI:  How many different unions

       2      are represented at Indian Point?

       3             JAMES SLEVIN:  Oh, from millwrights, to

       4      plumbers, to carpenters; there's a multiple.

       5             SENATOR CARLUCCI:  But you're the largest?

       6             JAMES SLEVIN:  We represent majority of the

       7      employees up there, yeah.

       8             SENATOR MAZIARZ:  Senator Ritchie?

       9             SENATOR RITCHIE:  I have a couple questions.

      10             As far as the longevity of your -- the

      11      members that are there, when one of your members

      12      goes to work at the facility, do they usually stay

      13      the duration, or do they usually look for other

      14      employment?

      15             JAMES SLEVIN:  No, they enjoy working there.

      16             They feel safe and secure there.

      17             And they -- most of them come in and want to

      18      retire from the facility.

      19             JAMES SPRY:  What I would say is that,

      20      I worked at Turkey Point in, uh -- south of Miami.

      21             And when I worked there, they had a turnover

      22      rate of 50 percent in, like, 2 years.

      23             No one's from there.

      24             A lot of the people come from out of state,

      25      they go there and get trained, and they take off,







                                                                  130
       1      you know, because they're not from Miami or that

       2      area.

       3             But here at Indian Point, we get very few

       4      people that leave once they are employed and get

       5      settled in.

       6             We have very few defections after hire.

       7             SENATOR RITCHIE:  Do you have a number of

       8      people who are actually seeking employment at the

       9      facility?

      10             JAMES SLEVIN:  Oh, yeah.

      11             We get it all the time.

      12             The utility workers, it's a great skilled

      13      market to be in.

      14             A lot of young men coming out of high school

      15      and, you know, looking for employment, it's a great

      16      field, it's a moving field.

      17             All of my facilities that I represent, I do

      18      get a good number of --

      19             JAMES SPRY:  Well, as we speak, there are

      20      plans to bring in 18 new employees, and that would

      21      be at entry level, in the maintenance area.

      22             We have constantly brought in operators,

      23      because the licensed operators are -- you know, you

      24      have to have those to operate the facility.

      25             And they've been -- we've been bringing them







                                                                  131
       1      in for years.

       2             But, we haven't hired any new maintenance

       3      people in a while, maybe within ten years.

       4             And, they've interviewed, and they're ready

       5      to hire, I believe, eighteen, as we are talking now.

       6             SENATOR RITCHIE:  I guess just a comment,

       7      that because I have three nuclear facilities in my

       8      district, I can say wholeheartedly that, the

       9      community, this is one of the places that are

      10      premium jobs, that those, you know, are looking to

      11      get into.

      12             And once they get there, they stay until they

      13      retire.

      14             And, so, I just -- as an observation, just

      15      would like to say, not to take it lightly when we

      16      were talking about these jobs, because it's not just

      17      a job.

      18             These are jobs, at least from my perspective,

      19      that people strive for, that provide in salary, that

      20      is something that you can sustain your family on,

      21      something that you work to achieve.

      22             It's not -- it's not just a job; it's a

      23      career.

      24             JAMES SLEVIN:  Yeah, and I agree with that,

      25      Senator Ritchie.







                                                                  132
       1             It's, also, we don't just look at our

       2      membership as jobs.

       3             We look at families, and growths of families.

       4             I mean, there's a lot of my members have --

       5      don't live far from the plant.

       6             I don't live that far.

       7             I live just north of it.

       8             And it's a great place to bring people up.

       9             And I see a lot of my members doing the same

      10      thing: starting their careers, and starting

      11      families, and making a better life for them and

      12      their children.

      13             Yeah.

      14             SENATOR MAZIARZ:  Thank you very much,

      15      gentlemen.

      16             JAMES SLEVIN:  Thank you.

      17             SENATOR MAZIARZ:  Our next witness is

      18      Darren Suarez of The Business Council.

      19             Darren.

      20             Mr. Suarez.

      21             Thank you very much, Mr. Suarez.

      22             We appreciate The Business Council testifying

      23      here today.

      24             DARREN SUAREZ:  Thank you, Senator Maziarz,

      25      and thank you Senator Ritchie and Senator Carlucci,







                                                                  133
       1      for having us here today, and for the opportunity to

       2      speak about Indian Point, and really to address the

       3      PSC proceedings.

       4             As stated, I am Darren Suarez, the director

       5      of government affairs for The Business Council.

       6             I appreciate the opportunity to speak with

       7      you.

       8             I'm appearing before you on behalf of the

       9      members of The Business Council in New York State to

      10      once again express our opposition of the

      11      Public Service Commission's current pursuit of an

      12      Indian Point contingency plan.

      13             The Business Council is the leading business

      14      organization in New York State representing the

      15      interests of large and small firms throughout the

      16      state, through the -- though, 72 percent of our

      17      members are small businesses.

      18             All totaled, our members employ more than

      19      1.2 million New Yorkers.

      20             The commission's current course to fast-track

      21      an expensive, economically unsustainable contingency

      22      plan for the potential retirement of Indian Point is

      23      predicated on unsubstantiated beliefs regarding the

      24      relicensing of Indian Point.

      25             The commission's current course of actions







                                                                  134
       1      has already cost ratepayers substantially, and has

       2      the potential to cost ratepayers substantially more,

       3      while the probability of Indian Point's imminent

       4      closure appears remote.

       5             The Business Council, on numerous occasions,

       6      has urged the commission to halt the current

       7      proceedings before additional economic damage is

       8      done to the ratepayers of the state of New York.

       9             Moreover, the commission, instead, should

      10      commit to advocating for the relicensing of

      11      Indian Point because of the undeniable importance

      12      the facility has had on the delivery of clean, safe,

      13      reliable, and affordable energy.

      14             The New York State Business Council is proud

      15      to join with the broad and diverse support for the

      16      Indian Point in New York.

      17             Numerous polls have demonstrated that the

      18      Westchester community is generally favorable towards

      19      Indian Point.

      20             Indian Point is a safe facility, and it is --

      21      its continued operation has proven positive impacts

      22      on jobs, the economy, and the environment.

      23             The Business Council is deeply troubled that

      24      the current future ratepayer costs resulting from

      25      the proceeding on a motion to -- of the commission







                                                                  135
       1      to review generation retirement plans, and that

       2      The Business Council has long held that the

       3      affordable energy rates are vital to the growth of

       4      New York's economy, particularly the manufacturing

       5      sector.

       6             The commission -- the Indian Point

       7      contingency plan has been established by the

       8      commission to cost consumers $811 million.

       9             The costly, unnecessary trial balloon assumes

      10      the State will somehow prevail before the

      11      Nuclear Regulatory Commission and close New York's

      12      largest power generator, the Indian Point nuclear

      13      power station, which produces 11 percent of the

      14      state's electricity.

      15             The current contingency plan requires

      16      ratepayers to subsidize whatever costs are incurred

      17      even if Indian Point's licensure is renewed and the

      18      projects are left unfinished because they are no

      19      longer necessary.

      20             The PSC has already authorized nearly

      21      10 million in expenditures to study the proposal,

      22      a cost the that Downstate New York and New Yorkers

      23      will pay through their energy rates.

      24             New York's ratepayers could be left on the

      25      hook for hundreds of millions of dollars in







                                                                  136
       1      undeveloped, mothballed, useless projects.

       2             Most troubling is that the Indian Point

       3      contingency plan is predicated on the rejection of a

       4      critical component of our energy infrastructure

       5      which is owned and operated safely by a private

       6      company who has made significant investments in the

       7      state of New York.

       8             Ratepayers should not be paying for plans or

       9      asked to subsidize the elimination of Indian Point

      10      when Indian Point should not cease to operate.

      11             Indian Point is essential to the

      12      affordability and reliability of electricity in

      13      New York.

      14             The license-renewal process has been

      15      approached on two tracks: one of those reviews, the

      16      safety; and the other, the environmental issues.

      17             An application must provide -- an applicant

      18      must provide the NRC an evaluation that addresses

      19      the technical aspects of the plant's aging, and

      20      describe the ways that those effects is managed.

      21             It must also prepare an evaluation of the

      22      potential impacts on the environment that the plant

      23      operates for another 20 years.

      24             The NRC reviews the application and verifies

      25      the safety and evaluation through inspections.







                                                                  137
       1             The State of New York has not supported the

       2      license renewal, and the State has publicly opposed

       3      the license renewal, because of concerns regarding

       4      the close proximity of the facility to a population

       5      area and to environmental concerns.

       6             Pursuant to the NRC relicensing process,

       7      energy needs -- Entergy has applied to the State

       8      Department of Environmental Conservation for the

       9      issuance of a water-quality certificate permit.

      10             DEC, in 2010, after extensive submittals by

      11      Indian Point, refused the issuing of the permit,

      12      arguing that the plant's everyday operations and

      13      effluents present an ongoing risk to the people and

      14      wildlife.

      15             Entergy has appealed the decision, and that

      16      process is ongoing.

      17             One specific concern the DEC has, is that

      18      they're focused upon the impingement and

      19      entrenchment and heat shock to numerous fish species

      20      in the Hudson River.

      21             The dangers to fish -- the danger to fish is

      22      more substantial.

      23             The plant's swallows and expels -- the plant

      24      takes in 2.5 billion gallons of water per day to

      25      cool its generation facilities.







                                                                  138
       1             To address the impingement and entrenchment

       2      and heat shock, DEC has suggested the development of

       3      the construction of cooling towers.

       4             The retrofitted cooling towers for a nuclear

       5      facility is without general precedent.

       6             To place cooling towers on the site, the

       7      company would have to blast 2 million cubic yards of

       8      rock and granite over a period of four years in

       9      order to make the space for the towers that are the

      10      size of two Yankee Stadiums.

      11             The conversion alone to the plant would cost

      12      $1.1 billion in construction and would last until

      13      2029.

      14             Additionally, the facility would be down a

      15      year without producing electricity, resulting in

      16      additional significant loss.

      17             As an alternative to the cooling towers at

      18      Indian Point, Entergy has proposed the development

      19      of cylindrical wedge-wires (CWW) screens that will

      20      protect a greater number of fish eggs and larvae

      21      than the cooling towers over the 20-year license

      22      period.

      23             From the -- for Indian Point to install

      24      wedge-wire technology, it could take three to

      25      five years, and cost $200 million.







                                                                  139
       1             Thus far, DEC has rejected the CWW screens as

       2      an available technology, in part, because there are

       3      no applications of CWW screens on nuclear

       4      facilities, but, the uncertainties associated with

       5      DEC's proposed cooling towers are far more

       6      technically significant than those with CW [sic]

       7      screens.

       8             Thus, the DEC's position on the availability

       9      of CW [sic] screens at Indian Point is inconsistent

      10      with DEC's position on the availability of cooling

      11      towers at Indian Point.

      12             In conclusion, I leave you with a quote from

      13      the New York City Department of Environmental

      14      Protection's commissioned report, by the

      15      Charles River Associates, "Indian Point Retirement

      16      Economic Analysis."

      17             "Every replacement option studied will result

      18      in a cost of an increase to energy consumers through

      19      the state, either through the increased market

      20      prices or subsidies to new generators.

      21             If the market is allowed to function without

      22      subsidies for new generation, consumer prices will

      23      see marked increases.

      24             The market would see wholesale cost increases

      25      of approximately $1.5 billion per year; or, roughly,







                                                                  140
       1      10 percent increase in our base-case scenarios.

       2             New York City consumers would pay

       3      approximately $300 million per year for wholesale

       4      energy; or, approximately, a 5 to 10 percent

       5      increase.

       6             Indian Point's retirement will force greater

       7      reliance on fossil-fueled generations resources,

       8      increasing the sensitivity of electricity prices to

       9      volatility in natural gas prices."

      10             Thank you very much for this opportunity to

      11      speak with you today.

      12             SENATOR MAZIARZ:  Thank you, Mr. Suarez.

      13             We appreciate the position and the opinion of

      14      The Business Council.

      15             Senator Ritchie, any comments or questions?

      16             SENATOR RITCHIE:  Just a couple of questions.

      17             Darren, how significant a factor are energy

      18      costs when a business is looking to either expand or

      19      to locate in New York State?

      20             DARREN SUAREZ:  They're a significant factor

      21      in businesses choosing to be here, to locate, but,

      22      also, continued operations.

      23             And, that's, more and more of our facilities

      24      are competing against other facilities, on an

      25      international basis, even in their own -- and even







                                                                  141
       1      in their own company.

       2             And it is a major contributing factor as to

       3      where they will locate.

       4             SENATOR RITCHIE:  How do you feel this

       5      proposal to shut Indian Point down would affect

       6      businesses looking to either expand or to locate

       7      here?

       8             DARREN SUAREZ:  It's gonna have a -- it --

       9      certainly, the uncertainty associated with it will

      10      have a chilling effect for those that are projecting

      11      out what their costs would be.

      12             And it will -- and the 811 million that's

      13      projected to be in the PSC's costs for replacement

      14      will have an effect on where companies choose to be.

      15             SENATOR MAZIARZ:  Thank you very much,

      16      Mr. Suarez.

      17             We appreciate it.

      18             Next, we're going to hear from, one at a

      19      time, but two former members of the New York State

      20      Assembly, Jerry Kramer, from the Affordable,

      21      Reliable Energy Alliance; and, John Ravitch, of

      22      The Business Council of Westchester County.

      23             Good morning, Mr. Kramer.

      24             Thank you for being here.

      25             ARTHUR "JERRY" KRAMER:  Chairman Maziarz,







                                                                  142
       1      Senator Ritchie, Senator Carlucci, you know, you've

       2      heard a lot today, and I'm going to sort of harken

       3      back to the days when I sat on your side of the

       4      rostrum, as to the questions that I think have been

       5      raised that I think are very legitimate for the

       6      Legislature to consider in evaluating this

       7      particular proposal.

       8             The very resolution by which the

       9      Public Service Commission imposed this new mandate

      10      on Consolidated Edison has as its language that

      11      it's, quote, "increasingly apparent that

      12      Indian Point," you know, "is in jeopardy of

      13      closing."

      14             And, clearly, the Public Service Commission

      15      is not listening to the Charles River, the various

      16      studies, and listening to the company.

      17             There's no dialogue going on between the

      18      Public Service Commission and the utility, to ask it

      19      exactly what its potential position is, but, you've

      20      heard it today.

      21             I don't envy Consolidated Edison under these

      22      circumstances, because they're sort of in the

      23      position of Woody Allen's old line about, "The lion

      24      and the lamb shall lie down, but the lamb won't get

      25      a good night's sleep."







                                                                  143
       1                  [Laughter.]

       2             ARTHUR "JERRY" KRAMER:  The problem that you

       3      have here, is that Consolidated Edison continues to

       4      have an ongoing relationship with the Public Service

       5      Commission, and they're not in very much of a

       6      position to say, That we're not going proceed to do

       7      exactly what you're mandating on us.

       8             But, let's look what they're really mandating

       9      on Con Ed and the ratepayers.

      10             $811 million is the number that's in the

      11      PSC resolution.

      12             So, let's start out with that at base.

      13             And we've also heard today that there's a

      14      halting procedure, and we can stop at any particular

      15      point.

      16             When you stop contracts of the magnitude that

      17      are involved here, there are penalties involved.

      18             The contract just doesn't end because you

      19      say, As of midnight tomorrow, this contract ceases

      20      to be operable.

      21             Secondly, whoever heard of projects of this

      22      nature without costs overruns?

      23             They just don't happen.

      24             They happen in all types of municipal work,

      25      and they happen in this type of work of this







                                                                  144
       1      magnitude.

       2             So I think what you're faced with here, is

       3      that this is an open-ended cost for all of the

       4      ratepayers in New York State, from Buffalo to

       5      Montauk Point.

       6             And there's just no rationale that -- and

       7      there's nothing in here that's a limiting factor as

       8      to what these costs are.

       9             I know Senator Maziarz said we've had these

      10      discussions in other forums, but this money would be

      11      better spent on strengthening the grid, actually

      12      making the grid work.

      13             It's nice to build a windmill if they let you

      14      in some part of New York, but it only connects to

      15      the library, and about a mile away, and that's as

      16      far as the energy goes.

      17             And we're not wheeling energy in and out of

      18      this state in an easy fashion.

      19             So, you know, with respect to the

      20      Public Service Commission's mandate on Con Ed, it

      21      really is very open-ended.

      22             And being the purpose of this hearing, is to

      23      look at ratepayer costs and competitive markets.

      24             I think we have to keep in mind that there's

      25      a lot more information that I think that the Panel







                                                                  145
       1      should be privy to from the Public Service

       2      Commission as this moves forward, and talking to

       3      Con Ed.

       4             By the way, Con Ed is going to spend

       5      $375 million to harden the grid.

       6             I consider that a meaningful expenditure.

       7             As will other utility companies around the

       8      New York State in the next year or two, to try to

       9      make the grid more, if you will, sustainable, should

      10      we have another 100-year storm, and another

      11      blackout, which was 10 years ago.

      12             I think there's another problem here, and

      13      that's got to do with, the two of you were not in

      14      the Legislature when the Shoreham debate took place,

      15      but why isn't there, as a component in this PSC

      16      study, the environmental impact of a closing?

      17             Today, if you get a Long Island Power

      18      Authority bill, there's still a line on there that

      19      says "Shoreham Plant," so that the people of

      20      Long Island are continuing -- and the Rockaways, are

      21      continuing to pay for the closing of the Shoreham

      22      nuclear power plant.

      23             Aside, you know, you've heard from the union

      24      representatives with respect to the number of people

      25      who are gonna lose their jobs, but the economic







                                                                  146
       1      impact throughout the region, from Indian Point,

       2      according to the Nuclear Energy Commission study

       3      some years ago, is $750 million a year.

       4             You're talking about all of the different

       5      vendors and others who rely on Indian Point, and

       6      that goes far beyond the Westchester region.

       7             So, how can you ignore the concept of what

       8      would happen if Indian Point closed, and not

       9      remember the debacle of Shoreham, which still, to

      10      this day, lingers in that region, and the people are

      11      paying the price for it.

      12             Municipalities overtaxed the facility, when

      13      it wasn't even opened.

      14             I can be almost sure, that in the case of

      15      Indian Point, municipalities and surrounding region

      16      have taken their fair share of taxes from utility

      17      companies, as they always do.

      18             So you've got this other factor, which is the

      19      Shoreham nuclear facility, how you can ignore

      20      history?

      21             It means, unfortunately, that we're doomed to

      22      repeat it.

      23             I think, also, the only part of the

      24      Charles River Study that was not mentioned this

      25      morning, was the one that New York consumers will







                                                                  147
       1      pay between 10 and 12 billion more in higher

       2      electricity costs through 2030.

       3             That's a pretty astounding number as a result

       4      of closing of one facility.

       5             And the last point I want to make is, is my

       6      continuing concern, on behalf of our organization,

       7      and as a person who served on your side of the

       8      rostrum, what kind of signals are New York State

       9      sending to the people who are sitting in Chicago on

      10      a couple of billion dollars worth of money, who want

      11      to invest in energy?

      12             New York right now is sending out the

      13      following signals:

      14             No hydrofracking.

      15             Wind is opposed.

      16             No nuclear.

      17             And the real question becomes, is, you know:

      18             Do we really -- you know, we can have an

      19      energy highway, but who wants to drive on it?

      20             I said, so the real question is:

      21             We have to reach the point in time where

      22      we're starting to send positive signals about

      23      investing in New York.

      24             And this particular type of thing,

      25      encouraging, you know, in effect, on the part of the







                                                                  148
       1      State, the closing of a facility, not understanding

       2      the economic impact of it, really is, What message

       3      are we sending?

       4             I mean, the fact of the matter is, you know,

       5      Senator, you mentioned about the wind project in

       6      your district.

       7             A proposal was made by the Long Island Power

       8      Authority to build a windmill 5 miles off of

       9      Jones Beach, and over a thousand people showed up at

      10      each of the hearings in opposition to it, because

      11      they claimed it would cause visual destruction of

      12      their view of the ocean.

      13             And that got a thousand people to come out

      14      and oppose it.

      15             So the answer is:

      16             There's a big global decision that we all got

      17      to make; and that is, you know, What message is

      18      New York going to continue to send to the rest of

      19      the country, when we want them to invest here?

      20             And this PSC project, if you will, which

      21      I guess is, sort of, almost like a shotgun wedding,

      22      surely isn't particularly good for the people in

      23      New York State.

      24             And it's the kind of thing that, hopefully,

      25      your Committee will get into it a lot more deeper,







                                                                  149
       1      because I think the long-range costs go far beyond

       2      $811 million.

       3             That's -- that's my testimony.

       4             SENATOR MAZIARZ:  Thank you very much,

       5      Mr. Kramer.

       6             Some very good points were made.

       7             I think it's fair, the comparison with the

       8      Shoreham and the closure there.

       9             I appreciate that.

      10             And I can tell you that -- that the reason

      11      we're having this hearing here today, and we've had

      12      other hearings, and we visited Indian Point, and, we

      13      have listened to those people who want -- are in

      14      favor, I should say, of closing Indian Point, and

      15      they'll be testifying later on today, we're

      16      interested in all opinions and all aspects of this,

      17      but we certainly are very concerned about the effect

      18      on jobs, on businesses, and on energy rates, because

      19      of exactly what you pointed out, the ability of

      20      people to invest in the state of New York.

      21             Senator Ritchie?

      22             SENATOR RITCHIE:  No, no questions.

      23             SENATOR MAZIARZ:  Thank you very much.

      24             ARTHUR "JERRY" KRAMER:  Thank you for your

      25      time.







                                                                  150
       1             SENATOR MAZIARZ:  Thank you very much,

       2      Mr. Kramer.

       3             John Ravitch, executive vice president & CEO

       4      of The Business Council of Westchester.

       5             JOHN RAVITZ:  Good afternoon.

       6             SENATOR MAZIARZ:  Thank you very much,

       7      Mr. Ravitz.

       8             JOHN RAVITZ:  Senator Ritchie, how you are

       9      you?

      10             SENATOR MAZIARZ:  I thought I'd point out

      11      earlier that you and Mr. Kramer were both former

      12      members of the Legislature.

      13             It didn't seemed to go over so well, so...

      14                  [Laughter.]

      15             SENATOR MAZIARZ:  And both members of the

      16      Assembly, too.

      17             Something that neither Senator Carlucci,

      18      Senator Ritchie, nor myself had the pleasure of ever

      19      serving there.

      20             JOHN RAVITZ:  Well, it was always a pleasure

      21      seeing you walking through the Chamber.

      22             Lots of fresh air.

      23             The hat that I wear now, I'm the

      24      executive vice president and COO for The Business

      25      Council of Westchester.







                                                                  151
       1             The BCW is the county's largest and most

       2      influential business membership organization.

       3             We represent about thousand members, ranging

       4      in size from the multi-international corporations

       5      and mid-sized businesses, to professional firms,

       6      not-for-profit organizations, and small business

       7      owners, in every sector of the county's diverse

       8      economy.

       9             I want to just piggyback on what Mr. Kramer

      10      talked about, and really drill down a little more,

      11      in terms of what the impact would be in

      12      Westchester County if Indian Point were to close.

      13             And to do that, I have left with you,

      14      Mr. Chairman and Senator Ritchie, a report that

      15      The Business Council of Westchester commissioned

      16      last September on an assessment of energy needs in

      17      Westchester County, and how it would affect the

      18      county, how it would affect our economy, and how it

      19      would affect, obviously, the individual residents of

      20      Westchester County.

      21             And I just want to share a few specifics that

      22      came out of this report, that I think are important

      23      for the record, if Indian Point were to close.

      24             Electric rates would increase by 6.3 percent

      25      or more, with consumers paying more than







                                                                  152
       1      $374 million per year in added electrical bills.

       2             By 2020, the probability of electrical

       3      outages would increase by 280 percent.

       4             Carbon emissions, a leading contributor to

       5      global warming, would increase by more than

       6      6 million tons annually, which is the equivalent of

       7      adding 1 million more vehicles on our roads in

       8      Westchester County.

       9             As a result of higher electrical rates and

      10      the closure of Indian Point, Westchester County

      11      would lose more than 3300 jobs, many of them

      12      high-paying jobs, representing over $200 million per

      13      year in lost wages.

      14             Westchester County would also lose

      15      $75 million per year in property tax and revenue

      16      sharing with the State.

      17             And, contributions to local charitable

      18      organizations would decline by $2 million annually.

      19             Overall, the downstate regional economy would

      20      be drained by some $11.5 billion, and that's

      21      inflation-adjusted numbers.

      22             As you know, Indian Point currently provides

      23      2,065 MW of electric generations for Westchester and

      24      the New York City area, producing over

      25      16 billion kilowatt hours per year.







                                                                  153
       1             This represents 59 percent of Con Ed's retail

       2      electrical sales, and 25 percent of all electrical

       3      sales in New York City and Westchester.

       4             The BCW report noted that, currently, there

       5      are no plans by any entity, public or private, to

       6      replace those electrical energy and capacities

       7      produced by Indian Point plants.

       8             And the report stated, quote, "Projected

       9      energy efficiency, demand-side management, and

      10      renewable resources cannot be added in time to

      11      offset the output of Indian Point, at least for

      12      foreseeable future."

      13             So I will leave the full report for you and

      14      other members of the Committee to review, and,

      15      obviously, if you would have any follow-up

      16      questions.

      17             I would be remiss, Mr. Chairman, and

      18      I understand Senator Carlucci had to leave, because

      19      he mentioned the issues of evacuation and safety

      20      plans.

      21             Prior to joining the BCW, I served as the CEO

      22      for the American Red Cross in Westchester County;

      23      and, also, the COO for the Red Cross in New York --

      24      Greater New York region.

      25             That gave me the opportunity to not only







                                                                  154
       1      observe, but to participate in many training

       2      exercises that the staff of Indian Point put on, and

       3      asked for the Red Cross's involvement in those

       4      tabletop exercises.

       5             They were thorough.

       6             They went through a lot of different

       7      scenarios that needed to be gone through.

       8             They reached out to those of us who would be

       9      serving as first responders, and the other

      10      organizations that would play a key role, if an

      11      evacuation plan had to be put into place.

      12             And it also showed me, that they had not only

      13      put in the resources for these plans, but other

      14      resources as well for the community at large.

      15             So, during those 4 1/2 years at the

      16      American Red Cross, serving as the CEO in

      17      Westchester County, the transparency, the working

      18      relationship on a daily basis, I know is very strong

      19      with the local county municipalities that would be

      20      involved, as well as the state and federal agencies.

      21             So, I just wanted to, I would be remiss

      22      again, if I didn't have the opportunity to share

      23      that with you as well.

      24

      25







                                                                  155
       1             SENATOR MAZIARZ:  Thank you, Mr. Ravitch.

       2             We appreciate that.

       3             Senator Ritchie?

       4             SENATOR RITCHIE:  No, no questions.

       5             Thank you.

       6             SENATOR MAZIARZ:  Thank you very much, John.

       7             JOHN RAVITZ:  Thank you.

       8             SENATOR MAZIARZ:  Appreciate it.

       9             You said, pretty much, what some previous

      10      speakers have said.

      11             So, we're now going to go, and I apologize in

      12      advance if I mispronounce his name,

      13      Phillip Musegaas, from the Hudson River Program,

      14      director of Riverkeeper.

      15             Philip.

      16             Philip, I'm sorry.

      17             How did I do?

      18             PHILLIP MUSEGAAS, ESQ.:  That's quite all

      19      right.

      20             You did fairly well.

      21             SENATOR MAZIARZ:  Okay.

      22             PHILLIP MUSEGAAS, ESQ.:  It's Musegaas.

      23             SENATOR MAZIARZ:  Musegaas.

      24             Boy, I didn't do good at all.

      25             PHILLIP MUSEGAAS, ESQ.:  I've heard a lot of







                                                                  156
       1      worse, so...

       2             Thank you.

       3             SENATOR MAZIARZ:  Thank you very much for

       4      being here today, Phillip.

       5             We appreciate, your organization, your

       6      willingness to come here and testify, certainly.

       7             PHILLIP MUSEGAAS, ESQ.:  Thank you, Senator.

       8             We appreciate the chance to -- for

       9      Riverkeeper to provide our perspective on the

      10      Public Service Commission's contingency planning,

      11      and also to respond to some of the questions that

      12      you raised in a letter to us, inviting us to testify

      13      today, which I'll get to at the end of my testimony.

      14             And I'll abbreviate the written testimony

      15      I submitted.

      16             I would like to take a couple of minutes at

      17      the end to --

      18             Thank you.

      19             -- to respond to some of the earlier comments

      20      that were made today.

      21             That's maybe one benefit of going almost

      22      last, is that you can listen to other folks testify,

      23      and have some -- hopefully, some constructive

      24      responses.

      25             SENATOR MAZIARZ:  Sure.







                                                                  157
       1             Sure, thank you.

       2             We appreciate it.

       3             PHILLIP MUSEGAAS, ESQ.:  Riverkeeper is a

       4      member-supported organization.

       5             We have about 5,000 members in the Hudson

       6      Valley.

       7             And our mission is to defend and restore the

       8      Hudson River and its tributaries, and to protect the

       9      drinking-water supply for 9 million New York City

      10      and Hudson Valley residents.

      11             We've been actively involved on a wide range

      12      of Indian Point safety and environmental issues,

      13      actually, since the plant was built, when we were an

      14      earlier iteration of our organization.

      15             We've become much more involved on safety

      16      issues regarding Indian Point since --

      17      unfortunately, since 9/11.

      18             And we have a campaign currently underway,

      19      which I'm sure you're aware of, to prevent the

      20      relicensing of Indian Point, and retire and

      21      decommission the plant.

      22             In my testimony, I'll briefly summarize

      23      Riverkeeper's participation in the PSC proceeding

      24      that we're discussing today.

      25             And, I'd also like to mention, and I put into







                                                                  158
       1      the record, an independent study that was

       2      commissioned by Riverkeeper, not in the context of

       3      this proceeding, but, actually, at the outset of the

       4      Indian Point Nuclear Regulatory Commission hearings,

       5      we partnered with Natural Resources Defense Council,

       6      and we hired a company called "Synapse Energy

       7      Economics" to basically prepare a report -- a series

       8      of two reports, but I'll talk about the later one

       9      today, that sets out a road map for replacing

      10      Indian Point's power under slightly different time

      11      frames than we're discussing today.

      12             So, just to keep that in context.

      13             And then I'll also talk about the concerns

      14      you raised in your letter regarding the loss of

      15      jobs, and a little bit regarding the cost impacts.

      16             I also want to mention, just -- you know,

      17      there was some discussion with Senator Carlucci

      18      especially about the various legal proceedings that

      19      are going on; very complicated, overlapping

      20      proceedings.

      21             Riverkeeper is an active party in the

      22      Nuclear Regulatory Commission proceeding.

      23             I'm the lead attorney in that.

      24             We're also a party in the consolidated

      25      proceeding before the DEC, regarding the







                                                                  159
       1      pollution-discharge permit under the Clean Water Act

       2      that is being litigated right now for Indian Point;

       3             And, the water-quality certification, which

       4      I believe the Entergy spokesman mentioned.

       5             So, I want to give you a little more context

       6      on those, granted we have time on that.

       7             Riverkeeper's position is that Indian Point's

       8      continued operation presents a risk to the

       9      20 million people living and working within 50 miles

      10      of the plant, and its operation continues to take a

      11      severe toll on the aquatic life in the Hudson; hence

      12      we have the these permit proceedings before the DEC,

      13      to try to require Indian Point to upgrade its

      14      environmental cooling-water intake system to prevent

      15      that impact.

      16             Due to its location, its history of

      17      accidents, which I'm prepared to talk about if you

      18      so desire, radioactive water leaks, and unsafe

      19      storage of nearly 2,000 tons of toxic nuclear waste,

      20      Riverkeeper believes the risk of continuing to

      21      operate Indian Point clearly outweighs its benefits.

      22             And I would be happy to provide any

      23      information, if that's helpful to the Committee, and

      24      to the Chairman, regarding these safety issues.

      25             SENATOR MAZIARZ:  Sure.







                                                                  160
       1             PHILLIP MUSEGAAS, ESQ.:  We're an active

       2      party in the Public Service Commission proceeding,

       3      as I mentioned, and we joined with the

       4      Natural Resources Defense Council and the

       5      Pace Energy and Climate Center in submitting

       6      comments early in the proceeding on the Indian Point

       7      contingency plan.

       8             In general, we support the plan.

       9             I think we appreciate the testimony that was

      10      given earlier today by Mr. Quinones, and by the

      11      Con End spokesperson, about the plan.

      12             In our comments, we urged for stronger

      13      consideration of increasing the amount of energy

      14      efficiency and demand-response tools beyond

      15      100 megawatts.

      16             And, certainly, I have submitted our comments

      17      which have more detail on that to the Committee

      18      today.

      19             In terms of energy-efficiency potential, our

      20      comments actually reference the 2012 Synapse report

      21      which I mentioned, which found that a 1.5 percent

      22      annual demand reduction can reasonably be achieved

      23      in New York over the next decade, leading to

      24      approximately 21,000 gigawatts of cumulative savings

      25      by 2022.







                                                                  161
       1             And as I mentioned earlier, our

       2      energy-replacement study looked at replacing

       3      Indian Point's power, assuming that the reliability

       4      concerns would not come in until about 2020.

       5             So, looking at different assumptions than

       6      I believe NYISO and Con Ed does.

       7             So just to -- if you think about why the

       8      numbers are so different, that's certainly why.

       9             The 2012 Synapse report I mentioned earlier,

      10      just very briefly, provides a road map to replacing

      11      Indian Point's power using entirely clean renewable

      12      energy and energy-efficiency measures in equal

      13      parts.

      14             And I put that report in my testimony, and

      15      I'm happy to answer questions on that as well.

      16             Their report showed, again, that we believe

      17      Indian Point's power can be replaced on time to

      18      avoid any reliability concerns, and can be done

      19      affordably.

      20             Our experts estimated that, under their plan,

      21      which is more aggressive in terms of energy

      22      efficiency and more aggressive in renewables, that

      23      the ratepayer cost increases to Downstate New York

      24      ratepayers would be, roughly, about 1 percent a

      25      month, which equates to about $1.20 a month in rate







                                                                  162
       1      increases.

       2             Again, that's reflecting very high use of

       3      energy-efficiency measures and a higher reliance on

       4      renewables, so that's separate.

       5             We didn't look at transmission upgrades that

       6      are being looked at in this proceeding, so, it's in

       7      the context of this, but it's based on some

       8      different assumptions.

       9             Finally, I want to just go to a couple of the

      10      issues you raised in your letter to us.

      11             One is regarding the loss of union jobs.

      12             There was some discussion by previous

      13      testifiers about the idea that -- of course, there's

      14      a lot of discussion about, if you close Indian Point

      15      in kind of a vacuum, that you're going to have a

      16      massive loss of jobs and a massive loss of economic

      17      resources in the -- economic benefits to the region.

      18             In terms of decommissioning, we believe that

      19      it would be very helpful to the public, and actually

      20      to the Legislature, and we would make an informal

      21      request, I think, at this point, for the Chairman

      22      and this Committee to consider doing a study of what

      23      kinds of jobs would be required at Indian Point

      24      during a decommissioning of the plant.

      25             You know, if we're talking about the







                                                                  163
       1      potential of retiring Indian Point, that, of course,

       2      leads then to the decommissioning of the plant.

       3             And based on other nuclear plants that have

       4      been decommissioned around the country, we believe

       5      it's worth the study, because I think that that's a

       6      high number of jobs that are -- people that are

       7      currently employed at Indian Point could be employed

       8      in decommissioning the plant.

       9             And, decommissioning is not a simple

      10      exercise.

      11             It's a very complex process.

      12             It takes -- I think, other plants, it's taken

      13      anywhere from 10 to 15, to nearly 20 years to

      14      decommission older nuclear plants.

      15             And, so, Indian Point, in particular, has

      16      a -- is a very dense site.

      17             We have the concern, and the problem with the

      18      radioactive water plumes that are in the groundwater

      19      underneath the site now.

      20             And, so, decommissioning is going to take

      21      additional time and additional resources, but, it

      22      will provide jobs, and it will provide many of the

      23      same skilled jobs that are currently being employed

      24      at the plant.

      25             So, you know, we don't take the idea of job







                                                                  164
       1      loss lightly by any means.

       2             We're concerned about the river, and our

       3      focus is on the environment, but, we certainly think

       4      that we should have a full understanding of the

       5      impacts of closing.

       6             And that not only means the immediate job

       7      losses, but, what kinds of jobs will be there long

       8      term, in terms of decommissioning, and also in terms

       9      of managing and securing the spent fuel that will be

      10      on site.

      11             The nuclear waste that Senator Carlucci

      12      mentioned will be on site for the foreseeable

      13      future, unfortunately.

      14             In addition, I wanted to talk about the --

      15      very briefly about the -- this question about how

      16      much power Indian Point supplies to New York City

      17      and Westchester County.

      18             And I think we all hear the "25 percent"

      19      number quite a bit.

      20             I think there's debate whether Indian Point's

      21      public power-purchase agreements are the only power

      22      they sell, versus a number -- versus selling power

      23      into the open market, versus private contracts with

      24      the power.

      25             I think it would benefit all of us, and







                                                                  165
       1      benefit the public, to really get a sense of what

       2      the actual percentage is; and not only what

       3      Indian Point is capable of sending into the grid,

       4      and in terms of raw capacity power, how much it

       5      represents in terms of percentages, but, actually,

       6      on a daily basis, or a monthly basis, what is the

       7      percentage of power it supplies, literally, into the

       8      marketplace?

       9             Finally, you mentioned in your letter of

      10      August 28th, I think your concerns, and they're

      11      justifiable concerns, about the -- and correct me if

      12      I'm wrong about this, but the length of time that

      13      it's taken the Nuclear Regulatory Commission to kind

      14      of work through the relicensing proceeding.

      15             One thing I do want to mention is that, up

      16      until the present time, the NRC proceeding and the

      17      state permit proceedings had been moving along at a

      18      parallel rate.

      19             Where they overlap is in -- is in the DEC's

      20      denial of the water-quality certification, which

      21      happened in 2010.

      22             And in terms of the SPDES permit that

      23      regulates the cooling-water intake, that's a

      24      separate proceeding.

      25             So those have been going on, in one form or







                                                                  166
       1      another, since 2004, a few years before Entergy

       2      applied for relicensing.

       3             The relicensing proceeding has been going on

       4      from 2007 to now.

       5             One of the major delays in that proceeding

       6      was, the time it took the Nuclear Regulatory

       7      Commission staff to actually complete the

       8      environmental impact study.

       9             It took about four years just to get through

      10      the initial draft and the final EIS, and then they

      11      supplemented that with an additional study, which

      12      has just been completed, and gone through the

      13      public-comment process now.

      14             So, I just want to give you a sense of the

      15      context.

      16             It's a very large, complicated proceeding,

      17      but, some of the delays have been caused, certainly,

      18      the proceeding takes longer because New York State's

      19      Attorney General and Riverkeeper and the Clearwater

      20      are active parties.

      21             We raised a number of contentions that have

      22      to be heard in the hearing, and that takes time, but

      23      there has been a very slow process on the NRC staff

      24      side.

      25             So just want to give that you context so you







                                                                  167
       1      understand the process a little better.

       2             Finally, I just want to comment a little bit

       3      on a few things that the Entergy spokesman said, and

       4      not in a desire to get into a debate, but in a

       5      desire to give you our perspective and make sure

       6      you're fully informed.

       7             SENATOR MAZIARZ:  Sure.

       8             Thank you.

       9             PHILLIP MUSEGAAS, ESQ.:  Mr. Twomey,

      10      I believe, mentioned the NRC staff has completed its

      11      final safety-evaluation report for Indian Point.

      12             That's actually incorrect.

      13             They completed an initial report, but they

      14      are doing the second supplement to that.

      15             And so, again, with the staff, the NRC staff

      16      is taking a very long time on this application.

      17             We are still waiting for a supplement.

      18             And we have to wait for that to be complete

      19      before we can move forward with the second round of

      20      hearings on these safety issues, because the safety

      21      issues that still have to be heard in the hearing

      22      are directly related to the work that the staff is

      23      doing.

      24             We've also heard a lot of discussion today,

      25      not only by Mr. Twomey, but I believe by a number







                                                                  168
       1      of other testifiers, regarding the Charles River

       2      Associates report that was commissioned by

       3      New York City to look at Indian Point replacement.

       4             And there was repeated mention of the very

       5      high economic costs and the high ratepayer costs

       6      that would ensue for -- if Indian Point were closed

       7      down and replaced.

       8             I think it's critically important that the

       9      Committee, and both of you here, are aware that, in

      10      that study, New York City, for reasons I'm not clear

      11      on, presented a replacement scenario that relied on

      12      about 1,000 megawatts of offshore wind power and

      13      1,000 megawatts of, I believe, a single, very large

      14      natural-gas plant.

      15             So, the replacement scenario they chose is

      16      inherently a very expensive scenario, and it's

      17      very, very different than what we are looking at

      18      today, in terms of Public Service Commission's

      19      replacement of using generation -- some new

      20      generation, some new upgraded transmission projects,

      21      and then this energy-efficiency portfolio.

      22             So, the reason you're hearing numbers that

      23      are so high is because New York City chose some of

      24      the most expensive ways to replace Indian Point's

      25      power, particularly using offshore wind.







                                                                  169
       1             It's a very expensive form of power.  It's

       2      coming -- the price is coming down slowly, but, in

       3      the context of all the replacement sources that

       4      we're looking at and options that we're looking at,

       5      it's probably on the very expensive end.

       6             And, so, I just think it's important that we

       7      note that.

       8             Mr. Twomey also mentioned that DEC had not

       9      made a final decision on this water-quality

      10      certification for Indian Point.

      11             In fact, DEC did make a final decision in

      12      2010; in April of 2010.

      13             And I'm happy to follow up after the hearing

      14      and send you a number of letters, both the denial

      15      letter, and, subsequent correspondence from the DEC,

      16      both to the state of New York and to the

      17      Nuclear Regulatory Commission, literally, explaining

      18      that this was an agency decision to deny the

      19      water-quality certification, which is needed for

      20      Indian Point's license renewal.

      21             And the State, in that denial, gave Entergy

      22      the option and the opportunity to request a hearing

      23      to challenge that denial.

      24             And that's the hearing process that we're in

      25      now.







                                                                  170
       1             So, it's more than just a semantical

       2      difference.

       3             The state has taken a position that -- and

       4      denied that permit.

       5             And then, the reason that's important in this

       6      context is, that is one of the two state permits

       7      that -- where the State has some veto authority, in

       8      a legal context, to prevent the relicensing.

       9             The second one is the Coastal Zone Management

      10      Act review, which other people have mentioned is

      11      underway now, and that possibly could conclude

      12      within the next year.

      13             So, we could have a decision by the

      14      Department of State, I think, within a year or so,

      15      whether that -- whether they are going to approve or

      16      deny that's -- that consistency review.

      17             And I'm happy to answer questions about that.

      18             I also want to mention, there was --

      19      I believe Senator Carlucci asked a number of

      20      questions about spent-fuel storage and nuclear-waste

      21      storage at the site.

      22             Mr. Twomey mentioned that Entergy has

      23      decommissioning funds that could be used to pay for

      24      the cost of storing spent fuel.

      25             That's actually not technically correct.







                                                                  171
       1             The NRC regulations don't allow

       2      decommissioning funds to be used for the ongoing

       3      cost of storing spent fuel.

       4             Decommissioning funds are solely in the fund,

       5      and kept separate from other operational costs, to

       6      pay for the cleanup of the site.

       7             And, theoretically, down the road, if there's

       8      still spent fuel on the site, Entergy would have to

       9      pay for that.

      10             But I want to be clear that this is not

      11      Riverkeeper saying this.

      12             These are NRC regulations: keep those things

      13      separate.

      14             The reason for that is, power companies, like

      15      Entergy, have very actively been suing the federal

      16      government in the Federal Court of Claims to recoup

      17      the costs of storing all the spent fuel on their

      18      site.

      19             They've been suing the Department of Energy,

      20      and they've been winning in federal claims court;

      21      and so, there are damages, in the number of billions

      22      of dollars coming back to companies, like Entergy,

      23      and other companies that run nuclear plants, to

      24      offset that cost.

      25             Just a final comment:







                                                                  172
       1             You know, there's a lot of, I think, very

       2      compelling testimony about people that work at the

       3      plant, and others, saying how the plant has an

       4      excellent safety record.

       5             Riverkeeper's long-range concerns about the

       6      radioactive water leaks that -- which have gone into

       7      the Hudson River.  These were undetected leaks until

       8      2005.

       9             We've raised concerns about the risk of the

      10      plant, as you know well.

      11             I also want to note that, in terms of safety

      12      and security, two independent security guards, over

      13      the past year, have filed lawsuits against

      14      Indian Point, and raised whistleblower claims with

      15      the Nuclear Regulatory Commission, regarding

      16      significant security concerns, and alleged security

      17      lapses, at Indian Point.

      18             And one of these, at least, I know is a

      19      decorated army veteran.  Served in Afghanistan, and

      20      I believe in Iraq.

      21             So these are, again, not just disgruntled

      22      employees.  These are people that worked at the

      23      plant for years, that alleged that they are serious

      24      security concerns.

      25             So I think there are active concerns about







                                                                  173
       1      safety and security at Indian Point that we need to

       2      keep in mind.

       3             But -- oh, I'm sorry.

       4             One other thing, if I may.

       5             I don't want to go over time.

       6             Senator Ritchie, you asked a number of

       7      questions about the -- about the Nine Mile Point and

       8      Fitzpatrick plants.

       9             I just wanted to make sure that you were

      10      aware, and that the Committee was aware, that,

      11      actually, all three plants that are on the

      12      Great Lakes -- the Ginna, Nine Mile Point, and

      13      Fitzpatrick -- have all been relicensed by the

      14      Indian -- not by the Indian Point -- by the

      15      Nuclear Regulatory Commission for 20-year license

      16      terms.

      17             And so, in terms of concerns about this

      18      similar type of scenario unfolding for those plants,

      19      they have been relicensed for second terms.

      20             In -- I know for Fitzpatrick, that plant went

      21      through its 401 certification process with the State

      22      and was granted a 401 certificate, because it

      23      complied with it, and it's -- I believe put in

      24      systems that the DEC required to minimize its impact

      25      on the Great Lakes marine ecosystem.







                                                                  174
       1             So, different factual contexts than

       2      Indian Point's.

       3             Indian Point's, essentially, been challenging

       4      New York State's requirements to install

       5      closed-cycle cooling, and to do other things at the

       6      plant, for over 10 years now.

       7             And, so, that's one reason why we're in this

       8      permitting proceeding with the State that's now

       9      overlapping with the nuclear-renewal proceeding.

      10             That's all I have today.

      11             Thank you for giving me a chance to speak.

      12             SENATOR MAZIARZ:  Thank you very much,

      13      Mr. Musegaas.

      14             We appreciate your perspective, and you

      15      coming here today.

      16             Just a couple of points before I ask

      17      Senator Ritchie if she has anything.

      18             You know, you talked about the employees.

      19             And, you know, it's interesting, how we have

      20      all these different studies, and some of them lead

      21      to much, almost diametrically opposed conclusions,

      22      but, that's the way it goes.

      23             And, you know, as far as the, you know,

      24      people being employed by the decommissioning of the

      25      plant, I would just add this perspective to that:







                                                                  175
       1             That, you know, I think it would be very

       2      difficult to get qualified, capable, a higher level

       3      of employees that I think Indian Point tries to get,

       4      and Entergy tries to get now, in some something that

       5      they know is, is eventually going to be terminated,

       6      whether it takes, you know, you said up to 10 years,

       7      you know, 5 years, or whatever.

       8             The percent, I just -- I just want to comment

       9      on a couple of things that you said.

      10             PHILLIP MUSEGAAS, ESQ.:  Sure, sure.

      11             SENATOR MAZIARZ:  And you can, by the way,

      12      comment right back.

      13             The percentage of power, you know, whether

      14      it's, uh -- you know, whether it's 20 or 25, I have

      15      heard those estimates kicked around a lot too.

      16             And you wonder, you know, how can it be?

      17             I think, you know, from our analysis, a lot

      18      of it has to depend, obviously, on the time of the

      19      year, you know, and power usage --

      20             PHILLIP MUSEGAAS, ESQ.:  Absolutely.

      21             SENATOR MAZIARZ:  -- particularly in the

      22      city.

      23             But bottom line is, it's still 2,000 -- or

      24      maybe a little more -- 2,000 megawatts of capability

      25      of producing that much power.







                                                                  176
       1             You know, I'm certain that, you know, in the

       2      middle of the week during August, they probably

       3      produce all of that, and then some.

       4             I'm most familiar with the, you know,

       5      Power Authority and the Niagara Power Project, which

       6      happens to be in my backyard.

       7             You know, and I know, you know, the way that

       8      they operate it is, when the demand is there,

       9      they're going to run to the maximum capacity to get

      10      it.

      11             So, it is still -- still is very unclear, and

      12      you heard testimony after testimony from some pretty

      13      capable individuals.

      14             Gavin Donohue, the Independent Power

      15      Producers, I mean, his statement couldn't have been

      16      any stronger, you know, that -- that this would

      17      cause this -- this is my term, not his term, but, a

      18      catastrophic reaction in the system when you're

      19      taking all of that power off the grid.

      20             But I respect, you know --

      21             PHILLIP MUSEGAAS, ESQ.:  Certainly.

      22             SENATOR MAZIARZ:  -- you know, technically,

      23      it could be done.

      24             And as far as, I just want to comment on the

      25      denial of the water-quality permit.







                                                                  177
       1             I think, at least from our perspective on

       2      this Committee, we did understand that that permit

       3      had been denied; that it is in the appeals process.

       4             And he probably wasn't as clear about that as

       5      he should have been, but, we understood that.

       6             PHILLIP MUSEGAAS, ESQ.:  Okay, wonderful.

       7             SENATOR MAZIARZ:  With that, I'll turn it

       8      over to Senator Ritchie for any questions or

       9      comments.

      10             SENATOR RITCHIE:  Just a comment, I guess, to

      11      start.

      12             I understand what you're saying, that the

      13      facility in my district has already been -- gone

      14      through the relicensing procedure.

      15             I guess, for me, the question is, because

      16      Indian Point has -- is in the process of being

      17      relicensed, or attempting to be relicensed, and they

      18      have not, at any point, said that they were going to

      19      retire the facility, and now this contingency

      20      process is underway, it gives me pause that, next

      21      year, that facility would have to refuel.

      22             And at that time, even though this is about

      23      relicensing, would the PSC be able to step in and

      24      say:  Now it's time for you to refuel.  You know, we

      25      really don't want you to undertake that process, and







                                                                  178
       1      we're going to put a contingency plan in place?

       2             So, I guess -- I guess there's a gray area,

       3      as far as I'm concerned, about how all of this took

       4      place.

       5             And the fact that, why, if we have a facility

       6      that hasn't said they're going to look at retiring

       7      the plant, why, all of a sudden, in the middle of

       8      relicensing, considering they can operate until the

       9      decision's made, why this is already underway?

      10             And I guess I don't really understand how

      11      they're going to put something in place, until they

      12      have the final decision whether it can operate or it

      13      can't.

      14             So, I think there's too many balls in the air

      15      for me to be comfortable with.

      16             So, that's why I keep asking the question:

      17             Why -- you know, what kind of precedence are

      18      we setting here?

      19             Because this kind of came out of the blue.

      20             So...

      21             PHILLIP MUSEGAAS, ESQ.:  I understand.

      22             I think, just a quick response:

      23             I mean, I think I would support what

      24      Mr. Quinones said at the outset, and -- I mean, in

      25      terms of a decision, whether to continue with a







                                                                  179
       1      refueling outage or not, that's certainly an

       2      economic decision that Entergy has to make.

       3             But I think Indian Point is unique in many

       4      ways, because of the size of the plant, because of

       5      the legal and kind of regulatory context that we

       6      find ourselves in, where the plant is going through

       7      a long relicensing process with the NRC, with a lot

       8      of opposition from the Attorney General, and from

       9      less opposition, but, some from us as well.

      10             And then these state environmental permits,

      11      which, you know, we have a -- we have an adversarial

      12      context, where Entergy doesn't believe, either they

      13      are subject to the permits, or that -- that the

      14      additional environmental upgrades that the State is

      15      saying need to be done, Entergy disagrees with that.

      16             And so we're, I think, in some ways, it's

      17      this adversarial context is causing more delay and

      18      more time to go by, and contributing to this sense

      19      of not knowing when, how this is all going to wrap

      20      itself up.

      21             I would -- you know, I would just make a

      22      comment about the Coastal Zone Management Act

      23      review:  By that -- under that law, the Department

      24      of State actually has to make a determination on

      25      that application, I believe, within six month of







                                                                  180
       1      starting its review.

       2             And it's begun it -- well, it was out for

       3      public comment at the end of August.

       4             So, theoretically, you may have a final

       5      state-agency decision on -- you know, on that

       6      review, which -- actually, which also is a

       7      precondition for relicensing, in the spring.

       8             And so, hopefully, you know, whichever way

       9      the State decides on that, that may provide some

      10      additional clarity in the spring of 2014, or the

      11      summer of 2014, as to where this is all headed.

      12             But I -- you know, I share your concern that

      13      it's not a clear process, but I think, out of an

      14      abundance of caution, given this legal dispute

      15      that's ongoing in these different proceedings, that

      16      it makes sense for the State to plan as much as

      17      possible.

      18             Because if we don't, and we get to 2016 or

      19      2017, and all the appeals start to run out and we --

      20      Entergy decides to close for, you know, whatever the

      21      decision is, then we won't have put those plans in

      22      place, and we'll be in a much more difficult

      23      position.

      24             So that would -- that's how I would respond

      25      to that.







                                                                  181
       1             SENATOR RITCHIE:  Well, I certainly

       2      understand how sensitive this issue is, and that

       3      there are different perspectives on what should go

       4      on.

       5             But, it is kind of difficult, sitting in my

       6      seat, that we have something that we're planning to

       7      put in place, when we don't even know whether the

       8      license will not be granted.

       9             And in the meantime, I understand how

      10      important it is to have the plan in place, because,

      11      you know, this is going be quite -- quite lengthy.

      12             But if something happens and the relicense is

      13      granted, you know, and I have to think, how many

      14      manhours, and how much of the taxpayers' money, has

      15      gone into play in this process of going through

      16      something that we don't even know is going to

      17      happen.

      18             So, you know, it's something that's not cut

      19      and dry.

      20             And I certainly appreciate you coming, and

      21      giving your comments, so, you know, I can see

      22      somewhat of a different perspective.

      23             So I just have one question:

      24             Can you just tell me what you do believe the

      25      proper mix of fuel sources in New York State should







                                                                  182
       1      be?

       2             PHILLIP MUSEGAAS, ESQ.:  Well, I believe

       3      it's --

       4             Under this contingency plan, or to replace

       5      Indian Point?

       6             SENATOR RITCHIE:  No, I guess, in general.

       7             I guess -- do you -- do you support any

       8      nuclear power, or are you opposed to that, you know,

       9      as a blanket statement?

      10             PHILLIP MUSEGAAS, ESQ.:  No, we -- I'll be

      11      very specific, and I appreciate you asking that.

      12             Riverkeeper is specifically focused on

      13      Indian Point, both, for the environmental impacts,

      14      and the safety risks that it poses -- that we

      15      believe it poses, and that I think the

      16      State Attorney General believes it poses to the

      17      area.

      18             And, so, our efforts to close the nuclear

      19      plant are entirely focused on Indian Point.

      20             We do get involved, and we are actively

      21      involved, in some national nuclear issues that have

      22      a direct relation to Indian Point.

      23             The nuclear-waste storage is one of them.

      24             We were a party in a case in the D.C. Circuit

      25      Court of Appeals, where we won a ruling from the







                                                                  183
       1      Circuit Court against the NRC regarding waste

       2      storage.

       3             But the reason we're involved in that, is

       4      because that's how the NRC regulates nuclear waste,

       5      focus -- you know, goes back directly to how it's

       6      managed at Indian Point.

       7             But, in terms of upstate nuclear plants, we

       8      have not taken a position on those.

       9             And, you know, our area of jurisdiction, if

      10      you'll call it that, is the Hudson Valley and upper

      11      New York Harbor and the Hudson River.

      12             And, so, I -- we don't have the resources or

      13      the time to -- you know, to take a position or weigh

      14      in on upstate nuclear plants.

      15             There are other groups in the state that do.

      16             You know, we gave general concerns about --

      17      primarily about nuclear-wastes storage nationally.

      18             And -- but, you know, our focus is

      19      Indian Point, and has always been, and it will

      20      continue to be.

      21             Thank you.

      22             SENATOR MAZIARZ:  So you're not opposed to

      23      nuclear energy, just in general?

      24             PHILLIP MUSEGAAS, ESQ.:  Riverkeeper is not

      25      opposed to nuclear energy.







                                                                  184
       1             We're certainly not supportive of it.

       2             I mean, I think we are -- we have serious

       3      concerns, and other water-keeper -- we're part of a

       4      large alliance of keeper organizations around the

       5      country.

       6             Other keepers in the south, and out west,

       7      work on nuclear issues as well.

       8             I think we have a major concern with the

       9      nuclear-waste problem that we have, and it's a

      10      national problem.

      11             It's particularly acute at Indian Point

      12      because we have a large amount of nuclear waste

      13      stored on the banks of the Hudson River.

      14             We've had a history at Indian Point of the

      15      spent-fuel pools leaking into the groundwater,

      16      contaminating the groundwater, and leaking into the

      17      Hudson River.

      18             And so, for us, as a river organization,

      19      we're very concerned that, if this stuff isn't going

      20      anywhere, it's going be stored there for 100 years,

      21      and it hasn't been managed properly already, what

      22      are the future impacts going to be?

      23             So that -- that's an issue we care deeply

      24      about.

      25             And we are involved, on a national level, on







                                                                  185
       1      that issue, to make sure that -- or, to do our best

       2      to make sure that the NRC finds better ways of

       3      requiring these plants to store it.

       4             And moving it to dry-cask storage is one way.

       5             And that was discussed a little bit earlier

       6      today, but, Entergy's current plan is only to move

       7      as much spent fuel out of the pools as they need to

       8      to continue operating the plant.

       9             We believe they should move much more fuel

      10      out of the pools to reduce the accident risk and to

      11      store it more safely.

      12             So, I hope that -- I believe that answers

      13      your question.

      14             SENATOR MAZIARZ:  Thank you.

      15             Thank you very much, Mr. Musegaas.

      16             PHILLIP MUSEGAAS, ESQ.:  Thank you.

      17             SENATOR MAZIARZ:  We appreciate it.

      18                  [Applause.]

      19             SENATOR MAZIARZ:  Our next witness is

      20      Susan Shapiro, with Radiation and Public Health

      21      Project.

      22             Susan.

      23             Hi.

      24             Thank you for being here today, Susan.

      25             SUSAN SHAPIRO, ESQ.:  Thank you for giving me







                                                                  186
       1      this opportunity to present to you.

       2             I'm also not only representing

       3      Radiation Public Health Project, but, also, the

       4      Sierra Club Atlantic Chapter; and the New York

       5      Environmental Law and Justice Project; and the

       6      Indian Point Safe Energy Coalition.

       7             And this binder will have a lot of the backup

       8      reports that I will briefly discuss.

       9             I'm not going to into them in depth, but,

      10      there's a lot of -- because there's a -- there was

      11      lot of information given you today by different

      12      parties.

      13             SENATOR MAZIARZ:  Yes.

      14             SUSAN SHAPIRO, ESQ.:  And there's many

      15      studies that I think would be very helpful for you

      16      to look at, to understand this issue, and --

      17             SENATOR MAZIARZ:  You're going to submit

      18      that?  You're going to leave it?

      19             SUSAN SHAPIRO, ESQ.:  Yes, I'm going to

      20      submit that to you.

      21             SENATOR MAZIARZ:  Okay.

      22             Thank you.

      23             SUSAN SHAPIRO, ESQ.:  First of all, I want to

      24      say this room is freezing, and maybe we can conserve

      25      some energy -- maybe this is where we can start







                                                                  187
       1      conserving some energy.

       2             SENATOR MAZIARZ:  I couldn't agree with you

       3      more.  I wish I knew how to turn it off.

       4             Open a window.

       5             SUSAN SHAPIRO, ESQ.:  I know, but, here,

       6      that's an example of a waste of energy, because,

       7      here, it's a nice beautiful day and we're freezing

       8      in this room.

       9             So, maybe New York State should start

      10      thinking about, you know, even its own buildings,

      11      conserving energy in some buildings, and that may be

      12      helping the whole power problem we have in

      13      New York State, if we do actually have a problem.

      14             So, let me just start by saying, it is not

      15      if, but when, Indian Point will close.

      16             It could be by accident.

      17             It could be by age.

      18             It could be natural disaster.  It's located

      19      on two intersecting fault lines.

      20             It could be by terrorist attack.  It's

      21      probably the most attractive terrorist target in the

      22      country.

      23             It could be by financial unsustainability.

      24             And, it also could be by failure of Entergy

      25      to meet state and federal legal requirements.







                                                                  188
       1             They have refused to revise their operations

       2      to meet those requirements.

       3             But, Indian Point will close.

       4             Morgan Stanley recently published a study

       5      which projects Indian Point will close, due to

       6      economics, no later than 2018.

       7             So this contingency plan is a necessity.

       8             We can't wait any longer to figure this out.

       9             We as a state need to think this through in a

      10      thoughtful, planned way:  How are we going to

      11      replace the power of Indian Point?

      12             You know, the first question we really do

      13      have to get to, as Philip and others have said,

      14      there's a big discrepancy of how much energy do they

      15      actually provide for our region?

      16             You, in your invitation, to -- say

      17      25 percent.

      18             That's what Entergy advertises in the Yankees

      19      games, and on the airwaves, of -- they say

      20      25 percent of New York City's energy.

      21             That's impossible, because only 18 percent is

      22      allowed to be imported from out of the city.

      23             So, that fact -- the fact that they advertise

      24      it is legally impossible, to begin with.

      25             And today we just heard from Con Ed, that







                                                                  189
       1      only 10 percent of New York State's -- all of the

       2      state's energy is provided by nuclear.

       3             And you have your plants upstate, so

       4      Indian Point could not be providing 25 percent of

       5      our energy.

       6             So we need to -- as Philip said, they have

       7      not been forthcoming or transparent about how

       8      much -- where they're selling their selling their

       9      energy to.

      10             If they're not selling it to us in

      11      New York State, where they are selling it?

      12             They could be selling it, clearly, to the

      13      open market for the highest price.

      14             Our region has the most expensive energy in

      15      the country, and, Indian Point is not helping reduce

      16      that price.

      17             It's only probably increasing it, but we

      18      don't know, because they've hidden that information.

      19             So I would asked you, respectfully, to

      20      request that, and require them to be transparent, as

      21      they're supposed to be by law, and give you, the

      22      State Senate and Assembly, that data.

      23             They have refused to do that.

      24             As of last Saturday, September 28th,

      25      Indian Point actually stopped providing any energy







                                                                  190
       1      to the New York Power Authority.

       2             So the subway system, the airports, none of

       3      it, no longer runs on Entergy's energy:

       4      Indian Point's energy.

       5             So, once again, we need to know, really, what

       6      are they providing?

       7             And right now, we have an amazing opportunity

       8      here in New York State to create really good-paying,

       9      sustainable jobs, and rebuild our economy, by

      10      creating renewable-energy infrastructure for the

      11      existing -- with existing twenty-first-century

      12      energy technology, and become a model, not only for

      13      the state and the region, but for the whole country,

      14      and the world.

      15             New York can once again have a real economic

      16      motor, by enacting this contingency plan.  By

      17      figuring out how we're going to make other safe,

      18      clean forms of energy, and not rely on this plant

      19      that's, literally, falling apart.

      20             It's -- you know, it's made of 40-year-old

      21      concrete and rebar that has been bombarded by

      22      fission.

      23             It's corroded.  It's cracking.

      24             They don't even know what kinds of piping

      25      they have in that plant.  It's a mixture of all







                                                                  191
       1      different types of piping.

       2             They -- they really -- it's, literally,

       3      falling apart.

       4             I mean, the Tappan Zee Bridge was falling

       5      apart.  It took years, finally -- you know, they're

       6      finally doing something about it.

       7             But these are structures.

       8             These are, you know, industrial structures.

       9      They have a life cycle.

      10             It's outlived its life cycle.

      11             It was only supposed to last for 30 years,

      12      but because of finances, they said, No, make it

      13      40 years.

      14             But, now, we're going into a future period,

      15      where we don't know, nobody knows, nobody can

      16      guarantee, that plant's not going to crack and fall

      17      apart even worse than it already has in the near

      18      future.

      19             So, to protect New York State, and to protect

      20      the people here, we really need to figure out how we

      21      have to secure that plant in a safe way and close it

      22      down, and plan for the future, so that we can really

      23      be safe, you know, for our kids and our grandkids,

      24      and the future of our area.

      25             A recent Stamford University study found that







                                                                  192
       1      it's feasible and affordable to convert

       2      New York State energy infrastructure to wind, water,

       3      sunlight, without nuclear.

       4             There's really no reason that we are going to

       5      rely -- continue to rely in this downstate densely

       6      populated area on this dangerous kind of energy.

       7             In fact, just using the roof tops of

       8      New York City, of the municipalities buildings and

       9      the schools, we could easily, with solar and wind,

      10      we could add a significant amount of distributed

      11      electrical generation, just right here in

      12      New York City alone.

      13             So, instead of throwing good money after bad

      14      by continuing to subsidize this unsustainable

      15      industry that keeps, every year, asking for billions

      16      and billions in handouts, it's time that

      17      New York State make some plans; not contingency

      18      plans, but real plans, to start replacing what

      19      Indian Point produces.

      20             It may generate 2,000 -- it may be able to

      21      generate 2,000 kilowatts, but -- megawatts, I mean,

      22      but, it doesn't -- once it goes on to the

      23      transmission lines, the 1450 is what we're talking

      24      about.

      25             And then today we heard, there's already







                                                                  193
       1      plans for about 500 of that that's already taken

       2      care of in these proposed up and coming plans.

       3             So we're talking about replacing

       4      1,000 megawatts of energy.

       5             This is something that we can make happen,

       6      with some planning, and some forethought.

       7             When -- and I want to talk about jobs for a

       8      second, because I know it's a big concern for all of

       9      us.  You know, it's a very big concern for

      10      everybody.

      11             But you have to remember, that when Entergy

      12      took ownership of Indian Point, there were

      13      3,000 good-paying union jobs at that plant.

      14             Today, there's about 1,000.

      15             They are the one who have cut the jobs.

      16             We lost 2,000 good-paying jobs because of

      17      Entergy.

      18             So, you know, there's a period where, yes,

      19      there's retraining.  We might have to retrain some

      20      people.  And decommissioning, for many years, will

      21      keep the people -- many of the people that are there

      22      still working.

      23             But, there's no reason that we can't invest

      24      in retraining our very talented and very capable

      25      New York State workforce.







                                                                  194
       1             We have -- I live in the Hudson Valley, right

       2      near the plant, and we have empty factories.  We

       3      have highly-skilled workers that are unemployed.

       4             It's time to start bringing the jobs for

       5      manufacturing of solar, geothermal, tidal, all those

       6      components right here, instead of shipping them --

       7      bringing -- letting China make those jobs.

       8             We need to have a workforce, you know, here,

       9      making them.  We're in the right area.

      10             We have the whole New York State down area --

      11      downstate area as the place to use it.

      12             So why don't we make it where we're going to

      13      use it, and give our people really good, sustainable

      14      jobs that will last forever into the future, because

      15      it will be safe, and we can continue this kind of

      16      energy, and growing this kind of energy.

      17             In fact, New York State, as you well know, is

      18      a great agricultural state.

      19             Biofuels:

      20             Why -- there's very little talk even about

      21      biofuels in New York State, but we -- you know,

      22      we're farmland, grasslands.

      23             Let's start using switchgrass and hemps, and

      24      start using that to create our biofuels, and we will

      25      have a much safer form of energy.







                                                                  195
       1             In fact, there was a recent study, done by

       2      the University of Massachusetts, that found, that

       3      for every million dollar invested, only four nuclear

       4      jobs are created;

       5             Whereas, for the same million dollars, you

       6      can create 17 jobs in retrofitting and biomass,

       7      14 jobs in transmission, 13 jobs in solar, wind, and

       8      smart grids.

       9             Retraining energy nuclear workers would be

      10      like -- today, would be like saying, Well, you know,

      11      chimney sweeps; we have to keep those chimney-sweep

      12      jobs, because those are really good jobs at the time

      13      we use coal in everyone's fireplace to make energy.

      14             But we don't have chimney sweeps anymore.

      15      There are other good jobs that they can be created.

      16             Holding on to an old format isn't going to

      17      make a sustainable job.

      18             It will make a job that can only live a

      19      certain lifetime.

      20             Oh, I'm sorry.

      21             So, as Philip said, the Synapse energy

      22      consultants did a study that detailed a road map of

      23      how to get there, by replacing Entergy --

      24      Indian Point with clean energy sources.

      25             And, let's talk about what the risks and the







                                                                  196
       1      costs of continuing to allow Indian Point to

       2      operate.  That's really a big concern that we have,

       3      that should be considered in this contingency plan

       4      as an alternative.

       5             If you keep it operating, what's it really

       6      costing New York State taxpayers?

       7             Not just us in the downstate region, but all

       8      New York taxpayers.

       9             First of all, it's a historic thing that

      10      Indian Point is now the first plant in the country,

      11      and I believe the world, to operate with an expired

      12      license.

      13             You and I can't drive with an expired

      14      license.  Right?

      15             We'd get fined, or we'd get pulled over.

      16      We might even go to jail.

      17             Indian Point is only 25 miles from midtown

      18      Manhattan.

      19             It's on, as I said, two active fault lines.

      20             It has defective fire installation that only

      21      protects for 24 minutes, instead of required 3 hours

      22      by New York State law, and federal law, but it's

      23      allowed to operate with an expired license.

      24             Now, I've heard people talk today about, they

      25      have these commitments; that they've met the







                                                                  197
       1      commitments.

       2             Well, I have it in here, and I've read these

       3      commitments that they're supposed to meet.

       4             First of all, it's about that thick, how many

       5      commitments they're supposed to meet.

       6             And about 50 percent of them, they don't

       7      meet, today.  We're sitting here today with them not

       8      having met those commitment.

       9             In fact, it even says, "The NRC inspectors

      10      aren't sure that the systems Entergy is using, with

      11      regard to thermal-aging embrittlement, will meet the

      12      requirements of federal law."

      13             Yet, the NRC is allowing them -- the NRC and

      14      New York State is allowing them to continue to

      15      operate that plant with an expired license.

      16             That's really endangering 20 million people,

      17      and our entire economy.

      18             It's not -- New York State's economy, and the

      19      entire country's economy.

      20             If something happens at Indian Point, the

      21      bankruptcy of our state, and the country, will

      22      happen shortly after that.

      23             You know, if Indian Point closes -- or,

      24      Indian Point has refused to meet the state and

      25      federal requirements.







                                                                  198
       1             That's their choice not to follow the law.

       2             I'm sure you wouldn't support somebody else

       3      breaking the law.

       4             But, why does this industry get -- why does

       5      Entergy get a pass on following the law?

       6             They have refused, in fact, like, to spend

       7      about $500,000, which is about a quarter of their

       8      day's profit, to retrofit this fire-insulation

       9      problem.

      10             Instead, they've litigated for millions of

      11      dollars.

      12             They're still litigating about it.

      13             Why don't they just fix it?

      14             What -- it -- it doesn't make any sense to

      15      anyone.

      16             Fix the problem.

      17             Every other plant in the country fix their

      18      problem.

      19             Entergy claims, We should be exempted from

      20      fixing our problem; when, between us and a meltdown,

      21      it's 24 minute.

      22             New York City and a meltdown is a 24-minute

      23      fire.

      24             It should be a 3-hour fire rating.

      25             It's their choice not to meet these







                                                                  199
       1      standards.

       2             They claim that the -- we -- the closed-cycle

       3      cooling system that's being required will require

       4      these Yankee Stadium-sized cooling towers.

       5             That's not what the requirement is.

       6             There's a whole different system, a much less

       7      expensive system, they could use, but they don't

       8      want to.

       9             They don't want to spend the money to keep

      10      operating properly.

      11             They're an industry, they're a business.  It

      12      costs money to operate a business to make the profit

      13      they're making.

      14             We should be not ashamed to require them to

      15      live up to their obligations under the law.

      16             So, let's talk about the continued cost of

      17      operations.

      18             Every single day that plant continues to

      19      operate it makes more waste.

      20             And as Philip said, that is the biggest

      21      problem of the nuclear industry -- it's one of

      22      biggest problems of the nuclear industry, is the

      23      waste.

      24             When they took ownership of the plant, there

      25      were 18,000 tons of nuclear waste at that plant.







                                                                  200
       1             Today there's 27,000 tons of it.

       2             It's not going anywhere.

       3             The fact that the gentleman from Entergy

       4      said, Oh, well, it's going to be in dry-cask storage

       5      so the Department of Energy can come and ship it

       6      away.

       7             There is no place to ship it to.

       8             Period.

       9             In fact, tomorrow, there's going to be --

      10      nationally starting, the NRC is starting, their

      11      waste store -- Waste Confidence hearings, because

      12      the bottom line is, Yucca Mountain was not a

      13      political decision, that it was closed, though most

      14      people would like to think, that, Oh, the politics

      15      of Nevada made it close down.

      16             Yucca Mountain closed because of science.

      17             The heat from this nuclear waste, put all in

      18      one place, cannot be contained.

      19             We, scientifically, don't know how to deal

      20      with it.

      21             We don't know how to store it.

      22             100 years, maybe the dry casks that they've

      23      designed now will last.

      24             "Maybe."

      25             They don't know.  We don't know.







                                                                  201
       1             We can't keep making, for the future, this

       2      waste that we don't know how to deal with.

       3             Unlike coal and fossil fuels, which, yes, do

       4      create, you know, a carbon footprint, and all of

       5      that, but it's hot once.

       6             It goes through, it's cold.

       7             It's ash, it's cold.

       8             Nuclear is hot for thousands of years.  It

       9      keeps heating the environment.

      10             No one has calculated how much that heats the

      11      environment, but we know it's super-heating the

      12      Hudson River.

      13             We know that every single day it super-heats

      14      the Hudson River.

      15             That's why there's this need for closed-cycle

      16      cooling, which they have refused to do.

      17             But, let's also talk about what's -- who's

      18      insuring this plant?

      19             Who -- where's the insurance on this plant?

      20             Who is it, really, actually insuring it?

      21             Okay, we did a property-value study, which

      22      you'll see in here, based on assessed actual values,

      23      and actual -- assessed values and actualization

      24      rates.

      25             And the problem -- this is in 2011, the study







                                                                  202
       1      was done.

       2             At that time, the property values in the

       3      50-mile radius of Indian Point is $8.5 trillion.

       4             The insurance coverage, under the

       5      Price-Anderson Act, is only $12 billion.

       6             That means it's only insured for .01 percent.

       7             Because the nuclear -- the -- I'm sorry, the

       8      insurance industry said, Nuclear is too expensive to

       9      insure.  We're not going to touch it.

      10             It's not like flood insurance you can add a

      11      rider on.

      12             You look in your homeowner's policy, look in

      13      any building policy, it's excluded.  There's an

      14      exclusion.

      15             So who's the insurer?

      16             The taxpayer: the New York State taxpayer,

      17      the American taxpayer.

      18             If something happens at Indian Point, your

      19      region, as well as our region, is gonna have to pay

      20      for that.

      21             It's gonna -- that's what bankrupt the

      22      Soviet Union, was Chernobyl.

      23             Because who's going to pay for it?  It's the

      24      taxpayer here.

      25             That was a different system, so I don't want







                                                                  203
       1      to get into that.

       2             But, at this point in time, it's no longer

       3      economically feasible to keep operating a plant

       4      that's broken, that's cracked, that's leaking into

       5      the Hudson River.

       6             The spent-fuel pools, it's acknowledged they

       7      have cracks in them, but they don't even know where

       8      they are.  They haven't found them.

       9             But, it's still leaking, but they're not

      10      doing anything about it.

      11             So we know that there's problems with the

      12      plant.

      13             The fact that they're saying there has been

      14      no leaks?

      15             There's records that there's been leaks.

      16             There's maps, there's been leaks.

      17             You know, you guys can see it.

      18             They can say what they want, but there's

      19      evidence.

      20             The spent-fuel pools are really one of the

      21      larger problems, is because they're so densely

      22      packed, as Philip said.

      23             They're four times more densely packed than

      24      they were designed to be, because they don't know

      25      what to do with the fuel.  You know, the waste, they







                                                                  204
       1      don't know where to go, so they keep just putting it

       2      into these fuel pools.

       3             Now they're starting to take some of it out,

       4      but, like he said, they're not going to reduce the

       5      density.

       6             And that is just an enormous risk to our

       7      entire region.

       8             Let's see.

       9             And, then, we all -- all of us New Yorkers

      10      should be really concerned about who's going to be

      11      left holding the bag to pay for the spent fuel once

      12      Entergy no longer is around.

      13             Entergy is a corporation.  They can dissolve,

      14      they can disappear.

      15             They may not be here later.

      16             Listen, after "Katrina," there was Entergy

      17      and "Katrina."  They left New Orleans with a big

      18      bill.

      19             They tried to hide behind the corporate veil.

      20             And they did, they succeeded.

      21             They'll do that here too.

      22             Once they walk away, they've made their

      23      profit, there's no guarantee, that who's going to be

      24      paying for the waste and the cleanup?

      25             Their decommissioning fund, the GAO found







                                                                  205
       1      that their decommissioning fund is short.

       2             They were allowed them to -- the NRC allowed

       3      them to actually use it on the stock market in 2008.

       4             They lost a lot of money on it.

       5             They are trying to recoup that, but they're

       6      not there yet.

       7             And prior to that, they weren't even keeping

       8      up with the cost-of-living increases.  There were

       9      only doing 1 percent per year, rather than 3 percent

      10      like everyone else.

      11             So their fund, their decommissioning fund,

      12      isn't even adequate.

      13             So at the end of the day, who's gonna be

      14      paying for this?

      15             New York State taxpayers.

      16             You know, yet, we need to have a plan to

      17      close Indian Point down in a way that we make sure

      18      have reliable energy for our region, because we

      19      don't want to be stuck with paying for the cost and

      20      also not having proper energy.

      21             So this is the time to do it.

      22             I mean, we have an example of, during the

      23      "Sandy" hurricane, storm -- "superstorm," I guess

      24      we're calling it, and everywhere in our region had

      25      flashlights and candles, because we all knew that







                                                                  206
       1      the power was going to go out.  We all knew the

       2      power was going to down, because the trees were

       3      falling and the wind was so strong.

       4             Entergy continued to operate that plant, even

       5      though Mayor Bloomberg had shut down the

       6      transportation system in New York City.

       7             All of the transportation systems in that

       8      region, in the Westchester and the counties, was

       9      shut down hours before "Sandy" actually hit.

      10             Once those -- once that was shut down, there

      11      was no evacuation plan.

      12             Transportation -- public transportation is an

      13      essential part of any evacuation plan, but they

      14      allowed that plant to continue to operate, until

      15      there was an emergency scram in the middle of the

      16      night, at 10:20 at night, in the middle of the

      17      storm.

      18             If -- it's the most dangerous way to shut

      19      down a plant, is in an emergency scram, instead of

      20      in an orderly fashion.

      21             And if -- if something had gone wrong, nobody

      22      could have gotten anywhere.

      23             All the trees were down.

      24             People in this area didn't even use that

      25      power.







                                                                  207
       1             That's why we have to find out, where are

       2      they selling?

       3             Because, we weren't using that power.

       4             We didn't have power for two weeks.

       5             Most of the area didn't have power for

       6      two weeks.

       7             Where were they selling that power?

       8             Why were they putting us at risk, instead of

       9      doing something orderly and planned?

      10             And that's what we're asking for, with this

      11      contingency plan, is let's have an orderly planned

      12      method, so that we protect our region, and make sure

      13      that we have the proper jobs.

      14             Just a couple of more minor things -- not

      15      minor, but it's a couple more things.

      16             In terms of emergency preparedness, it turns

      17      out that Entergy doesn't actually cover all the

      18      costs for our region to prepare for an emergency

      19      because of them.

      20             They only cover a very small portion of it.

      21             It's mostly covered by the taxpayers, the

      22      ratepayers, right here.

      23             And it should be, they're here, they're

      24      making profit off of us.  They should be responsible

      25      for their own protection.







                                                                  208
       1             Our emergency-service guys are not fully

       2      funded through Entergy to protect against them.

       3             And I wonder, in your region, actually,

       4      because I know in our region it doesn't happen, but,

       5      is potassium iodide handed out to everyone in the

       6      10-mile radius?

       7             Because in our region, it's, by law, it

       8      should be.

       9             It's federal law, it should be.

      10             And they don't do it, because Entergy refuses

      11      to let our emergency-service guys to hand it out.

      12             They want to send it out to all of the

      13      residents in the region, and Entergy said no.

      14             So right now, if there is an accident, we

      15      aren't actually even protected to that real level,

      16      just for thyroid cancer.

      17             That's all that would cover, but it would be

      18      something.

      19             But they won't let it happen because they

      20      think it's bad PR.

      21             So, they're not following that minor federal

      22      law.  Even that.

      23             And maybe New York State, you and the Senate,

      24      can make that happen.

      25             It's a very minor thing to do.







                                                                  209
       1             And, now, talking about health, and the

       2      concerns that you have about air quality, which we

       3      all share.

       4             We all share concerns about our health and

       5      our children's health, and asthma and air quality

       6      and sickness.

       7             Well, turns out that, every day, Indian Point

       8      releases a minimum of 60 pounds of radioactive waste

       9      into our air and into our water, as steam, or in --

      10      directly into the water.

      11             Even if it goes into the water, it

      12      evaporates, it ends up in air.

      13             We're breathing that in.  That's going into

      14      our thyroids.

      15             The thyroid-cancer rates in our region are so

      16      much higher that the rest of the nation, based on

      17      the Cancer Registry studies.

      18             The reports are in here, the studies are in

      19      here.

      20             So, you know, we know that we're getting sick

      21      from Indian Point.

      22             We know that people have thyroid cancer,

      23      infants are being born with hypothyroidism, in our

      24      region.

      25             This is directly related to Indian Point.







                                                                  210
       1             Thyroid cancer is the marker from exposure to

       2      radiation.

       3             You don't get it from anything else.  It's

       4      not hereditary.

       5             If you go onto the Thyroid Cancer Register --

       6      Society, they'll explain that as well.

       7             So, you know, the problem we actually have,

       8      and this is something you guys can do, the

       9      State Senate and the State Assembly really should be

      10      requesting, and I respectfully ask you, to enact

      11      this, or enact legislation towards this, is that

      12      Entergy, actually, is the only ones who are

      13      monitoring themselves.

      14             There's no independent self-monitoring of the

      15      radiation releases.

      16             So, by regulation, they're allowed to release

      17      60 pounds, but, based on what we've seen from

      18      studies that were prior, it looks like, maybe,

      19      they're releasing around 90 pounds a day.

      20             It could be more.

      21             We don't know.

      22             The monitoring is very sporadic.  It's only

      23      three or four times a year.  We -- and it's done by

      24      Entergy themselves.

      25             It's clearly the fox watching the hen house.







                                                                  211
       1             So we're asking to have funding -- Entergy

       2      pay funding for independent monitoring by the

       3      New York State Department of Health, that we have

       4      continuous monitoring of the radiation that's coming

       5      out of the plant.

       6             Because we can't talk about the impacts on

       7      health and the air unless we actually know what's

       8      actually coming out of that plant.

       9             And the other part of it, is that

      10      New York State Department of Health should be

      11      required to do captured-species studies around that

      12      plant, because, taking a one-day test, a -- mon- --

      13      you know, "Oh, here, what I see today," doesn't

      14      really mean anything, because radiation impacts are

      15      cumulative.

      16             It doesn't -- they're bio -- they

      17      bio-accumulate.

      18             So we need the fish, the frogs, the birds,

      19      all of the oysters...all the creatures around that

      20      live there, and we need to capture them for at least

      21      a year to see, actually, what is being released into

      22      our environment.

      23             We don't know that.

      24             You should do that at your plant, too, so you

      25      can protect your people -- at your plants, I should







                                                                  212
       1      say.

       2             You know, there's, really -- the lack of

       3      knowledge is -- of what's going on at that plant, is

       4      one of the reason that it's no longer safe, and we

       5      do need a contingency plan -- or, actually, I don't

       6      even think it should be contingency plan.

       7             It should be an enacted plan.

       8             We need to be in the position, where,

       9      Indian Point could go down at any minute for a

      10      variety of reasons, and if we don't have a backup

      11      plan for our energy, that will be a problem.

      12             So there is -- it's not wasted money to plan

      13      ahead.

      14             It's good money spent, to know how we're

      15      going to go into a healthy future with our energy in

      16      New York State.

      17             And I really hope that, you know, there isn't

      18      undue influence due to large contributions that are

      19      made by Entergy to our political people, you know,

      20      that really influence you, this Committee, or any

      21      other committee, because that should not be allowed

      22      to affect the health of New York State, both

      23      energy-wise, jobs-wise, and health-wise.

      24             So I really thank you for, you know, this

      25      opportunity.







                                                                  213
       1             SENATOR MAZIARZ:  Thank you very much, Susan.

       2                  [Applause.]

       3             SUSAN SHAPIRO, ESQ.:  We appreciate it.

       4             We, and, obviously, several people in

       5      audience appreciate your comments.

       6             Senator Ritchie.

       7             SENATOR RITCHIE:  I guess, could you just

       8      tell me, I'm assuming from your presentation, then

       9      you personally are opposed to nuclear facilities

      10      across the country?

      11             SUSAN SHAPIRO, ESQ.:  You know what?  I will

      12      say something.

      13             I wouldn't be opposed to nuclear if we knew

      14      what to do with the waste, but there is no -- there

      15      is no solution to deal with the waste.

      16             There's no way to reverse-engineer it.

      17             There's no place to store it.

      18             The cost of storage we haven't even talked

      19      about.

      20             You know, the cost of keeping this waste, on

      21      New York State, is enormous.

      22             It's an enormous expense in perpetuity.

      23             So if -- I can't -- I'm not against any form

      24      of energy if you know how to make it safe, and you

      25      can deal with the waste.







                                                                  214
       1             But we can't.

       2             SENATOR RITCHIE:  And I don't know the

       3      history of your organization, so, can you tell me,

       4      was your organization in place when NYPA owned the

       5      facility?

       6             Or, how did your organization come about?

       7             SUSAN SHAPIRO, ESQ.:  The organization -- the

       8      Radiation Public Health Project is the organization

       9      that, President Kennedy used their studies to stop

      10      the aboveground nuclear testing, because we're an

      11      epidemiological organization that takes data and

      12      analyzes the data.

      13             And that original data was -- was

      14      strontium-90 and baby teeth.

      15             And they found that the high -- the

      16      super-high levels of strontium-90 in baby teeth was

      17      caused by aboveground testing.

      18             So President Kennedy stopped the aboveground

      19      testing because of the work that this organization

      20      did.

      21             So, it's a very old organization.

      22             SENATOR RITCHIE:  But were you -- you --

      23      because I'm just trying to get the history here of

      24      the fact that, NYPA actually owned the facility

      25      before Entergy purchased it.







                                                                  215
       1             Were you actively involved at that time --

       2             SUSAN SHAPIRO, ESQ.:  Yeah, we were doing --

       3             SENATOR RITCHIE:  -- trying to shut the plant

       4      down then?

       5             SUSAN SHAPIRO, ESQ.:  -- I wouldn't say we

       6      were trying -- I represent a few different

       7      organizations, so Radiation Public Health is not

       8      about shutting plants down.

       9             They do studies.  They do epidemiological

      10      studies.

      11             They're not about shutting plants down.

      12             They do health studies.

      13             So that's -- that organization --

      14      Indian Point Safe Energy Coalition is made up of

      15      70 environmental groups.

      16             And one, for example, WestCan was very

      17      involved in those hearings, and -- at that time, and

      18      their biggest concern was the lack of

      19      decommissioning funds at that time.

      20             And they were told, Oh, you can't raise it

      21      then.  It's the wrong time to raise it.

      22             Well, now is the right time to raise it.

      23             We need to talk about the decommissioning

      24      funds, and are they adequate?

      25             And will New York State taxpayers be the ones







                                                                  216
       1      holding the bag on the decommissioning?

       2             Because Entergy bought the plant to take the

       3      decommissioning funds out.

       4             It was an asset that they were looking at,

       5      and they did use that money.

       6             So, we need to -- New York State, you guys

       7      really have to look and see, where are we on this

       8      decommissioning?

       9             Because at the end of the day, it's going be

      10      all of us -- all of us in New York State -- who's

      11      going to have to pay for that.

      12             And that's a big expense.

      13             And I don't think that your taxpayers are --

      14      end even in your region are going to be happy about

      15      that they're going to have to pay for

      16      decommissioning for Indian Point, because Entergy

      17      didn't, because they left the state.

      18             They're an out-of-state corporation.

      19             It's a single corporation that you're trying

      20      to protect, if you are trying to protect it.

      21             I hope that's not the intent of these

      22      hearings.

      23             I believe these hearings, the intent should

      24      really be about replacement energy, is it needed?

      25             It is, there's no question.







                                                                  217
       1             Even if Indian Point, even if you say, you

       2      know, "Okay, they're going to get their

       3      relicensing," in 20 years it's going to be needed.

       4             You need to start planning it today.

       5             Every -- you know, there's no reason not to

       6      plan ahead, and do it right.

       7             The longer you plan, the better you'll do.

       8             The better -- the less it will cost.

       9             The better we'll have a plan.

      10             And that's really what this should be about,

      11      is let's plan ahead.

      12             There's no reason to not plan.

      13             You know, it's like putting blinders on and

      14      saying, Oh, I don't want to think about that.

      15             But, it is the future, we have to think about

      16      it.

      17             And there's so many possibilities of why

      18      Entergy Indian Point will close, sooner than later

      19      that, we have to look it a realistically, you know.

      20             And the other organizations, I have to say,

      21      that I represent, the Sierra Club Atlantic Chapter

      22      has been involved for a very long time on this

      23      particular issue.

      24             They are not an anti-nuclear group.

      25             They're an environmental group that cares







                                                                  218
       1      about the protection of the environment.

       2             SENATOR MAZIARZ:  Thank you.

       3             SUSAN SHAPIRO, ESQ.:  Thank you.

       4             SENATOR MAZIARZ:  Thank you very much.

       5             Thank you.

       6             Thank you.

       7             That's the termination of our hearing.

       8             Thank you.

       9                  (Whereupon, at approximately 2:01 p.m.,

      10        the public hearing held before the New York State

      11        Senate Standing Committee on Energy and

      12        Telecommunications concluded, and adjourned.)

      13                            ---oOo---

      14

      15

      16

      17

      18

      19

      20

      21

      22

      23

      24

      25