Public Hearing - September 30, 2013
1 BEFORE THE NEW YORK STATE SENATE
STANDING COMMITTEE ON ENERGY AND TELECOMMUNICATIONS
2 ------------------------------------------------------
3 PUBLIC HEARING:
4 TO EXAMINE AND ANALYZE THE PLANS, CONTENTIONS, AND
ARGUMENTS PUT FORWARD IN RELATION TO THE INDIAN POINT
5 CONTINGENCY PROCEEDING BEING CONDUCTED BY THE
NEW YORK STATE PUBLIC SERVICE COMMISSION
6
------------------------------------------------------
7
8
Senate Majority Office
9 250 Broadway - 19th Floor
New York, NY 10007-2375
10
September 30, 2013
11 10:00 a.m. to 3:00 p.m.
12
13
PRESIDING:
14
Senator George D. Maziarz
15 Chair
16
17 SENATE MEMBERS PRESENT:
18 Senator David Carlucci
19 Senator Patricia Ritchie
20
21
22
23
24
25
2
1
SPEAKERS PAGE QUESTIONS
2
Rajendra Addepalli 8 24
3 Deputy Director - Office of Electric,
Gas & Water
4 NYS Department of Public Services
5 Gil Quinones 8 24
President and CEO
6 New York Power Authority (NYPA)
7 Stuart Nachmias 36 45
Vice President of Energy Policy
8 Con Edison
9 T. Michael Twomey 59 70
Vice President of External Affairs
10 Entergy Wholesale Commodities
11 Thomas Rumsey 90 93
Vice President of External Affairs
12 New York Independent Service Operator
13 Gavin Donahue 97 104
President & CEO
14 Independent Power Producers of NY, Inc.
15 Paul Haering 106 113
Vice President of Engineering and
16 System Operations
Central Hudson Gas & Electric
17
James Slevin 116 124
18 Vice President
Dominic Marzullo
19 Business Agent for Local 1-2
James Spry
20 An Executive Board Member for Local 1-2,
and, Indian Point Employee
21 Utility Workers Union of America
22 Darren Suarez 132 140
Director of Government Affairs
23 The Business Council
24
25
3
1
SPEAKERS (Continued): PAGE QUESTIONS
2
Arthur "Jerry" Kramer 141
3 Chairman
New York Affordable, Reliable
4 Electricity Alliance
5 John Ravitz 150 155
Executive Vice President & COO
6 The Business Council of
Westchester County
7
Phillip Musegaas 155 174
8 Hudson River Program Director
Riverkeeper
9
Susan Shapiro 185 213
10 Attorney
Radiation & Public Health Project
11
12
13 ---oOo---
14
15
16
17
18
19
20
21
22
23
24
25
4
1 SENATOR MAZIARZ: Good morning, everyone.
2 If I could call this hearing to order,
3 I, first of all, want to state for the record that
4 today is Monday, September the 30th, at
5 approximately 10:15 p.m. [sic].
6 We are starting a meeting of the
7 Senate Energy Committee, a public hearing on the
8 Indian Point contingency plan.
9 For all those who are present, I want to
10 thank you all for your attendance.
11 Apologize probably for the long line -- long,
12 hot line that you had to wait in to get through
13 security to get into this building.
14 I appreciate your patience, as do my
15 colleagues.
16 I'm joined today by Senator Patricia Ritchie
17 from the North Country.
18 I do want to say, just again for the record,
19 that we have had responses of members of the Senate
20 and this Committee who will attend.
21 Those of you who are familiar with these
22 hearings know that members do come and go based on
23 their own time considerations.
24 I certainly appreciate all of their
25 attention.
5
1 We will be joined shortly by
2 Senator David Carlucci; Senator Eric Adams, who is,
3 I think, soon to be Brooklyn Borough President
4 Eric Adams; Senator Felder, and Senator Dilan, have
5 all RSVP'd that They will come for at least a part
6 of this hearing.
7 We are here today to examine and analyze the
8 proceeding currently before the Public Service
9 Commission to examine contingencies in the event,
10 "in the event," of the closure of Indian Point
11 Energy Center.
12 There are currently proceedings before, not
13 just the Public Service Commission, also before the
14 Department of Environmental Conservation, and also
15 before the federal Energy Regulatory Commission.
16 Of most concern to this Committee is:
17 The contingency plan, how much that would
18 cost.
19 It's been estimated to cost almost, "almost,"
20 $1 billion to close Indian Point;
21 Where the power would come from to replace
22 the current power that is produced by Indian Point;
23 And where the revenue would be derived from
24 to pay for those costs.
25 And I can tell you, myself, and speaking on
6
1 behalf of the members, at least the upstate members,
2 Senator Ritchie and myself of this Committee, and
3 the other upstate members of the Senate, we
4 certainly do not want to see those costs, that
5 burden -- that financial burden, placed upon
6 businesses and residents outside of the Indian Point
7 service area, and most particularly, those in
8 Upstate New York.
9 I have personally visited the Indian Point
10 facility.
11 I have seen how safe that particular facility
12 is, both from the standpoint of natural disasters,
13 and manmade disasters, terrorist attacks, and so
14 forth.
15 As I said, we are most concerned, "most
16 concerned," with maintaining a clean, positive
17 operating facility, and what should happen if these
18 various agencies determine that something other than
19 what's currently being done would replace
20 Indian Point nuclear plant.
21 So with that, I do want to thank my colleague
22 Senator Ritchie.
23 She traveled a great distance to be here
24 today.
25 She has been an extremely good partner on the
7
1 Energy Committee in going forth.
2 And, certainly, I've heard from her, in my
3 opinion, almost far too often, about protecting --
4 protecting the area of the state that she represents
5 from any increased costs in energy facilities.
6 Senator Ritchie, would you like to -- care to
7 make any opening statement before we go to our first
8 witnesses?
9 SENATOR RITCHIE: Sure.
10 I would just like to thank Senator Maziarz
11 for calling this hearing on Indian Point.
12 This issue is extremely important to me, as
13 I represent the district that Nine Mile 1 and 2 in
14 Fitzpatrick are located.
15 They generate a third of the electricity
16 upstate.
17 They actually -- they actually have over a
18 thousand employees, and are very important, not only
19 to the rate that people pay in New York State, but
20 also important to the economy of my district.
21 So, I look forward to hearing the comments
22 today, and appreciate the opportunity to ask some
23 critically important questions I think that may not,
24 at this point, address some of the issues that may
25 come later with regard to the other three nuclear
8
1 plants that are in my district.
2 SENATOR MAZIARZ: Thank you very much,
3 Senator.
4 Our first witnesses, and we appreciate very
5 much them taking the time to be here today:
6 Is Gil Quinones, the president and CEO of the
7 New York State Power Authority.
8 Thank you very much, Gil;
9 And, also, Rajendra Addepalli, the deputy
10 director of the Office of Electric, Gas & Water for
11 the New York State Department of Public Service.
12 They're going to be testifying together.
13 I assume, Mr. Quinones, you're going to go
14 first.
15 Thank you very much, Rajendra, for being
16 here.
17 Oh, I'm sorry.
18 GIL QUINONES: It's actually the opposite.
19 SENATOR MAZIARZ: The opposite, okay.
20 I'm shocked that the --
21 GIL QUINONES: I yield my time to him.
22 SENATOR MAZIARZ: -- NYPA would not go first.
23 [Laughter.]
24 RAJENDRA ADDEPALLI: Good morning.
25 Good morning, Senator Maziarz and
9
1 Senator Ritchie.
2 Thank you for giving us the opportunity to
3 come and discuss these issues with you this morning.
4 What I will do in my testimony is answer a
5 few questions, some of which that you have raised
6 this morning:
7 Why are we doing this contingency plan?
8 What is in this plan?
9 And, what is the cost of this plan?
10 And, who's going to pay for it?
11 And, how does it comport with the competitive
12 wholesale markets that are in place?
13 So, starting with, "Why do this plan,
14 contingency plan?" numerous entities have done
15 reliability analysis in the state, including the
16 New York ISO and the City of New York, Con Edison,
17 and others.
18 And as part of the analysis, they examined
19 what the reliability ramifications would be if
20 Indian Point were not available post 2015 December.
21 And they've all identified that, in summer
22 2016, there will be reliability violations, and, so,
23 there's a need to address that concern.
24 And so how do we, address in, general
25 retirements of plants in New York State?
10
1 Over the last number of years, numerous
2 plants have retired, thousands of megawatts.
3 We do have at the commission a policy
4 statement for retirement of generation units.
5 The policy statement asked the generators,
6 about 80 megawatts, to file their notice six months
7 in advance if the plant were to retire or mothball.
8 And once a notice is filed, the commission
9 conducts an analysis of the ramifications of the
10 plant shutdown, working with the New York
11 Independent System Operator and with the host
12 utility (local utility).
13 If there are no reliability issues, the
14 plants are allowed to shut down.
15 But if there are reliability concerns, they
16 need to be addressed, either by the utilities
17 through their solutions, such as transmission
18 upgrades, but sometimes they may take time, in which
19 case the generator may be asked to stay open through
20 a commercial arrangement.
21 The most recent examples -- many -- in the
22 last number of years, many units have been allowed
23 to retire because there were no reliability
24 concerns.
25 But in two cases recently, there were
11
1 concerns, and the utilities said they would need
2 time to build their transmission solutions, and the
3 generators were asked to stay open through a
4 commercial arrangement; namely, for the Dunkirk unit
5 and for the Cayuga unit.
6 So, in this case, though, if the unit is not
7 available post 2015 December, and we only get a
8 six-month notice, or even a year notice, it's very
9 difficult to replace the magnitude of the resources
10 that we are talking about.
11 There is a lead time needed to replace
12 through either generation or transmission or demand
13 reduction.
14 We have less than three years to go; and, so,
15 the commission has an obligation to ensure the
16 reliability is maintained, that the lights stay on.
17 So it's efficient and effective to have a
18 plan in place to ensure that the lights stay on.
19 So, in that context, the commission asked
20 Con Edison, the primary downstate utility that would
21 be affected, to work with the Power Authority, and
22 other parties, like, the Department of Public
23 Service staff, to come up with a reliability
24 contingency plan, and Con Edison and NYPA filed one
25 in February 2013.
12
1 So what does the plan consist of?
2 The plan -- the reliability contingency plan
3 had three prongs of solutions to address the
4 reliability needs.
5 The first prong is the proposed certain
6 transition projects between Con Edison and the
7 Power Authority, and one element of New York State
8 Electric and Gas.
9 These transmission solutions could be put in
10 place by 2016 summer, and would address part of the
11 reliability need.
12 The second prong was to put in certain
13 demand-reduction measures that would also help
14 reduce need, or alleviate the concerns.
15 The third prong, even after doing these two,
16 we need more resources to fill the gap, so, they
17 proposed issuing an RFP (request for proposals) to
18 get additional incremental new generation or
19 transmission solutions.
20 And they asked the commission to approve this
21 plan.
22 And the commission, so far, has taken the
23 following steps:
24 One, allowed the utilities to move forward
25 with these three transmission projects, subject to
13
1 halting and other conditions, given the lead time
2 that is needed to implement the plans;
3 Second, it allowed the RFP to move forward;
4 to be issued, and get responses;
5 And, third, it asked Con Edison to work with
6 the NYSERDA and improve the demand-reduction plan.
7 So what is in front of the commission right
8 now is these multitude of solutions that would help
9 address the reliability need: certain transmission
10 projects proposed by the utilities, certain demand
11 reductions proposed by the utilities, and the
12 responses to the RFP.
13 The commission asked the department staff to
14 review the RFP responses, because Con Edison and
15 NYPA are also in the play with their transmission
16 projects, for unbiasedness.
17 The department staff has been reviewing these
18 proposals, and is expected to find out which is the
19 optimal portfolio solutions that would meet the
20 reliability needs, keeping the costs low to
21 consumers, and addressing the risks that are
22 entailed in selecting these projects.
23 So that's the, in essence, contingency plan.
24 And in terms of what does it cost, clearly,
25 each of these solutions would lead to certain
14
1 investments up front that would be made, whether
2 it's transmission or demand reduction or a
3 generation solution.
4 In addition to satisfying the reliability
5 need, what these solutions would also provide are
6 benefits to consumers; economic benefits to
7 consumers, in terms of reduced energy prices and
8 reduced capacity prices.
9 So one has to look at, what is the net cost
10 to ratepayers of this portfolio of solutions?
11 Again, our interest is to minimize the cost
12 to ratepayers, and, to reduce the risks associated
13 with them.
14 And, so, the first order of business for us
15 would be to analyze, What if Indian Point stayed
16 open, would these solutions still cost ratepayers
17 money?
18 But, if the benefits exceed costs, even if
19 Indian Point stayed open, then it would be in the
20 interests of the ratepayers to pursue such solutions
21 that make sense, that not only provide reliability
22 benefits, but provide economic benefits.
23 So that analysis is underway in terms of
24 selecting the optimal portfolio that would
25 reduce/minimize costs, maximize benefits, and reduce
15
1 risks.
2 In terms of, "How would the costs be
3 allocated?" the commission asked the department
4 staff to come up with a straw proposal to address
5 how to allocate the costs.
6 The staff star proposal essentially
7 articulated a so-called "beneficiaries pay
8 approach," which means, those who would benefit from
9 these projects should pay for them.
10 And the benefits were focused on reliability
11 benefits: who would otherwise be affected, in terms
12 of reliability, through these projects?
13 They are the ones benefiting from a
14 reliability perspective, so they should pay for
15 these projects.
16 It's called a "reliability-based
17 beneficiaries approach."
18 So that's the straw proposal.
19 And, we conducted two technical conferences.
20 We received numerous comments.
21 There are other entities that have proposed
22 other approaches, such as, the beneficiaries should
23 be thought of more broadly.
24 If there are other benefits beyond pure
25 reliability benefits, they should be accounted for
16
1 in the cost-allocation approach.
2 So those comments are also being examined.
3 And, the commission would deal with this
4 issue, along with the selection of the optimal
5 portfolios, as to how the costs should be allocated.
6 And some of the parties have suggested
7 different approaches for different elements of this
8 plan.
9 For example:
10 Certain demand-reduction measures, costs
11 should be allocated this way; for certain
12 generation, it should be done a little bit
13 differently; and, for transmission, yet differently.
14 So, they're all being analyzed by us at this
15 point.
16 And the next question that comes up is,
17 Why -- or, how does this comport with the existing
18 marketplace?
19 And as I said before, if there is certainty
20 and there is adequate lead time, it's more than
21 likely the market would address the needs.
22 We would not have to intervene in any
23 fashion.
24 But given the unique circumstance here, there
25 is uncertainty, and, given our obligation to keep
17
1 the lights on, we have to do this contingency plan.
2 So what we did to comport with the
3 marketplace, the first instance of asking for a full
4 replacement of the power, this is over
5 2,000 megawatts of a power plant, the reliability
6 plan that the commission sought is looking at a bare
7 minimum needed for reliability purposes, just around
8 1450 megawatts.
9 So, you're not trying to replace the full
10 amount, but just to meet the -- enough needed for
11 reliability purposes.
12 Second, the RFP that the Power Authority
13 issued, many elements in the RFP, especially dealing
14 with the generation, comport with market-price
15 signals of how efficiently they should be
16 dispatched.
17 And, third, many of the -- there are
18 provisions in the RFP to halt the project.
19 Should the commission find new information in
20 the coming months and years that suggests that there
21 is no need for this project, it could be halted if
22 it makes sense.
23 So, in these terms, it is trying to be as
24 responsive to the needs.
25 So, in conclusion, it is appropriate, and it
18
1 is necessary, for the commission to address this
2 contingency plan, to meet the reliability needs to
3 keep the lights on.
4 And, we are not taking a position as to
5 whether Indian Point should be open or should shut
6 down.
7 That's not our view.
8 Our view is purely focused on keeping the
9 lights on.
10 And, what are the next steps?
11 We intend to recommend to the commission, in
12 the very near future, the optimal set of solutions
13 that would help address the reliability need,
14 minimizing net cost to ratepayers, reducing the
15 risk, and also deal with the cost-allocation
16 recommendation.
17 That concludes my remarks, and Mr. Quinones
18 will provide his.
19 SENATOR MAZIARZ: Thank you.
20 GIL QUINONES: Thank you very much.
21 Good morning, Senator Maziarz.
22 Good morning, Senator Ritchie.
23 Good to be with you here in southeast
24 New York.
25 As you know, we meet a lot upstate in your
19
1 areas.
2 My name is Gil Quinones.
3 I am the president and chief executive
4 officer of the New York Power Authority.
5 Thank you for the opportunity to testify
6 today regarding the nature and importance of
7 generator-reliability contingency plans.
8 As I will discuss in more detail, contingency
9 plans allow for advanced measures to prepare for
10 large power-plant retirements, such as the potential
11 closures of the Indian Point Energy Center in
12 Westchester County or the Dunkirk and Cayuga coal
13 facilities in Western New York.
14 Given the uncertainties surrounding the
15 continued operation of such facilities, and in light
16 of their size, impact on transmission flows, and
17 proximity to load centers, such preparations are
18 critical to the continued resilience and reliability
19 of this state's interconnected electric system.
20 In 2012, Governor Cuomo proposed an
21 Innovative Energy Highway Initiative to upgrade and
22 modernize the state's power system.
23 I was privileged to serve as a co-chair of a
24 task force that the Governor named to oversee
25 development of a series of recommendations to bring
20
1 this far-reaching proposal to fruition.
2 One of our most significant recommendations
3 called for the development and implementation of
4 reliability contingency plans, to prepare for
5 potential large power-plant retirements.
6 The task force recognized that recent and
7 pending environmental regulations, coupled with low
8 demand growth and low natural gas prices, could lead
9 to accelerated retirements of older facilities in
10 the state, creating uncertainty for the power
11 supply.
12 The recommended action addressed a critical
13 aspect of this problem.
14 By virtue of plant size, location, or issues
15 regarding the timing of potential retirements, the
16 electricity market may not be in a position to
17 respond adequately to the shutdown of certain power
18 plants once retirement is announced.
19 This is the potential case with Indian Point,
20 a nuclear power plant of approximately
21 2,000 megawatts located in the village of Buchanan,
22 about 30 miles north of the state's major load
23 center in New York City and owned by subsidiaries of
24 Entergy Corporation.
25 As I have indicated, the need to address
21
1 actual or potential power-plant retirements goes
2 well beyond Indian Point.
3 In fact, the New York Independent System
4 Operator recently reported that the owners of 19 of
5 the state's generating facilities, representing
6 almost 1700 megawatts of capacity, have either
7 retired them during the past 17 months or served
8 notice of their intent to do so in 2013.
9 Just over a month ago, Entergy itself
10 announced that it intends to close its 635-megawatt
11 Vermont Yankee nuclear plant by the end of next
12 year, essentially, giving the ISO-New England region
13 only a one-year lead time to prepare for their
14 retirement.
15 Nationwide, the retirements of five nuclear
16 reactors have been announced within the past year.
17 This is an industry trend that we cannot
18 ignore.
19 The Indian Point situation is exacerbated by
20 the plant's importance to the New York City load
21 center, and by the fact that the federal license for
22 one of the two units expired two days ago, and the
23 other is scheduled to expire in December 2015.
24 Although Nuclear Regulatory Commission
25 regulations allow continued operations until the
22
1 license-renewal process is complete, significant
2 uncertainty persists regarding whether Entergy will
3 be able to obtain all the permits and approvals
4 required to keep both units operating for an
5 extended period beyond the expiration of their
6 licenses.
7 Thus, in adopting the Energy Highway Task
8 Force's recommendation, the Public Service
9 Commission, in a November 30, 2012, order commenced
10 a proceeding specifically to solicit a reliability
11 contingency plan for Indian Point.
12 As you have heard from Mr. Addepalli,
13 Con Edison and NYPA developed a contingency plan for
14 Indian Point, and filed it with the commission
15 earlier this year.
16 The plan identified 1,450 megawatts of
17 reliability deficiencies that would occur in the
18 event Indian Point shuts down.
19 Part of the plan called for NYPA to issue a
20 request for proposals to solicit a target
21 1,350 megawatts in generation and transmission
22 proposals from private developers, which we did on
23 April 3rd.
24 As Mr. Addepalli indicated, DPS
25 (Department of Public Service) staff is now
23
1 evaluating responses to the RFP.
2 I would now like to address two issues that
3 have been raised in public statements related to
4 this hearing.
5 First, contrary to what has been alleged, no
6 Power Authority revenue from any source, including
7 the Niagara Power Project or the St. Lawrence FDR
8 project, will be used to subsidize projects arising
9 from the RFP.
10 Second, NYPA has no role in determining
11 whether Indian Point will be retired.
12 Our involvement in the RFP and
13 contingency-planning process is intended only to
14 prepare for a possible shutdown.
15 The Power Authority, in fact, is unable to
16 predict whether or when the Indian Point Energy
17 Center will be retired; yet, it is that very
18 uncertainty surrounding Indian Point's relicensing
19 and permitting issues that makes it critically
20 important to plan ahead to prevent the significant
21 adverse impacts on the state's electric system that
22 will occur if suitable replacement power is needed,
23 and unavailable.
24 The Indian Point contingency plan is a
25 prudent and essential insurance policy for the
24
1 state's citizens.
2 It will provide us with the best possible
3 combination of reliable, economical, and
4 environmentally compatible power sources.
5 In contrast, the failure to act now in timely
6 fashion would represent a striking abdication of the
7 state's responsibilities and would violate the most
8 basics standards of effective public policy.
9 This concludes my prepared remarks, and
10 Mr. Addepalli and I will be pleased to take your
11 questions.
12 SENATOR MAZIARZ: Thank you very much,
13 Mr. Addepalli and Mr. Quinones.
14 We appreciate, again, you being here today.
15 And I believe we are going to just put some
16 graphics up here.
17 But, before we do that, let's --
18 Oh, okay.
19 Gil, this document is from NYPA's Prosperous
20 Conference that was held in relation to replacement
21 generation under the Indian Point contingency plan.
22 This meeting was held on April the 12th of
23 this year.
24 You certainly recognize this document, don't
25 you?
25
1 GIL QUINONES: Yes.
2 SENATOR MAZIARZ: Could you just explain this
3 document, and, you know, what it means, for the
4 benefit of our Committee.
5 GIL QUINONES: Well, the -- what this is, is
6 an illustration of how the capacity markets work.
7 The bottom line, And I think, you know,
8 rather than going through the details on the
9 three bullets above, I think what you're interested
10 in is that last bullet, that "the seller does not
11 bear mitigation risk."
12 SENATOR MAZIARZ: Exactly.
13 Because when you just testified was, it's not
14 going to cost NYPA -- it's not going cost NYPA's
15 ratepayers any money.
16 And, you know, this doesn't seem to agree
17 with that statement.
18 GIL QUINONES: Well, let's -- first of all,
19 I think we need to rewind.
20 I don't want to prejudge what the commission
21 will select in terms of the optimum portfolio.
22 We don't know, at this point in time, whether
23 the recommendation of the commission will have a
24 rate impact.
25 We don't know yet, you know, and I don't want
26
1 to prejudge that.
2 And what this basically says is that, in the
3 event that a power plant is selected and there is a
4 capacity mitigation, which is the current market
5 rules, that that risk will be -- will not be borne
6 by the developer.
7 And that is a true statement.
8 SENATOR MAZIARZ: Okay, if the contingency
9 plan, I mean, if Indian Point is to -- is to --
10 let's say, be recommended for closure, you know,
11 what you're saying is, that NYPA will not
12 participate at all in the cost of replacing that
13 2,000-plus megawatts of power?
14 GIL QUINONES: NYPA's role is, if a power
15 plant is selected, part of -- as Mr. Addepalli
16 described, there are three buckets: you have demand
17 reduction, you have transmission projects, and you
18 have power plants.
19 If a power plant is selected, the design of
20 the RFP is for NYPA to be the counterparty for that
21 power plant.
22 But, also, as Mr. Addepalli described, if --
23 and, again, I want to emphasize the "if" -- if that
24 is the case, the beneficiaries of that reliability
25 solution will bear the cost, not NYPA itself.
27
1 But, again, I think it's important, I just
2 want to emphasize, it's really important, that we
3 all not prejudge that there is a significant cost to
4 this contingency plan that hasn't been determined,
5 and let's wait until the commission submits its
6 decision on what the potential solution is, and what
7 are the costs associated with it.
8 SENATOR MAZIARZ: I have more questions, but
9 I'll let Senator Ritchie go.
10 SENATOR RITCHIE: I have a few questions.
11 I guess I would like to start by just trying
12 to get, you know, my mind around what's going on.
13 This contingency plan, has this happened
14 anywhere else?
15 GIL QUINONES: When you say "anywhere
16 else"...?
17 SENATOR RITCHIE: It's first time that --
18 with Indian Point that this has been put into place,
19 this proceeding?
20 RAJENDRA ADDEPALLI: In a very formal way,
21 this may be one that caught the attention of many
22 stakeholders, but, as I mentioned before, we have
23 had many power plants retire in the state, and in
24 certain cases, we -- there were reliability
25 concerns, and we had proceedings in front of the
28
1 commission, through which, "What needs to be done to
2 address the reliability need?"
3 And utilities have proposed transmission
4 projects, but said that it will take time, so, there
5 was an agreement reached with the generator to keep
6 them open during a period, through commercial
7 arrangements.
8 So, we had proceedings before the commission,
9 but this is of a different ilk, given the magnitude
10 of what we are looking at, and a multitude of
11 solutions that are available here, possibly, to meet
12 the need, and the lead time that is required here to
13 meet the need.
14 So, we have done retirement plans before, but
15 this is a big size, relatively speaking.
16 SENATOR RITCHIE: When you previously had
17 retirement plans, had the facilities indicated that
18 they were going to retire the plant, or --
19 I guess --
20 RAJENDRA ADDEPALLI: Yes.
21 SENATOR RITCHIE: -- it looks like there's a
22 little bit of difference here, because, and correct
23 me if I'm wrong, I've not seen anything that shows
24 that Entergy has indicated that they don't want to
25 continue and -- with the relicensing.
29
1 And what you're just describing there is
2 something completely differently; correct?
3 RAJENDRA ADDEPALLI: Correct.
4 That's a very good observation.
5 In the other cases, the retirement policy
6 only requires a six-month notice from the
7 commission.
8 And, the generators complied with the
9 request; six months ahead, they told us that they
10 would retire.
11 And we analyzed, and there was a need in
12 those couple of cases.
13 Not all, a couple of those cases.
14 Here, the situation could be different, if
15 they announce six months ahead, or a year ahead, and
16 say, We will not be available.
17 In the other cases, there was an opportunity
18 to keep them open through a commercial arrangement.
19 If the NRC denies license, that opportunity
20 doesn't exist.
21 So, there is a different reliability concern
22 here, and different opportunities, or lack of
23 opportunities.
24 SENATOR RITCHIE: So you're saying --
25 RAJENDRA ADDEPALLI: This distinguishes it
30
1 from other --
2 SENATOR RITCHIE: -- so this plan is only put
3 in place if, in fact, the licenses aren't renewed,
4 or, if Entergy decides that they don't want to
5 continue?
6 Is that what you're saying?
7 RAJENDRA ADDEPALLI: That's correct.
8 And if -- the lead time is the big issue: how
9 much of a lead time do we need to bring in
10 substitute resources?
11 If the lead time is six months, then we
12 don't -- we won't have to do much now.
13 But many of these transmission or demand
14 reduction or generation take time, two to
15 three years at least.
16 And, so, that's the difference.
17 SENATOR RITCHIE: So if their license is
18 renewed and Entergy is going continue, then this
19 plan goes away?
20 RAJENDRA ADDEPALLI: The license-renewal
21 process, it's not clear if it would happen anytime
22 soon, and -- but you cannot take the risk of waiting
23 until the last minute, only to find that it may not
24 happen.
25 So, as I said, we have halting provisions in
31
1 the plan.
2 That, if we find new information in the
3 coming months and years, and if that tells us there
4 is no need for this plan to continue, we should take
5 another look and say, Should we stop some of these
6 projects?
7 And, at that time, we'll make an evaluation,
8 what makes economic sense.
9 SENATOR RITCHIE: So I guess, for
10 clarification:
11 If the licenses are renewed and Entergy
12 decides they are going to continue with the plan, if
13 nothing changes, then it is the intent that this
14 plan would be halted?
15 RAJENDRA ADDEPALLI: It's a question of
16 timing, Senator, when you would learn about it.
17 If you learn about it in 2015 fall, it may be
18 too late, because the replacement solutions,
19 perhaps, would be on the way, most of the way.
20 And also, as I mentioned before, we want to
21 minimize costs to ratepayers.
22 So, if there are solutions that would make
23 sense, in that the benefits exceed costs to
24 ratepayers, even if Indian Point stayed open, it
25 would behoove for us to move forward with those
32
1 solutions that minimize rates to ratepayers.
2 SENATOR RITCHIE: So I guess one of the
3 concerns for me, as somebody who represents an area
4 that has three nuclear facilities, is that
5 considering, now, this seems to be a new contingency
6 plan, a new proceeding, I'm wondering, why would any
7 facilities take the risk of investing money to
8 upgrade if, in fact, at any time, the PFC could, you
9 know, swoop in and decide that there's going to be
10 an opportunity to put a contingency plan in place?
11 RAJENDRA ADDEPALLI: The contingency plan
12 came about because of the uncertainty and (a) of the
13 plant being available, and (2) because of
14 reliability concerns.
15 With those three plants that you mentioned,
16 one has to look at, is that even a question?
17 There may be no issues associated with
18 relicensing at all in the near future.
19 And, second, if one or two -- not that I'm
20 suggesting that they shut down, but if they were to
21 announce, is there a reliability concern?
22 So, there are other threshold conditions that
23 had to be met.
24 We have --
25 GIL QUINONES: Yeah, if I could just add,
33
1 I think the fundamental difference between the
2 plants up in your area that you represent, and
3 Indian Point, is that Indian Point is currently
4 under a relicensing proceeding before the federal
5 Nuclear Regulatory Commission.
6 And that uncertainty really is the
7 motivation, was the motivation, for us to be more
8 proactive, rather than sitting back and waiting
9 what -- what -- you know, what may happen in that
10 proceeding.
11 We wanted to be more proactive, the State,
12 through the Public Service Commission, to make sure
13 that reliability; safe, reliable electricity, is
14 available to the citizens, especially here
15 downstate.
16 That's the fundamental difference: the plants
17 upstate are not going through a relicensing process
18 before the Nuclear Regulatory Commission.
19 SENATOR RITCHIE: And I understand that, but
20 for me, personally, it looks like we're starting a
21 precedence here --
22 SENATOR MAZIARZ: Exactly.
23 SENATOR RITCHIE: -- that, you know, this
24 time maybe you're saying, because it's relicensing
25 is coming up, but that doesn't mean, next time, now
34
1 that you've started the precedence, that it doesn't
2 have to be at a time that the plant is up for
3 relicensing.
4 So, I will say for me, personally, it's a big
5 concern.
6 SENATOR MAZIARZ: I would add to that
7 concern.
8 I think, you know, that, you know, this
9 becomes the prototype.
10 Eventually -- eventually, all those plants
11 will be up for relicensing.
12 And, you know, if -- I assume that not any of
13 them are the size of the magnitude of the generator
14 that Indian Point is, and I think that -- that's why
15 I think this proceeding before the PFC has to be
16 monitored very closely, because of what
17 Senator Ritchie pointed out, this could become the
18 prototype of what's going to happen.
19 And I also think, to comparison -- and
20 I apologize, I don't know if you were finished or
21 not -- but, the comparison with Vermont Yankee is
22 somewhat disingenuous for me.
23 Vermont Yankee I think was a 600-, maybe
24 600-plus-megawatt plant.
25 I don't exactly -- I'm not very familiar with
35
1 the location of Vermont Yankee, but I can't believe
2 it's in a -- in an area similar to, or with a need
3 similar to, where Indian Point is located, you know,
4 with such a large population, serving a capacity --
5 serving a city like New York.
6 So, I just don't think that's a very fair
7 comparison either.
8 I'm sorry, Senator, were you finished?
9 SENATOR RITCHIE: I'm all set.
10 Thank you.
11 SENATOR MAZIARZ: Okay, I wanted to make that
12 point about Vermont Yankee.
13 I really don't have any other questions.
14 Unfortunately, Senator Carlucci, I'm told,
15 is, like, downstairs, on his way up here.
16 So, if you would not go too far, he may have
17 some questions for you later on.
18 May we call you, if you could stick around
19 for just a little while?
20 GIL QUINONES: I --
21 SENATOR MAZIARZ: You can't.
22 GIL QUINONES: I can't.
23 I have to move on to another function.
24 SENATOR MAZIARZ: Okay, that's fine.
25 Thank you.
36
1 We appreciate it.
2 GIL QUINONES: Thank you very much.
3 RAJENDRA ADDEPALLI: Thank you.
4 (Pause in the hearing.)
5 (The hearing resumed, as follows:)
6 SENATOR MAZIARZ: Thank you.
7 Our next appearance is by Stuart Nachmias,
8 the vice president of energy policy for Con Edison.
9 Stuart.
10 Thank you very much for being here.
11 Thank you very much.
12 STUART NACHMIAS: Thank you.
13 Good morning, Senator Maziarz,
14 Senator Ritchie.
15 SENATOR MAZIARZ: Good morning.
16 STUART NACHMIAS: My name is Stuart Nachmias,
17 and I'm Con Edison's vice president for energy
18 policy and regulatory affairs.
19 And thank you for the opportunity to present
20 our views on the Indian Point contingency plan
21 currently before the New York State Public Service
22 Commission.
23 I'd like to note up front, that in developing
24 and presenting the Indian Point contingency plan,
25 Con Ed took, and continues to take, no position on
37
1 whether Indian Point should close or is likely to
2 close.
3 However, it has, and continues to be, our
4 position that if policymakers determine that
5 Indian Point will be shut down, a plan to replace
6 the electricity output of the facility needs to be
7 developed and in place prior to any shutdown.
8 On November 30, 2012, the New York State
9 Public Service Commission issued an order, stating
10 that the loss of Indian Point Energy Center could
11 result in significantly reduced reliability at the
12 time of shutdown, and for several years thereafter
13 until replaced.
14 According to the commission, the value of a
15 reliability contingency plan to address reliability
16 concerns associated with the closure of the nuclear
17 power plants at the Indian Point Energy Center is
18 increasingly apparent.
19 Accordingly, the commission's order required
20 that Con Edison, in conjunction with the New York
21 Power Authority, develop a contingency plan to
22 address the needs that would result for the summer
23 of 2016 if Indian Point were to retire.
24 The plan would enable the State to be ready
25 for the closure of such a large generation facility,
38
1 whether or not the facility is actually closed at
2 that time.
3 In other words, the directive in the
4 commission's November 30th order indicates that the
5 commission has deemed it necessary and appropriate
6 for the State to pursue a policy that prepares for
7 the possible closure of Indian Point, even though
8 that decision has not yet been made.
9 Just a bit about the Indian Point Energy
10 Center facility:
11 I think it was mentioned by the prior folks,
12 it's owned by Entergy, and consists two nuclear
13 facilities, Units 2 and 3, each capable of producing
14 approximately 1,020 megawatts, for a total of
15 slightly over 2,000 megawatts, and they operate
16 under a license from the Nuclear Regulatory
17 Commission.
18 It's our understanding Entergy has submitted
19 a timely request to the Nuclear Regulatory
20 Commission to extend its license, which is currently
21 pending.
22 Indian Point's annual energy output of,
23 roughly, 16,000 -- million-megawatt hours accounts
24 for approximately 30 percent of Con Edison's service
25 area's annual consumption -- that's 10 percent of
39
1 the state's consumption -- and, it's currently
2 required to maintain electric system reliability in
3 the state.
4 If replacement resources are not in place
5 prior to a shutdown of Indian Point, the
6 New York ISO may be required, at certain times and
7 under conditions, to interrupt customers to match
8 electric supplies with customer demand.
9 The shutdown of the Indian Point units would
10 also increase the price of electricity for
11 consumers.
12 Indian Point's electricity also provides
13 economic and environmental benefits to our region
14 and to other New York State electricity consumers.
15 The shutdown of the units would increase the
16 price of electricity for consumers, would increase
17 greenhouse gases and other air emissions in the
18 region, and would potentially impact the local
19 economy.
20 The shutdown would also adversely affect the
21 fuel mix used to generate electricity in
22 southeastern New York, resulting in the increased
23 use of fossil-fuel-based supplies.
24 As a result of these potential impacts, new
25 facilities and infrastructure must be built and
40
1 placed into service before a permanent shutdown can
2 occur.
3 This means new transmission and replacement
4 resources will need to be designed, receive all
5 required permits, be constructed, tested, and placed
6 into operation ahead of such shutdown in order to
7 avoid reliability-criteria violations and other
8 negative impacts.
9 Further, it's our understanding, that while
10 the license-renewal process will take many years,
11 the final decision could happen very quickly, and
12 once that decision happens, a shutdown, if it's
13 required, would happen quickly as well.
14 In response to the commission's directive, on
15 February 1, 2013, Con Edison and the New York Power
16 Authority filed a proposed Indian Point contingency
17 plan.
18 The plan focused on responding to the
19 commission's order, and presenting the commission
20 with realistic and cost-effective options to have
21 alternative sources of energy in place should
22 Indian Point close, and to meet the earliest
23 possible date that such closure could impact the
24 state's energy system, which is by the summer of
25 2016.
41
1 In developing the plan, we considered the
2 project should make sense even if Indian Point were
3 to remain open, which is a possible outcome.
4 The proposed plan featured the following
5 elements:
6 As was stated, we identified the reliability
7 need to be approximately 1,450 megawatts in the
8 summer of 2016 should Indian Point shut down.
9 We have a proposal to implement approximately
10 100 megawatts of peak-demand reduction, in
11 conjunction with Con Edison, NYSERDA, and the
12 New York Power Authority.
13 Con Edison and NYPA proposed to begin
14 development of three transmission solutions with,
15 PFC approval, so they can be in place by the summer
16 of 2016.
17 An RFP was issued by NYPA, to solicit other
18 new incremental generation and transmission
19 proposals from third parties that could be in place
20 by summer of 2016.
21 A mechanism that would enable the commission
22 to halt project development if it becomes clear that
23 the projects are not needed by 2016, while also
24 providing for cost recovery to developers of actual
25 costs incurred up to that time.
42
1 And, we requested an independent evaluation
2 of all proposals by the Department of Public
3 Service, which would then recommend to the
4 commission which projects should move forward to
5 completion.
6 The plan emphasized that it was essential
7 that work begin promptly, with the suggested
8 schedule to have facilities in place by summer of
9 2016.
10 One of the key elements of our plan was the
11 proposal for Con Edison and NYPA to move forward
12 with three transmission projects:
13 A second 345-kV transmission line from Ramapo
14 to Rock Tavern;
15 The unbottling of generation on Staten Island
16 via transmission investments;
17 And, third, a Marcy South Series Compensation
18 Project from Fraser to Cooper Corners
19 reconductoring.
20 The three projects were included in the plan
21 for two key reasons:
22 First, due to the nature of the projects, we
23 would be able to build and construct them and have
24 them in place by the summer of 2016;
25 And, second, these projects will provide
43
1 benefits to consumers throughout New York,
2 including, increasing electricity flows across the
3 state's transmission system, enhancing economic
4 development in the form of job creation during
5 construction, and ongoing operations, stabilizing,
6 and potentially increasing local tax revenues and
7 enhancing wholesale power-market competition.
8 Of course, these projects would also
9 alleviate most, but not all, of the needs resulting
10 from the shutdown of the Indian Point Energy Center.
11 The Indian Point contingency plan lays out
12 options for the State to prepare for a possible
13 Indian Point Energy Center shutdown.
14 It proposes transmission projects that make
15 sense for customers throughout the state even if the
16 plant is still in service, and presents a mechanism
17 to add new third-party resources that would be
18 needed if the plant is shut down.
19 In other words, the plant is a roadmap for
20 advancing projects that support the future of the
21 state's electric infrastructure, while, at the same
22 time, preparing for the potentially large-impact
23 event, the shutdown of Indian Point.
24 Moreover, since the plan is developed to
25 benefit customers both with and without
44
1 Indian Point, Con Edison has proposed, and other
2 New York transmission owners have supported, that
3 the costs associated with the transmission projects
4 should be shared across the state, with the heaviest
5 share of cost being paid by downstate customers,
6 from the Lower Hudson Valley, south.
7 We believe such a cost allocation makes
8 sense, as benefits from these transmission projects
9 will accrue throughout the state.
10 In summary, because of the significant size
11 of the Indian Point Energy Center and the potential
12 impact of such a large shutdown, should it occur as
13 a result of state policy, it's reasonable to pursue
14 a contingency plan now.
15 Our contingency plan recognizes that we need
16 to be prepared for that potential shutdown of
17 Indian Point, and will also support an electricity
18 system that can both be reliable and resilient to
19 support the state's future.
20 Thank you for the opportunity to discuss our
21 perspectives on the Indian Point contingency plan,
22 and I'm available to respond to any questions that
23 you may have.
24
25
45
1 SENATOR MAZIARZ: Thank you very much,
2 Mr. Nachmias.
3 We appreciate your appearance here today very
4 much.
5 I do want to just note for the record that
6 we've been joined by my colleague
7 Senator David Carlucci.
8 Senator, thank you very much for being here.
9 I did indicate at the beginning of the
10 hearing that you were on your way, so, I did do
11 that.
12 Mr. Nachmias, let me go right to, I think,
13 maybe the very last point that you made, that sort
14 of jumped off the page at me, where you said
15 something that seemed to me to controvert what
16 Mr. Quinones and Mr. Addepalli said earlier, that
17 the costs of a potential shutdown of Indian Point
18 should be shared across the state by people who
19 benefit from it.
20 "Across the state," to me, includes
21 North Tonawanda, New York, where I live, and get
22 no -- absolutely no benefit at all from
23 Indian Point, and, Senator Ritchie's area up in the
24 North Country.
25 Why would you contend that the cost should be
46
1 borne by people who live there?
2 STUART NACHMIAS: Well, these projects are
3 being done for a variety of reasons, and one is
4 public policy, and, there are benefits from these
5 projects across the state.
6 So, in addition to --
7 SENATOR MAZIARZ: What are the benefits?
8 STUART NACHMIAS: In addition to the capacity
9 and energy benefits, there are opportunities for
10 additional renewables development, and there have
11 been proposals for wind resources in the upstate
12 area.
13 The project also increases the flow of energy
14 from upstate to downstate, which will allow more
15 generators upstate to be dispatched.
16 It provides additional stabilization, in
17 terms of jobs, in terms of tax revenues, in those
18 local communities, and potentially keeps some of
19 those units in service.
20 I think we heard that some of the local
21 retirements of generators in various parts of the
22 state potentially result in local issues there.
23 So there are benefits across the state, and
24 so we do think it's appropriate that consumers
25 across the state pay for these transmission
47
1 solutions, but we do have a proposal that has the
2 heaviest share of those costs to the downstate
3 region.
4 SENATOR MAZIARZ: So what you're saying is,
5 that costs would be shared, but the heaviest
6 burden -- the heaviest financial burden, let's say,
7 would be borne by ratepayers within the Con Edison
8 service territory?
9 Is that --
10 STUART NACHMIAS: It's by ratepayers in the
11 southern part of the state, so, it's not only
12 Con Edison.
13 SENATOR MAZIARZ: Well, right --
14 STUART NACHMIAS: Yeah, but in the southern
15 part of the state?
16 SENATOR MAZIARZ: -- but I assume Con Ed has
17 the overwhelming majority --
18 STUART NACHMIAS: Yes.
19 SENATOR MAZIARZ: -- of those ratepayers.
20 STUART NACHMIAS: Yes.
21 SENATOR MAZIARZ: So, again, I will go back
22 to the beginning of your statement.
23 STUART NACHMIAS: Sure.
24 SENATOR MAZIARZ: I wanted to start there at
25 the end, because that one had the most impact,
48
1 but -- at least the most impact on me.
2 You indicated very clearly, that if
3 Indian Point -- if this contingency plan held that
4 be Indian Point were to close down, that there would
5 be a price increase for consumers, and that air
6 quality would suffer?
7 Did I hear that correctly?
8 Or --
9 STUART NACHMIAS: From a greenhouse-gas
10 perspective, certainly, Indian Point is a favorable
11 plant, and so there would be, certainly.
12 And also from a cost perspective, on a
13 marginal cost basis.
14 So, there would be both cost impacts and
15 environmental impacts.
16 We do think that our proposed projects
17 mitigate the cost that would otherwise be incurred
18 without them.
19 So, it would allow the dispatch of the most
20 economically efficient and cleanest generation from
21 around the state, and would allow for development of
22 renewables.
23 So, we do think that the proposal we have
24 would mitigate those impacts, but there still would
25 be impacts from the result of Indian Point closing.
49
1 SENATOR MAZIARZ: Well, I've got other points
2 to make, but I want to turn it over to my
3 colleagues.
4 Senator Ritchie.
5 SENATOR RITCHIE: So I, of course, have a
6 huge concern when you say that the cost is going to
7 be borne across the entire state, for a number of
8 reasons.
9 I represent St. Lawrence County, with the
10 NYPA facility.
11 I know Senator Maziarz has a NYPA facility
12 out in his area.
13 And I already think that my area gets
14 shortchanged when it comes to what happens there.
15 Secondly, I have three nuclear power plants
16 in Central New York and Oswego that could increase
17 their generating capacity, from what I'm told,
18 except for, there's an issue with the congestion
19 with the transmission lines.
20 So I'm not sure how I could possibly be
21 supportive of a plan that would increase the rates
22 to those in my district, considering we have a NYPA
23 facility there, that we already ship power out; we
24 have three nuclear plants, that we ship out; but
25 have capacity to actually do more, if we could do
50
1 something about the transmission issue.
2 And, you know, I noticed earlier that --
3 during the contingency plan, apparently, there are
4 three transmission lines that they're looking at.
5 I guess, for me, I wonder why the
6 transmission issue that's causing the congestion
7 from those in Central New York and Western New York
8 is not the first one on the top of this list, versus
9 the three that are listed.
10 So, I definitely have concerns.
11 And, you know, the same as what
12 Senator Maziarz said, it seems to be in direct
13 contrast to what we just heard from the two previous
14 speakers.
15 STUART NACHMIAS: So, thank you, and good
16 morning.
17 Exactly what you describe, these projects --
18 by the way, two of these three projects are also in
19 another proceeding before the Public Service
20 Commission, to relieve that congestion and allow
21 additional power to flow from upstate to downstate.
22 And in recognition of that, we have proposed
23 that the beneficiaries are across the state, and
24 that there are some additional costs, but there
25 would be commensurate benefits.
51
1 Ultimately, you know, the cost allocation
2 that gets approved will be done by the regulators.
3 They will consider, you know, the cost of the
4 projects, and the potential benefits, including the
5 benefits that we have suggested.
6 But it is exactly, I think, the point that
7 you just made with generation in upstate, that could
8 be dispatched further and provide additional flow
9 that would benefit those generators.
10 Those are clean, efficient resources.
11 They're good for the state, and would be a
12 benefit across the state.
13 SENATOR RITCHIE: You can correct me if I'm
14 wrong, but I thought you just said that Indian Point
15 was a clean generation there too?
16 STUART NACHMIAS: Well, that's true, but this
17 plan is what -- what would be the dispatch, both
18 with or without Indian Point.
19 And, certainly, in the case without
20 Indian Point, Indian Point is, certainly, from a
21 greenhouse-gas perspective, a clean plant, but there
22 would be additional dispatch that would happen, and
23 we want the cleanest, most efficient dispatch.
24 And, so, the additional transmission would
25 allow that, so it would mitigate what impacts would
52
1 potentially happen without these solutions.
2 SENATOR RITCHIE: So I guess I will just ask
3 you:
4 How would you propose that I would go back to
5 the district that I represent, or any of the
6 North Country that myself or Senator Little
7 represents, and tell them that they're now going to
8 bear the cost of what's -- or, at least part of the
9 cost with regards to the retiring of Indian Point,
10 if that proceeds?
11 STUART NACHMIAS: I think, you know, that the
12 Public Service Commission has considered all the
13 benefits.
14 There are a variety of environmental
15 benefits, benefits to local generators, local jobs
16 in the upstate communities, property taxes that are
17 supported, by the fact that these projects do allow
18 additional flow of power across the state, and that
19 is something that was viewed in a process through
20 regulators, and those benefits were all considered.
21 SENATOR RITCHIE: I just have one other
22 question.
23 I see that you're the co-author of the plan
24 with NYPA.
25 I guess I would like to know how that came
53
1 about.
2 STUART NACHMIAS: It was a -- the order by
3 the Public Service Commission ordered Con Edison and
4 NYPA to submit the plan; and, so, that's what we
5 did.
6 SENATOR RITCHIE: Senator Maziarz.
7 SENATOR MAZIARZ: Thank you, Senator Ritchie.
8 Senator Carlucci.
9 SENATOR CARLUCCI: Yeah, thank you,
10 Chairman Maziarz.
11 Just a question, you had talked about
12 economic development.
13 Could you elaborate on some of those
14 proposals; specifically, you mentioned Ramapo to
15 Rock Tavern?
16 STUART NACHMIAS: So, thank you, and welcome.
17 It's nice to see you.
18 The Ramapo-Rock Tavern project, there is an
19 existing transmission line from the Rock Tavern
20 substation, which is in central Hudson territory,
21 through to the Ramapo substation in Orange and
22 Rockland territory.
23 The proposal is to add a second
24 345-kV transmission line along that right-of-way,
25 so, it is using an existing right-of-way.
54
1 It's a project that had -- got its Article 7
2 permitting back in the 1970s.
3 And, so, there are certainly going to be jobs
4 that result from the construction work to install
5 that, that additional feeder.
6 SENATOR CARLUCCI: Do you have any numbers in
7 terms of proposed jobs or estimates?
8 STUART NACHMIAS: You know, I don't have that
9 number offhand, but, the project is a, roughly,
10 $125-million project.
11 SENATOR CARLUCCI: And, then, would there be
12 an increase in property taxes that would have to be
13 paid?
14 STUART NACHMIAS: Well, to the extent that
15 transmission -- you know, transmission assets do pay
16 taxes, so there could be taxes associated with that.
17 But also importantly, that transmission line
18 enables more power to flow from upstate to
19 downstate, so there will be more generation
20 dispatched in the upstate area, and that helps
21 support, I think, the financial viability of some of
22 those units, with their associated taxes.
23 SENATOR CARLUCCI: You mentioned the second
24 345 line.
25 What does that mean in terms of generation,
55
1 or, in terms of moving electricity?
2 STUART NACHMIAS: So two of the solutions,
3 that project, together with the project that the
4 New York Power Authority is implementing called the
5 "Marcy South Series Compensation," those
6 two projects, together, will move about another
7 400 megawatts of power, to flow from upstate into
8 the southeast New York region.
9 SENATOR CARLUCCI: Thank you.
10 SENATOR MAZIARZ: I'm sorry, were you
11 finished, Senator?
12 SENATOR CARLUCCI: Yes, thank you.
13 SENATOR MAZIARZ: Thank you very much.
14 Mr. Nachmias, I just wanted to make a couple
15 more points.
16 You know, you mentioned about the potential
17 closure, and encouraging renewables, and that
18 everyone should share in the cost of that.
19 You know, this Committee, with
20 Senator Carlucci, Senator Ritchie, myself, the other
21 members, and with the Assembly, and certainly with
22 Governor Cuomo, have done a lot in the last
23 two years to encourage renewables, to incentivize
24 renewable energy, particularly solar, wind, and so
25 forth.
56
1 But I have to tell you, it is very difficult.
2 It is a lot easier said than done.
3 I am currently involved in my district with a
4 wind-generation project, which has pitted neighbor
5 versus neighbor, family member versus family member,
6 animosity that will last generations, over the
7 siting of one windmill on a farm.
8 The Power Authority just, probably, two or
9 three years ago, not under the leadership -- I want
10 to make it very clear -- not under the leadership of
11 Gil Quinones, spent, probably, millions of dollars
12 on an offshore wind project in Upstate New York, in
13 Lake Ontario and Lake Erie, that, after spending
14 millions of dollars on, went bust.
15 So, you know, again, that was public money
16 that was spent for siting of renewable sources.
17 Not that -- not that -- I want to be very
18 clear, I'm not opposed to that, this Committee is
19 not opposed to that.
20 We've done everything to encourage that.
21 But to say to take 2,000-plus megawatts off
22 the grid and it's going to be replaced by renewables
23 in Upstate New York, or that -- you know, that's
24 just very difficult.
25 Very difficult.
57
1 And I want -- I know you represent -- or, I'm
2 sorry, are affiliated with a company in the far --
3 the far eastern region.
4 And I just wanted to let you know, and
5 I think Senator -- I believe Senator Ritchie would
6 agree with me, I certainly don't speak for her, but,
7 it's a lot easier said than done.
8 Thank you.
9 Any other questions?
10 Oh, I'm sorry.
11 Senator Carlucci.
12 SENATOR CARLUCCI: The plan that's put forth,
13 have you taken into considering, like
14 Senator Maziarz talked about, renewable energy
15 sources that are coming online, or new conservation
16 practices?
17 How about new projects that are online to be
18 built, or proposed?
19 Was that taken into consideration?
20 STUART NACHMIAS: Well, the New York ISO, in
21 its planning process, would already consider
22 projects that are moving along in the pipeline, in
23 its plan, so, anything incremental to that would be
24 eligible.
25 And certainly the thought was, that we could
58
1 facilitate some incremental renewable energy.
2 Also, there's a 100-megawatt component of the
3 plan that focuses on energy efficiency, demand
4 response, support of some localized CHP.
5 So, there's a variety of components of the
6 plan that would address some of the elements that
7 you speak to.
8 SENATOR CARLUCCI: Are you aware if the --
9 there's a proposed desalinization plant in
10 Rockland County.
11 Has that been taken into consideration with
12 the plan, in terms of energy consumption?
13 STUART NACHMIAS: Not that I could speak to
14 right now, that I'm aware of.
15 I guess, if that is already in the load
16 forecasts, then it might be, but, I don't know
17 whether or not it is yet in the load forecast.
18 SENATOR MAZIARZ: Any other comments or any
19 anything you'd like to add, or any observations you
20 would make on that?
21 STUART NACHMIAS: I appreciate the
22 opportunity.
23 I think my comments, and the comments from
24 the folks before, are somewhat aligned, in terms of
25 moving forward, and just preparing the State.
59
1 But I appreciate the opportunity to be here
2 today.
3 Thank you.
4 SENATOR MAZIARZ: I would make this
5 observation, though, Mr. Nachmias, that, you know,
6 you represent the -- you know, the private sector in
7 the energy field; you know, and Mr. Quinones and
8 Mr. Addepalli represent, kind of, the public sector,
9 public agencies.
10 You know, so -- you know -- and I realize you
11 started off by saying that Con Ed does not take a
12 position on the open or closure of it, and I can
13 appreciate that.
14 But, eventually, you know, down the road,
15 we're going to need your type of expertise -- they
16 are going to need your type of expertise on what's
17 best for your customers.
18 Thank you.
19 STUART NACHMIAS: Thank you.
20 SENATOR MAZIARZ: Our next appearance will be
21 by T. Michael Twomey, the vice president, external
22 affairs, from Entergy Wholesale Commodities.
23 Hi, Mike.
24 T. MICHAEL TWOMEY: Good morning.
25 SENATOR MAZIARZ: Thank you very much for
60
1 being here today.
2 T. MICHAEL TWOMEY: Thank you for inviting
3 me.
4 SENATOR MAZIARZ: How's business?
5 T. MICHAEL TWOMEY: Well --
6 SENATOR MAZIARZ: My father would say,
7 "It could always be better."
8 T. MICHAEL TWOMEY: Could always be better.
9 Good morning, Senator Maziarz,
10 Senator Ritchie, Senator Carlucci.
11 I appreciate the opportunity to appear at
12 this hearing.
13 My name is Mike Twomey and I am the
14 vice president, external affairs, for
15 Entergy Wholesale Commodities.
16 Entergy Corporation, the owner of
17 Indian Point, is one of the largest nuclear
18 operators in the United States.
19 It purchased Indian Point Unit 3 and the
20 James A. Fitzpatrick facility in Oswego in 2000 from
21 NYPA, and Indian Point Unit 2 was purchased from
22 Con Edison in 2001.
23 In the last 10 years, Entergy has invested
24 more than $1 billion in the Indian Point facility,
25 including hundreds of millions of dollars to
61
1 strengthen and enhance safety and security.
2 Indian Point provides the following economic
3 benefits:
4 More than 1,000 full-time jobs that generate
5 more than $140 million in annual employee payroll,
6 more than $350 million in annual local purchases,
7 approximately $75 million in annual property-tax
8 payments and value-sharing-agreement payments to
9 state and local governments, and more than
10 $1 million in annual charitable contributions to
11 non-profit organizations located within the
12 Lower Hudson Valley and New York City.
13 According to an economic study done by the
14 Nuclear Energy Institute in 2004, Indian Point
15 generates close to $1 billion in annual economic
16 activity for the region.
17 Indian Point has an excellent safety record
18 and ranks among the most reliable in the nation.
19 The NRC reporting regime includes full-time
20 resident inspectors who have unrestricted access to
21 plant information, as well as to any and all
22 personnel.
23 For 2012, Indian Point, once again,
24 maintained all "green" NRC performance indicators
25 and inspection findings following more than 11,000
62
1 hours of review by that independent agency, placing
2 the station in the overall "green" category of the
3 NRC's oversight program.
4 According to the New York ISO, Indian Point
5 currently provides between 25 percent and 30 percent
6 of the electricity needed to serve New York City and
7 significant parts of Westchester County, supplying
8 approximately 2,000 megawatts of baseload power to
9 homes, businesses, municipalities, hospitals, and
10 other critical regional infrastructure.
11 According to a study prepared by
12 Charles River Associates commissioned by the
13 New York City Department of Environmental Protection
14 in 2011, Indian Point's retirement would lead to a
15 2- to 3-billion-dollar increase in wholesale energy
16 costs through 2030 for New York City consumers.
17 Statewide, the increase would be 10 to
18 12 billion for the same period.
19 These increased wholesale energy costs would
20 be in addition to the cost of building new
21 generation and transmission infrastructure, which we
22 believe would be at least 2000 -- excuse me, at
23 least $2 billion based on most likely scenarios.
24 New Yorkers already pay the highest statewide
25 average residential electric rates in the contiguous
63
1 United States, based on 2012 data from the
2 Energy Information Administration.
3 Mr. Nachmias mention this had earlier:
4 According to the CRA report, New York would
5 see approximately a 15 percent increase in carbon
6 emissions under most conventional scenarios, with,
7 roughly, a 7 to 8 percent increase in nitrogen oxide
8 commissions.
9 Nuclear power plants do not burn hydrocarbons
10 to generate electricity so they produce, virtually,
11 no greenhouse gases.
12 In 2011 alone, U.S. nuclear plants prevented
13 the release of more than 600 million metric tons of
14 carbon dioxide into the atmosphere.
15 This is nearly as much carbon dioxide as is
16 released annually from all U.S. passenger cars.
17 Proposed national and regional
18 carbon-reduction goals simply cannot be met without
19 nuclear plants.
20 Some critics of the facility mischaracterize
21 Indian Point's contribution to the regional grid by
22 looking only at the amount of power it delivers to
23 utilities under purchase-power agreements, including
24 a 500-megawatt purchase-power agreement with Con Ed
25 we have in place through 2017, rather than looking
64
1 at the total amount of power the plant provides.
2 In fact, utilities typically supply their
3 needs with a mix of PPAs and open-market
4 purchases.
5 The mix of these purchases from Indian Point
6 can change, but approximately 2,000 megawatts from
7 the facility is continuously provided to the
8 New York electric system.
9 Indian Point submitted an application for a
10 renewed operating license to the NRA in April 2007.
11 The NRC staff has issued a final supplemental
12 environmental impact statement and a final
13 supplemental -- excuse me, safety-evaluation report,
14 both of which support license renewal.
15 Before the NRC can issue a final decision on
16 Indian Point's license-renewal application, however,
17 it must resolve 13 pending contentions filed by
18 New York State and two environmental organizations.
19 Nine of these contentions were tried before
20 the ASLB in 2012, and the remaining four will be
21 likely tried in early 2014.
22 The Indian Point license-renewal proceeding
23 is the most complex license-renewal proceeding ever
24 conducted by the NRC.
25 It will not be completed for several years.
65
1 The Timely-Renewal Doctrine established in
2 the federal Administrative Procedure Act, and
3 incorporated in NRC regulations, provides that if a
4 licensee submits a timely application for license
5 renewal, then the existing license does not expire
6 until the application has been finally determined by
7 the agency.
8 The NRC regulations require reactor licensees
9 to submit license-renewal applications five years
10 before expiration in order to qualify for
11 timely-renewal protection.
12 Indian Point submitted its application for
13 license renewal more than five years before the
14 expiration of the existing Indian Point licenses.
15 Therefore, until the NRC license-renewal
16 process is complete, the current operating licenses
17 for Indian Point Units 2 and 3 will not expire, but
18 will, instead, be extended by operation of federal
19 law.
20 The NRC has completed specific inspections of
21 Indian Point designed for licensees who will likely
22 operate under the Timely-Renewal Doctrine.
23 Over the weekend, on September 28th,
24 Indian Point Unit 2 entered the period of extended
25 operations, after receiving notifications from the
66
1 NRC that the plant had passed the appropriate
2 inspections, and provided the NRC with the requisite
3 assurances that various commitments are being met
4 and will continue to be met.
5 Going forward, the NRC's regulations will
6 continue in full force during the timely-renewal
7 period.
8 In connection with the license-renewal
9 application, Indian Point has made appropriate
10 filings with the New York State Department of
11 Environmental Conservation and the New York State
12 Department of State to address state-related
13 license-renewal issues.
14 Given the limited time available for this
15 hearing, I will not discuss those filings in detail.
16 I would simply like to note that the record
17 before NYSDEC demonstrates that Indian Point is
18 entitled to a water-quality certificate.
19 Indian Point's operations are protective of
20 the Hudson River which is in better shape today than
21 it was in 1973.
22 And, with respect to NYSDOS, the record is
23 clear that Indian Point either does not need a new
24 consistency determination under the Coastal Zone
25 Management Act, or, in the alternative, is entitled
67
1 to such a determination under the standards
2 applicable to such a request.
3 Finally, as part of the license-renewal
4 proceeding, the NRC accepted public comments.
5 More than 200 business, community, and labor
6 groups from New York submitted comments in support
7 of license renewal, including The Business Council
8 of New York State, the Partnership for New York
9 City, the New York Urban League, the New York Energy
10 Consumers Council, the NAACP New York State
11 Conference, the Westchester County Association, the
12 New York State AFL-CIO, and Teamsters Joint
13 Council 16, among others.
14 The reliability contingency plan proceeding:
15 In a November 30, 2012, order, the New York
16 PSC opened a docket to evaluate the potential
17 retirement of Indian Point.
18 While the PSC recognized that Indian Point
19 has a pending license-renewal application, it,
20 nevertheless, directed Con Edison, with the
21 assistance of NYPA, to develop and file a
22 reliability contingency plan.
23 On February 1, 2013, Con Edison and NYPA
24 filed a joint plan in which they proposed a set of
25 three transmission projects and an incremental
68
1 100-megawatt energy-efficiency program that would
2 cost customers, in total, according to the filing,
3 more than $800 million.
4 While that figure has received a lot of
5 attention in the media, it is important to note that
6 those projects would not come close to replacing
7 Indian Point's full 2,000 megawatts of capacity.
8 The total cost of replacing Indian Point's
9 capacity would likely be 2 to 2 1/2 billion dollars:
10 the 800 million for the projects referenced above,
11 and, at least one 1,000-megawatt CCGT, which would
12 cost approximately 1 to 1 1/2 billion dollars.
13 The 2- to 2 1/2-billion-dollar figure
14 represents infrastructure and program costs only,
15 and does not include the higher energy costs that
16 would also be incurred.
17 Indian Point submitted an alternative
18 proposal in response to the NYPA RFP.
19 Our proposal offers the most economic
20 alternative to any of the other options because it
21 is based on market pricing which is substantially
22 lower than the cost of constructing new resources.
23 Entergy submitted a proposal to provide
24 competitively-priced electricity from Indian Point
25 beginning in 2016, and requiring no public
69
1 subsidies.
2 Entergy's proposal would save billions of
3 dollars in unnecessary expenditures.
4 The best reliability contingency plan for
5 New York is to support Indian Point relicensing.
6 Mr. Quinones referred to the reliability
7 contingency plan as an insurance policy.
8 Well, it's an insurance policy they're
9 proposing for an event that New York can prevent
10 from happening.
11 The only uncertainty, with respect to
12 Indian Point relicensing, concerns arguments and
13 positions taken by New York State.
14 Entergy will continue to urge New York State
15 agencies to work collaboratively with the company to
16 reduce any license-renewal uncertainty.
17 In addition, we remain willing to work with
18 New York State agencies and public utilities in a
19 constructive manner to continue to provide New York
20 consumers with a safe, reliable, and environmentally
21 beneficial source of power.
22 This concludes my prepared remarks, and I'm
23 available to answer questions.
24
25
70
1 SENATOR MAZIARZ: Thank you very much,
2 Mr. Twomey.
3 I'm going to turn it over to my colleagues
4 first before I ask my questions.
5 Senator Ritchie.
6 SENATOR RITCHIE: You talked about the safety
7 record at the plant.
8 Could you just elaborate on specifics?
9 Has there ever been a leak?
10 Has there ever been an issue where you had to
11 evacuate the plant?
12 I mean, could you just elaborate on the
13 safety issue?
14 T. MICHAEL TWOMEY: I'm not aware of any
15 situation where we had to evacuate, but, there
16 certainly are, from time to time, in any industrial
17 facility, there are steam leaks, there are other
18 activities.
19 The NRC, and the nuclear industry, requires a
20 level of reporting that is unmatched in any
21 industrial enterprise.
22 We are more transparent than any industrial
23 facility, and as a result, any routine, to minor, to
24 more serious event, is reported, is discussed, is
25 reviewed, is corrected, and is dealt with.
71
1 And the safety record, overall, for the
2 facility, which has been operating for more than
3 40 years, is better than, or as good at least, as
4 any industrial facility in the country.
5 SENATOR RITCHIE: Could you just explain to
6 me what happened at the Vermont Yankee plant?
7 T. MICHAEL TWOMEY: Yes.
8 Vermont Yankee is a relatively small nuclear
9 facility, a little over 600 megawatts, and, it
10 operates in the New England Independent System
11 Operator zone.
12 It is a standalone unit, so it doesn't have
13 the benefit of, for example, Indian Point is a
14 two-unit site, so there are economies of scale.
15 Your overhead costs are spread across two
16 units.
17 So, for example, we have to provide security
18 at Vermont Yankee for one unit that produces only
19 600 megawatts.
20 We also provide security at Indian Point
21 which has 2,000 megawatts.
22 So, in a sense, you're dealing with
23 Vermont Yankee, with a small facility, that doesn't
24 generate the same level of revenue, but incurs many
25 of the same costs.
72
1 And with the low price of natural gas
2 recently in the last couple of years, that facility
3 became less competitive in the marketplace, and
4 that's because, although there is a relatively low
5 cost to produce electricity, which is what the price
6 is based on that the plant receives from the market,
7 the overhead costs are higher, and their regulatory
8 costs, there are increased investments that we've
9 made in the plant.
10 We have invested more than $400 million in
11 Vermont Yankee since we bought it.
12 And those fixed costs, those overhead costs,
13 you do not get in market pricing.
14 So as those costs either stay steady or
15 increase, you don't have an ability to recover
16 those; only your production costs.
17 And, ultimately, that facility, we made the
18 very tough decision that it was not economical to
19 continue to operate it.
20 And as a result, we've announced that that
21 facility will cease power production at the end of
22 the current operating cycle, which is expected to be
23 at the end of 2014.
24 SENATOR RITCHIE: Are there similarities
25 between that facility and Fitzpatrick?
73
1 T. MICHAEL TWOMEY: There are many, quite
2 frankly.
3 Fitzpatrick, from our perspective, is also a
4 single-unit facility.
5 It's also in a difficult market, and it is
6 situated in a way that is not unlike Vermont Yankee.
7 We have announced, and we did announce, the
8 day we made the Vermont Yankee announcement, that we
9 intend -- currently intend to refuel Fitzpatrick
10 next October, but that is an item, quite frankly, we
11 have to review on a regular basis.
12 SENATOR RITCHIE: So could you just explain
13 to me, if Indian Point is retired, would that have
14 any other consequences, separate, to Fitzpatrick?
15 T. MICHAEL TWOMEY: Well, you know, there
16 was, what would be the effect on Fitzpatrick of a
17 closure of Indian Point?
18 I don't know.
19 I mean, I will say this, we have no intention
20 of retiring Indian Point.
21 The only uncertainty regarding Indian Point
22 is whether we receive the licenses from the federal
23 Nuclear Regulatory Commission.
24 The staff at the Nuclear Regulatory
25 Commission, which has been looking at this question
74
1 for six years, has reviewed all the technical
2 information, and I believe it's close to
3 28,000 hours of review.
4 They've concluded that the plant is safe and
5 can continue to operate.
6 The uncertainty about Indian Point's
7 continued operation is largely due to actions by
8 New York State.
9 So when I discuss this, it's not that we
10 would choose to retire it; it's that New York would
11 withhold permits.
12 And we've got some legal arguments that we
13 believe are very strong, that those permits are not
14 needed, but, nothing's a guarantee.
15 So, we don't intend to retire Indian Point,
16 but, if Indian Point were not to obtain the
17 necessary licenses, I don't know what the effect on
18 Fitzpatrick would be.
19 I don't know that it would help very much the
20 situation in Upstate New York because the markets
21 are so different.
22 You would likely see other generation built,
23 transmission investment.
24 You would see the 2 to 2 1/2 billion dollars
25 get spent, which, of course, would be paid for by
75
1 customers;
2 You would see higher energy bills that would
3 be paid for my customers;
4 And you would see degraded air quality that
5 everybody would suffer from.
6 SENATOR RITCHIE: One last question:
7 Have you seen, I guess, anything like this
8 happening with a facility that hasn't said that it
9 was going to look at retiring the facility, with
10 this contingency plan being set into motion?
11 T. MICHAEL TWOMEY: I have not seen --
12 I'm sorry.
13 Senator, I have not seen anything like this.
14 You know, you asked some questions earlier
15 about Fitzpatrick and the upstate plants.
16 Fitzpatrick went through a license-renewal
17 proceeding only a few years ago.
18 There was no objection from the State of
19 New York to that relicensing.
20 New York gave the permits that were needed,
21 and the facilities were relicensed.
22 That has not been the case with respect to
23 Indian Point.
24 SENATOR RITCHIE: In your estimation,
25 considering the way this played out with this
76
1 contingency plan, do you believe that it would be
2 harder to convince people in the future to invest in
3 facilities, considering there's -- you would never
4 know whether this was going to come into play?
5 T. MICHAEL TWOMEY: I will say that it would
6 depend on the facility.
7 We are in a bit of a unique situation.
8 You have had other retirements where the
9 owners of those facilities made the decision, on an
10 economic basis, given the marketplace, that it was
11 not in their interests to continue to operate.
12 In this case, Indian Point is being
13 challenged in a way that no other generation
14 facility in the state of New York has been
15 challenged by the State.
16 And, so, I guess if you were thinking about
17 investing, you'd have to gauge, what would the risks
18 that you might be targeted for closure, in the term
19 of your investment recovery.
20 SENATOR MAZIARZ: Senator Carlucci.
21 SENATOR CARLUCCI: Thank you.
22 Mr. Twomey, you talked about New York State
23 denying permits to Indian Point.
24 Can you elaborate on that, why do you think
25 that is?
77
1 T. MICHAEL TWOMEY: Well they haven't denied
2 any permits yet, just to clarify.
3 We filed an application for a water-quality
4 certificate with the New York State Environment --
5 Department of Environmental Conservation.
6 The staff of NYSDEC recommended a denial.
7 But as of today, and the application's now
8 been pending for either three, four, maybe even
9 five -- yeah, I guess it's four years, there's been
10 no final action by NYSDEC, which is one of the legal
11 arguments we've raised, is that the NRC process
12 gives states one year to act.
13 And it's been four years, or at least
14 four years -- I'd have to check my dates -- but
15 New York has not made a final decision.
16 And with respect to the NYSDOS
17 (New York State Department of State), we've got an
18 application for a CZMA consistency determination
19 pending.
20 We believe that the record shows that we're
21 entitled to the permits.
22 We are in the hearing process with NYSDEC.
23 I certainly don't want to prejudge the
24 process.
25 We believe our witnesses have put on a
78
1 compelling case.
2 We are certainly hopeful that the outcome of
3 that process will be positive.
4 We've also submitted a comprehensive
5 application to NYSDOS.
6 We're certainly hopeful that that will be
7 reviewed with the same standards applied to our
8 filing, that are applied to other filings by similar
9 facilities.
10 SENATOR CARLUCCI: So it boils down to the
11 recommendation of staff from the New York State
12 Department of Environmental Conservation?
13 T. MICHAEL TWOMEY: At this point, yes.
14 SENATOR CARLUCCI: And what were those
15 recommendations; why were they denying this?
16 T. MICHAEL TWOMEY: Well, they raised various
17 issues.
18 They raised an issue regarding rail --
19 radiological -- proposed radiological effects on the
20 river.
21 Since that time, NYSDEC has actually settled
22 that issue with us.
23 The staff has settled that issue with us.
24 The biggest issue they've raised --
25 SENATOR CARLUCCI: So it's from the DEC, but
79
1 now the Department of State has --
2 T. MICHAEL TWOMEY: No, the DEC will issue --
3 will make a decision regarding that question.
4 The NYSDOS question is under the Coastal Zone
5 Management Act, which has up to 44 policies.
6 It's not clear to me what policies the
7 department will find are applicable.
8 And for those that they find applicable, it's
9 not clear whether we will be approved or denied, on
10 which ones.
11 They could determine, for example, that 17 of
12 the 44 are relevant, and we could prevail on 15 and
13 lose on 2; we could prevail on 2 and lose on 15.
14 We just don't know.
15 The decision timeline for that has not run
16 yet.
17 So what the New York State Department of
18 Environmental Conservation, switching back to the
19 proposed denial by the staff, their biggest issue,
20 I would say, is probably the question of whether we
21 should install two Yankee Stadium-size cooling
22 towers on the Hudson River on either side of the
23 facility, you know, as disruptive and negative
24 consequences as those would provoke.
25 For example, the saline level in the
80
1 Hudson River is such that, if you install cooling
2 towers, you'd have output at the top of the cooling
3 towers that would affect people who have asthma.
4 But, nevertheless, the NYSDEC staff has
5 proposed that cooling towers would be a better
6 proposal than the current cooling system.
7 We proposed an alternative, with wedge-wire
8 screens, that we think achieves all the objectives.
9 But those are the issues that are being tried
10 in front of the administrative law judges, and we
11 don't have a decision from the judges yet.
12 We're hopeful that our evidence will be
13 viewed more compelling -- as more compelling than
14 the evidence that's been submitted by the opponents.
15 SENATOR CARLUCCI: So, now, is this -- are
16 they stating that there is toxins that are spilling
17 out from the spent fuel rods?
18 T. MICHAEL TWOMEY: That issue has been
19 raised by one of the environmental organizations,
20 and I'm not sure that it is actually germane to the
21 NYSDEC proceeding.
22 I know that that issue's been raised by
23 certain environmental agencies, with the NRC, but,
24 certainly, that question's been raised from time to
25 time.
81
1 And we've opposed it, and we've indicated
2 that we don't think there's been any harm to the
3 Hudson River, and we will continue to do so.
4 SENATOR CARLUCCI: So it's Entergy's belief
5 that there has been no toxins spilled into
6 groundwater or the Hudson River?
7 T. MICHAEL TWOMEY: No.
8 What our position has been, is that, if there
9 have been releases, those releases have been
10 consistent with whatever permits we have in effect,
11 and that they haven't adversely affected the public
12 health and safety.
13 I can't say that there have been no releases,
14 I'm not the expert on that, but I do believe that we
15 have said repeatedly that we have not had an adverse
16 effect on the river.
17 SENATOR CARLUCCI: But you would acknowledge
18 that there has been releases of toxins, like
19 strontium-90 and caesium-137 and tritium?
20 T. MICHAEL TWOMEY: I don't know about the
21 specifics of the releases, but those are all
22 regulated by the Nuclear Regulatory Commission.
23 And I believe that we are in compliance with
24 whatever groundwater standards we're required to be
25 in compliance with.
82
1 SENATOR CARLUCCI: The Nuclear Regulatory
2 Commission allows for these toxins to be in our
3 groundwater?
4 T. MICHAEL TWOMEY: The nuc- -- well, first
5 of all, I mean, there's radiation -- there's
6 background radiation all over the country.
7 Above-ground atom-bomb testing in the '50s
8 ensured that we would all have some level of
9 background radiation regardless of where we live,
10 and, the NRC has an obligation to ensure the public
11 health and safety.
12 I'm not the expert on which, what the levels
13 are, but it is not a zero-release regimen.
14 It is a "protect the public health and
15 safety" regimen.
16 And we certainly believe we do that.
17 SENATOR CARLUCCI: Okay.
18 Now, talking about the spent fuel rods, what
19 is the plan for those fuel rods?
20 Where are they kept right now?
21 T. MICHAEL TWOMEY: Well, they're kept on the
22 site, which is where they'll remain until the
23 federal government honors its obligation to come and
24 pick up spent fuel, which is an obligation that's
25 been in place for many years.
83
1 SENATOR CARLUCCI: So what happens if that
2 obligation doesn't come to fruition?
3 T. MICHAEL TWOMEY: Well, we have two methods
4 of storing the fuel.
5 We have spent-fuel pools, which is where the
6 spent fuel rods go initially.
7 And then we've constructed dry-cask storage
8 facilities, and we are moving spent fuel on some
9 regular basis -- I don't have the schedule in front
10 of me -- into dry-cask storage where it can remain
11 in casks that are actually designed to be picked up
12 by the Department of Energy.
13 SENATOR CARLUCCI: So the dry-cask storage,
14 that's located right there on the grounds of
15 Indian Point?
16 T. MICHAEL TWOMEY: Correct.
17 SENATOR CARLUCCI: Now, how big of a facility
18 is that, and how much can it contain, in terms of --
19 T. MICHAEL TWOMEY: Well, eventually, we can
20 store all of the spent fuel that is generated in
21 Indian Point in dry-cask storage at the facility.
22 We have it -- we have one pad in place
23 already, at least one.
24 We may have to construct another pad, but, we
25 do have room on the site to store all the spent
84
1 fuel.
2 SENATOR CARLUCCI: When did that start, the
3 dry-cask system?
4 T. MICHAEL TWOMEY: I'm not 100 percent sure.
5 It was within -- certainly, since we bought
6 the plant.
7 My estimate, Senator, would be in the last
8 five to six years.
9 We can certainly get back to your office with
10 more details on that question.
11 SENATOR CARLUCCI: How long would you have to
12 store them in the dry cask?
13 T. MICHAEL TWOMEY: Well, we would store them
14 in the dry casks until the federal government picks
15 up the spent fuel.
16 And that could mean a regional facility or a
17 single national repository, depending on how that
18 works out.
19 SENATOR CARLUCCI: What's the cost to
20 maintain the spent fuel rods?
21 T. MICHAEL TWOMEY: I don't have that figure
22 in front of me.
23 I mean, we -- certainly, we pay the cost.
24 SENATOR CARLUCCI: Right.
25 T. MICHAEL TWOMEY: Consumers don't pay the
85
1 cost, because we don't -- that's one of the costs
2 that I mentioned that we don't get to include in the
3 price that we charge for power.
4 So, from a New York-consumer standpoint, the
5 cost is zero.
6 SENATOR CARLUCCI: But you don't have any
7 idea what that actually costs the company?
8 T. MICHAEL TWOMEY: I don't know that.
9 I did not come prepared to answer that
10 question today, but that's -- again, we can provide
11 that to your office as a follow-up.
12 SENATOR CARLUCCI: Great.
13 So Entergy has plans to spend money on the
14 containment of these fuel rods for, how long?
15 T. MICHAEL TWOMEY: For as long as we have
16 to.
17 SENATOR CARLUCCI: So what happens if Entergy
18 goes bankrupt, let's say, and those costs are borne
19 by Entergy right now, who would pay that to contain
20 those spent fuel rods?
21 T. MICHAEL TWOMEY: We do have
22 decommissioning trust funds, and those funds allow
23 for the spending -- for money to be spent on
24 spent-fuel management.
25 SENATOR CARLUCCI: And that's money set aside
86
1 by nuclear-power companies?
2 T. MICHAEL TWOMEY: Correct.
3 SENATOR CARLUCCI: That can't be passed on to
4 the consumer either?
5 T. MICHAEL TWOMEY: No.
6 SENATOR CARLUCCI: And do you have an idea of
7 percentage of budget what that is for you guys?
8 T. MICHAEL TWOMEY: I do not have that
9 number.
10 SENATOR CARLUCCI: Now, when we talk about
11 where Indian Point is, you know, one of the big
12 contentious points is that it's in a highly
13 populated area.
14 I live in the zone that would have to be
15 evacuated.
16 Where -- the evacuation plan, how does that
17 work?
18 Could you walk us through that?
19 T. MICHAEL TWOMEY: Well, we do have experts
20 who spend every day worrying about that issue.
21 I would note, primarily, that, first of all,
22 Indian Point's location near New York City is not
23 unique.
24 There are nuclear facilities operating near
25 Boston; Washington, D.C.; Chicago; Detroit; Miami;
87
1 Philadelphia; Pittsburgh; major cities all over the
2 United States, and particularly on the eastern
3 seaboard.
4 In fact, the last figure I saw is, roughly,
5 one-third of the United States citizens live within
6 50 miles of a nuclear facility.
7 They're a critically important part of our
8 energy infrastructure, and, you know, a decision to
9 reject nuclear power because of its proximity to
10 nuclear -- excuse me, to populated areas would
11 really be a rejection of nuclear power all over the
12 country.
13 And, it provides about 20 percent of the
14 nation's power.
15 SENATOR CARLUCCI: Right, but --
16 T. MICHAEL TWOMEY: And from a clean
17 energy --
18 SENATOR CARLUCCI: -- we're -- this is being
19 specific to Indian Point and the -- you know, the
20 geological fixtures that we have there, in terms of
21 a large river, you know, constrained modes of
22 transportation, so we've got to look at it case by
23 case.
24 And just the evacuation plans for
25 Indian Point have never really been explained to me
88
1 thoroughly, in terms of understanding how we would
2 actually evacuate that large amount of people across
3 things like the Tappan Zee Bridge or the
4 George Washington Bridge.
5 So, is that something that you're confident
6 in?
7 And, how that would work?
8 And, are you able to evacuate that area, that
9 we are called is "in the zone," in that short period
10 of time?
11 T. MICHAEL TWOMEY: Well, first of all,
12 I think -- the answer is, yes, we're very confident
13 in the effectiveness of the plan.
14 The plan is really not just an Entergy plan.
15 It requires coordination with federal
16 agencies, FEMA, state agencies, local officials.
17 Those plans are detailed.
18 They are regularly reviewed.
19 They are practiced.
20 I -- there is a wealth of information about
21 those plans, and I am not the best resource for you
22 on that question.
23 And what I'd like to do is, we can provide
24 your office with a detailed description of the plan.
25 Now, the evacuation area is proposed, in the
89
1 event that you needed to, is only about 10 miles
2 outside the facility.
3 And those plans are highly dependent on what
4 exact type of an event you have, and what you would
5 need to do.
6 But, as I say, there are experts who, really,
7 their full-time job is to worry about this every
8 day.
9 SENATOR CARLUCCI: The thing that I'm trying
10 to understand is, when we talk about that 10-mile
11 radius.
12 T. MICHAEL TWOMEY: Right.
13 SENATOR CARLUCCI: So it's 10 square miles
14 around the facility?
15 T. MICHAEL TWOMEY: I believe it's
16 10 miles -- yeah, if you picked the center of the
17 plant, it would be a 10-mile circle.
18 SENATOR CARLUCCI: So when you talk about
19 evacuating that area, it's really not a complete
20 evacuation, and that's what troubles me, in terms of
21 what I've been told is, it depends on what the wind
22 conditions are.
23 T. MICHAEL TWOMEY: Correct.
24 SENATOR CARLUCCI: Who signs off on that
25 plan?
90
1 T. MICHAEL TWOMEY: Well, FEMA, the NRC,
2 state and local officials.
3 SENATOR CARLUCCI: And right now, you're
4 confident that that's all moving forward?
5 T. MICHAEL TWOMEY: Very.
6 SENATOR MAZIARZ: Thank you very much,
7 Mr. Twomey.
8 I think that's it.
9 T. MICHAEL TWOMEY: I appreciate the
10 opportunity to appear.
11 Thank you.
12 SENATOR MAZIARZ: All right, thank you very
13 much.
14 We've been going now for almost two hours.
15 We're going to take an absolute five-minute
16 break.
17 Okay?
18 Thank you.
19 (A recess was taken.)
20 (The hearing resumed, as follows:)
21 SENATOR MAZIARZ: Our next witness is
22 Tom Rumsey.
23 Tom is the vice president of external affairs
24 for the New York Independent System Operator.
25 Tom, thank you very much for being here
91
1 today.
2 THOMAS RUMSEY: Thank you, Chairman.
3 And good afternoon to Chairman Maziarz,
4 Senator Ritchie, and Senator Carlucci.
5 I appreciate the opportunity to speak today.
6 We have submitted a pretty detailed response
7 to the hearing notice, but I'd like to summarize
8 that in about a page and a half, if you will,
9 double-spaced, and then get to your questions.
10 The New York Independent System Operator is a
11 not-for-profit organization, independent of the
12 state government, and, we take no position as to the
13 closure or continued operation of Indian Point; only
14 to the impacts of both.
15 We serve three key functions for the state of
16 New York:
17 We're responsible for the reliable operation
18 of New York's bulk electric system in accordance
19 with all national, regional, and state reliability
20 requirements;
21 We administer New York's competitive
22 wholesale electricity markets;
23 And, finally, we conduct short- and
24 long-range planning for the bulk electric system for
25 the state of New York.
92
1 The three key points that I'd like to make
2 regarding the hearing today is:
3 One, to meet reliability requirements,
4 approximately 1100 megawatts of replacement power or
5 resources would have to be in place prior the
6 closure of the Indian Point center to maintain
7 reliability standards;
8 Two, due to New York's existing transmission
9 limitations, likely solutions to the closure would
10 be new generation, additional demand response or
11 distributed generation, and limited transmission
12 upgrades;
13 And, three, these proceedings have
14 highlighted the aging New York's infrastructure --
15 Sorry, now I'm much louder.
16 It's like bad karaoke.
17 -- New York's aging infrastructure.
18 The opportunity that we have in front of us
19 to upgrade the historic bottlenecks throughout the
20 grid would benefit both upstate, it would help
21 expand renewables throughout the state, and, with or
22 without Indian Point, we shouldn't lose that
23 opportunity.
24 Please refer to the more detailed responses
25 that we submitted for further details, and I'd like
93
1 to entertain any questions you have.
2 SENATOR MAZIARZ: Thank you very much, Tom.
3 That was very short.
4 THOMAS RUMSEY: Yes, sir.
5 [Laughter.]
6 THOMAS RUMSEY: It's the fourth time we've
7 been here, sir, and, same message.
8 SENATOR MAZIARZ: Tom, can the system take a
9 closure by a 2,000-plus megawatt generator without
10 having an impact on rates and reliability, just,
11 overall?
12 THOMAS RUMSEY: Overall, right now, where
13 Indian Point is located, by our analysis, you'd have
14 1100 megawatts of a gap with resources.
15 Those resources would have to be in place
16 prior to the discontinued operation, or we'd have --
17 we would not able to meet reliability standards.
18 Now, those resources can be transmission,
19 distributed generation, new generation, any
20 combination, but they'd have to be available before
21 you can close.
22 SENATOR MAZIARZ: Is the New York ISO taking
23 part in the contingency planning process with the
24 PFC?
25 THOMAS RUMSEY: We are the technical resource
94
1 for the State, so as they ask certain projects to be
2 modeled, we will model them for them, but we are not
3 a co-signer of the plan.
4 SENATOR MAZIARZ: But have they asked?
5 THOMAS RUMSEY: They have.
6 SENATOR MAZIARZ: Thank you.
7 Senator Ritchie.
8 SENATOR RITCHIE: Just one question.
9 Talking about -- Entergy was talking about
10 the fact that they're in the relicensing process,
11 and it would be extended until the decision is made.
12 So I guess I'm trying to understand how all
13 this would take place, that Entergy won't know until
14 the end of that process; meantime, they have a
15 2016 deadline.
16 So I'm trying to understand how we could put
17 something in place of what the loss is going to be
18 with that kind of timetable, given the fact that we
19 don't really know when the decision will be made.
20 So, I don't really understand how this can
21 all take place at the same time.
22 THOMAS RUMSEY: So as previous members -- or,
23 testifiers have said, we've seen, roughly,
24 5,000 megawatts of generation retire.
25 When a generator puts in their notice to
95
1 retirement, the local -- or, the transmission owner
2 and the New York System Independent Operator analyze
3 the loss of that resource to see if there's any
4 reliability violation, or if we need them to
5 continue.
6 We've had two cases where -- Dunkirk and
7 Cayuga, where there have been local reliability
8 needs; and, therefore, a contract is struck between
9 the transmission owner and that asset owner to
10 continue operations until a -- what's called a
11 "gap solution," until a permanent solution can be
12 reached.
13 In this case, going down that path, you've
14 seen one reactor now, as Mr. Twomey said, a couple
15 days ago their license has, quote/unquote,
16 "expired", but extended, because they've -- you
17 know, the federal law allows them to continue if
18 they've requested their relicensing on time.
19 One avenue would be, that once the asset
20 owner or the NCR tells us -- or, notifies that the
21 plant is not going to continue, we then take them
22 out of the base case, which is our planning
23 document.
24 Right now, we count them in because there is
25 no indication that they will not continue.
96
1 We do do a sensitivity analysis, where we
2 model the grid without Indian Point, but the base
3 case that can drive market solutions has them in
4 because, again, no final decision has been reached.
5 One scenario, is that they would retire, but
6 enter into a commercial agreement until the
7 replacement resources were in; so they would
8 continue until this "1100" gap was filled.
9 Under the process the PSC is going under,
10 they're being more proactive to get those resources
11 identified and on the grid before a decision is
12 reached.
13 SENATOR RITCHIE: And so what happens if that
14 takes place and, Indian Point, its relicensing goes
15 through?
16 What happens at that point?
17 THOMAS RUMSEY: There's two options --
18 there's really only two scenarios.
19 One is, that power is economic, and it will
20 come into the grid and operate.
21 Those -- again -- or, there could be
22 transmission upgrades that we believe are long
23 overdue, and those would be beneficial in either
24 scenario.
25 Second, if they were to come in and they were
97
1 uneconomic, we would mitigate them so that they
2 didn't have an impact on the markets.
3 SENATOR MAZIARZ: Senator Carlucci.
4 SENATOR CARLUCCI: No questions.
5 SENATOR MAZIARZ: Oh.
6 Tom, thank you very much.
7 THOMAS RUMSEY: You're more than welcome.
8 Have a great day.
9 SENATOR MAZIARZ: Our next witness is
10 Gavin Donohue, president & CEO of Independent Power
11 Producers of New York.
12 Mr. Donahue, thank you.
13 GAVIN J. DONOHUE: Thank you, Senators.
14 I had "good morning," but I'll say, good
15 afternoon.
16 SENATOR MAZIARZ: Yeah.
17 GAVIN J. DONOHUE: Thank you, Senators, and
18 Senator Maziarz, for inviting me here today.
19 IPPNY represents over 80 generators, power
20 marketers, and other participants in New York's
21 competitive energy market, including Entergy, the
22 owner of Indian Point.
23 I've provided a comprehensive written
24 testimony to the Committee, so I'll do my best to
25 try not to be redundant and summarize it within the
98
1 10 minutes.
2 SENATOR MAZIARZ: Thank you.
3 GAVIN J. DONOHUE: Over the last 13 years,
4 IPPNY members have provided over 75 percent of the
5 state's electricity.
6 Independent power producers have invested in
7 excess of $10 billion to purchase, construct, and
8 operate their facilities, and the generator
9 community pay in annual taxes of over $600 million
10 in New York State.
11 IPPNY members utilize cutting-edge
12 technologies, fuel types such as co-generation,
13 nuclear, hydro, coal, wind, oil, landfill gas,
14 natural gas, energy-from-waste, and biomass.
15 Indian Point is a prime example, providing
16 over 20 percent of New York City and
17 Westchester County's electricity, investing over a
18 billion dollars in upgrades, and paying over
19 $75 million in taxes, and employing over a
20 thousand folks at their facility.
21 Over the last 13 years, the competitive
22 electricity market has led to savings for energy
23 consumers.
24 Wholesale energy prices have declined since
25 restructuring.
99
1 With an all-time low in 2012, an average
2 price of $45.23 per megawatt hour, compared to the
3 previous low of $48.63 in 2009.
4 Reduced air emissions across the state, CO2
5 has been reduced by 37 percent, SO2 by more than
6 94 percent, and NOx by 80 percent.
7 And we also have a much more efficient and
8 reliable system, which I'll touch on later.
9 New York State has also added
10 10,000 megawatts of generating capacity, and over
11 6,000 megawatts of renewable energy across the
12 state.
13 Competition in New York has also transferred
14 the financial risks from the consumers and
15 ratepayers to private investors.
16 It's encouraged innovation and investment in
17 a wide variety of technology sources to maintain
18 this robust system.
19 As a trade association representing wholesale
20 energy generators and suppliers, one of IPPNY's
21 primary goals is to ensure the continued development
22 and enhancement of those competitive electricity
23 markets.
24 Today we're here to talk about the proposed
25 reliability contingency plan, which I'll refer to as
100
1 the "RCP," we believe interferes and harms the
2 competitive nature and the successes of the markets
3 here in New York.
4 The proposed RCP is an unnecessary attack on
5 the marketplace, and harkens back to the days of
6 command-and-control of over 15 years ago.
7 The RCP is furthering the shutting down of an
8 operationally viable, safe, and existing generator,
9 while attempting to give preferential treatment to
10 certain transmission projects at the expense of the
11 public through a guaranteed cost-recovery mechanism.
12 Throughout the Energy Highway process, IPPNY
13 has repeatedly argued that any market intervention,
14 such as the reliability contingency plan proceeding,
15 is contrary to the nature of electric-industry
16 restructuring, detrimental to markets, and chills
17 New York's investment goals.
18 One of the goals of New York State is to be
19 open for business, and in the energy industry,
20 regulatory certainty and consistency are key
21 components to ensuring that private investment is
22 maintained here in New York.
23 The RCP is defective and contains many
24 implementation flaws.
25 Major acts -- aspects of the implementation
101
1 rely on future actions by the State Legislature and
2 the FERC, over which the PSC and other state
3 agencies, such as New York Power Authority, do not
4 have jurisdiction.
5 The RCP does not provide any guidance or
6 alternative solutions if the Legislature does not
7 pass the required legislation.
8 While mentioning FERC, I would be remiss if
9 I didn't mention that FERC has been unambiguous as
10 it relates to mitigating new uneconomic generation.
11 And the important point here is, that
12 ratepayers and consumers could pay twice under this
13 scenario, based on current policy, on how you
14 mitigate uneconomic power.
15 It's very important, as legislators, for you
16 to realize that if uneconomic power is brought into
17 the marketplace, it is very detrimental to the
18 ratepayers here in this state.
19 Touching on the planning process, I think
20 it's safe to say that the New York ISO has experts
21 in the planning area, that do a great job, that deal
22 with the market participants in real time, they
23 realize the problems that the market has, they see
24 what the trends are in the marketplace, and that's
25 how they do their planning process.
102
1 And the planning process that really is going
2 on at the PSC, under the RCP, is really a one-time
3 thing and isn't consistent with how the markets have
4 been run for the last 15 years.
5 Beyond the competitive energy markets and
6 questionable changes to system reliability, the
7 number one question that's been in the room today is
8 "Who will pay for the contingency plan?"
9 The PSC has advocated for a
10 "beneficiaries pay" model, but that determination as
11 to who the beneficiaries are, and what the ultimate
12 cost of this proposal, is unclear.
13 The proposed RCP exposes consumers to these
14 unnecessary costs, and sends non-market investment
15 signals to power-project developers.
16 What ratepayers need to know, that if the
17 project is built through a contract with NYPA, who
18 it is -- who it is expected will be reimbursed by
19 other utilities, and that project is halted for any
20 reason, the developer of the project will not be
21 responsible for its costs.
22 Further -- and, Senator Maziarz, you touched
23 on this this morning -- in its April presentation to
24 parties interested in the RFP, NYPA explicitly
25 stated that, quote, "Seller project developer does
103
1 not bear mitigation risks."
2 So who does bear that risk?
3 Do Senator Ritchie's constituents, does
4 Senator Maziarz's constituents, bear that risk?
5 And I think one of the issues that really has
6 come out of this hearing is the fact that that is
7 undetermined, and it adds value to why we're having
8 this hearing today.
9 When projects are built on market signals,
10 those are primarily built on the backs of investment
11 companies and their board of directors, and not on
12 the ratepayers.
13 I think, in conclusion, what I'd like to say
14 about reliability, I mentioned at the beginning of
15 my statement, is that the July heat wave, I think,
16 showed a new record for demand here in New York.
17 There was excellent performance by the
18 generators and the utilities.
19 The high level of asset availability has
20 never been seen like that before.
21 All units that could be available were
22 available.
23 We had no brownouts -- no significant
24 brownouts or blackouts.
25 And I think, you know, reliability should be
104
1 weighed here, and I think that that is one of the
2 true tenants of the benefits of competition.
3 New York has some of the best competitive
4 energy markets in the state.
5 We shouldn't walk away from those for
6 unneeded or a perceived problem in the energy
7 markets for reliability.
8 Planning is okay, but let's do planning under
9 a structure that actually makes some sense.
10 So with that, Senator, I'll conclude my
11 remarks.
12 SENATOR MAZIARZ: Thank you very much,
13 Mr. Donohue.
14 We appreciate you abbreviating your remarks.
15 Do you think -- I mean, you had high praise
16 for the ISO, and I do too, and their relationship
17 with this Committee has always been very
18 professional and very positive.
19 But do you think that, going through this
20 process with the PSC, and the Power Authority, and
21 all of the other providers, both the private-sector
22 utilities, that they're not taking reliability into
23 consideration?
24 GAVIN J. DONOHUE: I think the ISO certainly
25 is.
105
1 I think the PSC is trying to plan, but I also
2 think that there's a planning process in place that
3 says, We don't need resources till '21, '22.
4 As we heard earlier, this is very unique to
5 this power plant and this situation.
6 What I think is something this Committee
7 needs to realize, is that there's limited capital
8 dollars.
9 And when New York doesn't show that it's open
10 really for business, those dollars are going to
11 Pennsylvania or somewhere else.
12 So, the continued regulatory uncertainty as
13 to how we're going to maintain our energy policy,
14 going forward, this type of proceeding, and the fact
15 that we don't have answers to questions like
16 "Who's gonna to pay?" sends those investments
17 somewhere else.
18 And I think that it's very important for the
19 Committee to understand that.
20 SENATOR MAZIARZ: Thank you.
21 Senator Carlucci?
22 Senator Ritchie.
23 SENATOR RITCHIE: Just one question:
24 Are your members concerned about the
25 precedence that this contingency plan, the way that
106
1 it's been put in motion, the precedence that it's
2 going to set, as far as, you know, this is
3 Indian Point; next time around it could be somebody
4 else?
5 GAVIN J. DONOHUE: There's a lot of problems,
6 you know, with this process, because of the lack of
7 clarity.
8 And I would say, Senator, that we are
9 concerned.
10 SENATOR MAZIARZ: Thank you, Mr. Donohue.
11 Thank you very much.
12 Our next witness is Paul Haering,
13 vice president of engineering and environmental
14 sciences [sic] for Central Hudson Gas & Electric.
15 PAUL HAERING: Good afternoon,
16 Senator Maziarz, Senator Ritchie, Senator Carlucci.
17 My name is Paul Haering.
18 I'm vice president of engineering and system
19 operations for Central Hudson Gas & Electric.
20 In addition, I chair the technical working
21 group of the New York State Assessment and
22 Reliability Study, or what's called "STARS."
23 This is a study of the transmission system,
24 which began in 2008.
25 It was conducted and funded by the state's
107
1 transmission owners, utilizing some expertise from
2 the New York ISO, and a consultant, ABB.
3 The same group of companies is acting
4 together to form what is called the
5 "New York Transco," utilizing the results of the
6 STARS study, and has provided a comprehensive
7 portfolio of projects as part of the Governor's
8 Energy Highway Request For Information process.
9 So, first and foremost, the primary concern
10 related to the retirement of Indian Point, as we
11 have heard this morning, is the reliability impacts
12 on the state transmission system.
13 And there have been several studies that have
14 been identified: the New York ISO studies, as well
15 as the STARS studies.
16 Both of those studies have identified there
17 are transmission security deficiencies of over
18 1100 megawatts with the retirement of that facility.
19 In addition, there are what's called
20 "resource-adequacy issues" and "voltage issues" on
21 the system.
22 In addition, recently, there was an
23 announcement of another generator in the downstate
24 area called "Danskammer" that is going to retire.
25 It had a major damage that was caused as a
108
1 result of "Superstorm Sandy."
2 Those impacts further exacerbate the
3 identified deficiencies.
4 So I think what's important, as we've heard,
5 is that, in order to retire the plant, there needs
6 to be some mitigation or some process in place to
7 address the deficiencies.
8 But I think what's also important is to
9 understand the economic impacts on consumers of the
10 loss of this resource, and that is a significant
11 concern to Central Hudson and its customers.
12 And we see the impacts as really threefold:
13 One is, that there's going to be higher
14 market prices, and I'll talk a little bit about
15 that;
16 There's also the costs associated with these
17 contingency plans;
18 And then, in addition, beginning in the
19 summer of 2014, the NYISO will be implementing
20 what's called a "new capacity zone" in the
21 Lower Hudson Valley, and that will have another
22 dramatic impact on capacity prices for the same
23 consumers that are potentially going to be harmed by
24 the closure of the facility.
25 So when it comes to wholesale market prices,
109
1 the retirements of the Indian Point has been
2 quantified in a study that was performed for the
3 New York State Department of Environmental
4 Protection, by Charles River Associates.
5 That report had identified that the
6 wholesale-price increases of the retirement could be
7 upwards of 1.5 billion annually.
8 In addition, obviously, there's economic
9 impacts with regard to jobs, and the economic
10 benefits of the plant as well.
11 In addition, this contingency-plan case that
12 is -- the PSC has ongoing, first of all, has to
13 identify what the contingency plans are; and then,
14 second, is trying to address how these costs should
15 be allocated.
16 We also -- as these utilities have several of
17 these transmission projects that are included in the
18 proceeding --
19 [Technical difficulties.]
20 -- subject to halting, as we've heard
21 previously.
22 But in addition, NYPA has this RFP process,
23 and we -- also, there are energy-efficiency and
24 demand-response programs that are going to be
25 administered by NYSERDA and Con Edison.
110
1 Although we take no position --
2 Central Hudson takes no position with regard to the
3 decision to retire the plant, we do agree that there
4 needs to be -- we need to be prudent and be prepared
5 for the eventual -- if there is a decision to retire
6 the facility.
7 We also feel it's prudent to move forward
8 with the solutions at a pace that makes them --
9 makes sure they're in place prior to the retirement
10 date, but we also feel that there are certain
11 solutions, that I could characterize as what I'll
12 call "no-regret" solutions.
13 They go beyond the benefits of just
14 addressing the reliability impacts of Indian Point.
15 And some of those are -- what are
16 characterized as these "transmission projects."
17 Several of these transmission projects that
18 are included in this contingency-plan proceeding are
19 also in a separate proceeding in front of the PSC
20 called the "AC Transmission proceeding case."
21 These projects, emanating from Edic,
22 Upstate New York, all the way down to the
23 southeastern portion of New York, will facilitate
24 and ensure that existing generators upstate have
25 ability to serve downstate markets.
111
1 So, the constraints that exist on the
2 transmission system today will be eliminated as a
3 result of these projects.
4 It also goes a long way in addressing the
5 reliability impacts of the Indian Point, if
6 Indian Point were to be shut down.
7 As currently proposed in these proceedings,
8 PSC has two different cost-allocation models, so the
9 same project that's in the AC case has a different
10 cost allocation than what's in the Indian Point
11 case.
12 So we see there's a huge disconnect and issue
13 that the PSC has in front of it, in terms of how
14 it's gone about the process with regard to these
15 proceedings.
16 It is our position that there are these
17 broader benefits with regard to these
18 AC Transmission projects that, arguably, we consider
19 no-regrets, and should be expedited, and allow the
20 state transmission owners, and, eventually, the
21 New York Transco, to begin to build those projects
22 and have them in service as quickly as possible.
23 Regarding the RFP process, Central Hudson
24 feels that the competitive energy markets
25 administered by the NYISO are the best way to ensure
112
1 reliable and low-cost, competitively-priced supply
2 for the state's consumers.
3 As currently proposed, NYPA would enter into
4 bilateral contracts with these project developers;
5 ultimately, then, through reimbursement agreements,
6 pushing costs back onto consumers.
7 As currently proposed, the costs that would
8 flow back to our consumers is about 7 percent of
9 these total project costs.
10 And Central Hudson's a fairly small utility.
11 We're about 3 percent of the load in the
12 state.
13 So, 3 percent of the load, and 7 percent of
14 the cost of these contracts.
15 Also, the full impact of these costs would
16 be -- need to be coupled with the proposed new
17 capacity zone which goes into the -- in effect in
18 the summer of 2014.
19 Right now, the current estimates are, these
20 new capacity-cost prices will raise consumer costs
21 in the Hudson Valley, anywhere from 200 to 350
22 annually.
23 In terms of Central Hudson's customers, about
24 10 percent for residential customers, about
25 15 percent increase in bills for commercial
113
1 customers.
2 We feel that there's other options that could
3 be pursued with existing generators in the
4 Hudson Valley that could significantly mitigate the
5 price impacts.
6 So, Senator Maziarz, Senator Ritchie, and
7 Senator Carlucci, I really appreciate the
8 opportunity to speak to you this morning -- or, this
9 afternoon.
10 We feel this is a critical issue in front of
11 the State, and appreciate the Committee evaluating
12 this.
13 And I'm happy to answer any questions.
14 SENATOR MAZIARZ: Thank you very much,
15 Mr. Haering.
16 We also appreciate your attendance here
17 today.
18 Let me just state, because you went through
19 it rather quickly there:
20 Did I understand you to testify that the
21 closure of Indian Point could have an economic
22 impact on energy rates, by the way of increased
23 costs, to the tune of 1.5 billion annually?
24 PAUL HAERING: That was the number that
25 I read, that was included in the CRA report that was
114
1 done for the New York State Department of
2 Environmental Protection.
3 SENATOR MAZIARZ: And does it indicate how
4 that would be allocated across the state?
5 Would that be just customers -- energy
6 customers within, let's say, Westchester,
7 New York City, the --
8 PAUL HAERING: Senator, I believe the way
9 this --
10 SENATOR MAZIARZ: -- the eastern portion of
11 the state?
12 PAUL HAERING: -- it would be statewide, but,
13 probably, the majority of those costs would be seen
14 in increases in the downstate area.
15 SENATOR MAZIARZ: You understand that that is
16 almost a -- diametrically opposed to what was
17 testified to here earlier today by some previous
18 witnesses?
19 PAUL HAERING: I -- that may have been the
20 case.
21 SENATOR MAZIARZ: Thank you.
22 PAUL HAERING: Okay.
23 SENATOR MAZIARZ: Senator Ritchie?
24 SENATOR RITCHIE: No questions.
25 SENATOR MAZIARZ: Senator Carlucci?
115
1 SENATOR CARLUCCI: No questions.
2 SENATOR MAZIARZ: You know, my colleagues
3 don't have any other questions.
4 I just think that's -- you know, that is the
5 crux of the issue right here, is who's going to pay
6 for it?
7 PAUL HAERING: I agree.
8 And I think the other point is, that there
9 are solutions out there that provide broader
10 benefits.
11 And we feel that some of those solutions
12 would address some of the concerns that both you and
13 Senator Ritchie have, relative to what the benefits
14 are upstate, and allowing the plants upstate that
15 could provide benefits downstate, by relieving the
16 bottlenecks of the transmission system.
17 SENATOR MAZIARZ: I certainly agree with
18 that, and that's why, I can't speak for the other
19 member of this Committee, but this Committee, myself
20 as the Chair of it, have been extremely supportive
21 of the Governor's Energy Highway Proposal.
22 Thank you very much, Mr. Haering.
23 We appreciate it.
24 PAUL HAERING: Thank you.
25
116
1 SENATOR MAZIARZ: Next we're going to have
2 three individuals: James Slevin, Dominic Marzullo,
3 and James Spry.
4 They represent the Utility Workers Union.
5 Thank you very much, gentlemen, for being
6 here today.
7 JAMES SLEVIN: Senator Maziarz,
8 Senator Ritchie, and Senator Carlucci, thank you
9 again today for having us here.
10 I'm not going be long into it, repetitive,
11 and to a lot of statements that were there before.
12 And, I gave a written testimony, submitted in
13 prior, earlier part of this week.
14 With me today I have two vital people in my
15 organization:
16 Dominic Marzullo is a business agent that
17 represents my 400 members that work in Indian Point;
18 And, Jimmy Spry is an executive board member,
19 but also an employee at Indian Point.
20 So, I think they come with a vital message,
21 that you're going to hear from them also.
22 No doubt, this Committee has -- it's great to
23 see what the actions they're looking at, at the
24 contingency plans that are -- that the talk of the
25 economic impact on the ratepayer, but it's also an
117
1 economic impact on the labor side of it.
2 In the jobs that we have at Indian Point, I'm
3 not just a member looking at these membership that's
4 up there, but it's also my other members that work
5 around the system.
6 I represent a lot of generating facilities.
7 I know that they're tired.
8 They're working, they're putting the
9 capacities out they can.
10 I also represent a lot of utility workers
11 that are out on the street, trying to work very hard
12 doing what they do, day in and day out.
13 But this impact of -- if they look to close
14 Indian Point, is also an impact that's going to have
15 on the labor market.
16 And what's going to happen is, is there will
17 be a job loss.
18 If we don't have the power to produce out
19 there to those people that are in Westchester County
20 and the city of New York, those will be impacted
21 greatly.
22 "Greatly."
23 Nobody will come here to build if we don't
24 have that facility and we don't have the generation
25 that goes out there every day in the market.
118
1 You know, some people say that, you know,
2 with decommissioning, that there would be jobs
3 there.
4 Well, I can tell you from a sister local out
5 in California, San Onofre, there was 1600 jobs, down
6 to 400 jobs.
7 They were only temporary jobs until they
8 finally closed that plant down.
9 But there is a tremendous impact,
10 economically, to my membership, and the labor market
11 out there.
12 So like I said earlier, I'm not gonna keep it
13 long here.
14 SENATOR MAZIARZ: Thank you.
15 JAMES SLEVIN: I have great members out
16 there.
17 I want you to listen to the testimony of
18 Dominic Marzullo.
19 SENATOR MAZIARZ: Mr. Marzullo.
20 DOMINIC MARZULLO: Good afternoon,
21 Senator Maziarz, Senator Ritchie, and
22 Senator Carlucci.
23 Thank you for having me here.
24 My name is Dominic Marzullo.
25 I'm a business agent for the Utility Workers
119
1 Union of America, Local 1-2, which represents 400
2 men and women who work at Indian Point.
3 Indian Point has been the most extensively
4 inspected nuclear plant in history.
5 It has received the NRC's highest safety
6 rating of "green" for 8 years in a row.
7 In addition, the NRC's inspection of
8 Indian Point has undergone an in-depth,
9 comprehensive evaluation by independent panel made
10 up of experts in the nuclear safety, emergency
11 preparedness, and public policy.
12 The panel's conclusion was, that Indian Point
13 meets all NRC requirements, and that the planned
14 safety systems are both well-maintained and
15 reliable.
16 When I was a designer at Indian Point,
17 I designed the installation of radiation monitors
18 throughout the Unit 2 facility.
19 Safety is paramount to me, and I am proud of
20 the work I did.
21 I accept nothing less than excellence at
22 Indian Point.
23 Since acquiring Indian Point a decade ago,
24 Entergy has invested hundred of millions of dollars
25 in safety technology and security upgrades for the
120
1 plant.
2 If there were any concerns for our members'
3 safety at Indian Point, at any time, in any way,
4 you [sic] can assure you that Local 1-2 would be in
5 the forefront of demanding the safe operation of the
6 facility.
7 In addition, to all of our members in the
8 Indian Point, of course, work close to the plant;
9 therefore, they will be the first to be affected by
10 any safety problems.
11 In addition, most of the men live quite
12 close.
13 They certainly would immediately raise any
14 concerns that they had about the plant's safety, as
15 any problems would greatly impact themselves and
16 their families.
17 What I am happy to note, that there's, no
18 time, has ever been any problems.
19 We wouldn't let it happen.
20 The safety of our members and the public is
21 our first order of business.
22 Indian Point is a vital resource.
23 It would be devastating that it should not be
24 relicensed.
25 Thank you very much.
121
1 SENATOR MAZIARZ: Mr. Spry.
2 JAMES SPRY: Senator Maziarz and members of
3 the Committee, thank you.
4 My name is James Spry.
5 I'm a member of the executive board of Local
6 1-2, and I work at Indian Point.
7 Just a little bit about my background:
8 I was in the nuclear navy for nine years.
9 I served aboard the USS Carl Vincent and the
10 USS Nimitz.
11 I was a reactor operator on those ships.
12 I also worked at a facility close to Miami,
13 Turkey Point, for 3 1/2 years as an instrumentation
14 specialist.
15 And I've worked at Indian Point for 23 years
16 as an operator, and I'm now a planner there.
17 I am an advocate for nuclear power, at
18 Indian Point, and this country, so you know that.
19 I would like to add some common sense to the
20 debate surrounding Indian Point, in the hope that it
21 will help its continued operation and lead to its
22 relicensing.
23 The fact is, if I and my fellow workers at
24 Indian Point were not confident about the operation
25 and safety of the facility, we would not work there.
122
1 We, obviously, would be the first ones
2 impacted if there were any safety problems.
3 I live nearby the Indian Point, within
4 3 miles of the plant.
5 I've lived there since 1993.
6 And I also lived there from '87 to '89 in
7 another stint there.
8 My kids go to school there.
9 I have other relatives that live right there
10 in that town and they've all gone to school.
11 Both of my boys were born in the area.
12 If there was the slightest concern in our
13 minds as to the plant's safety, do you think any of
14 us would live there or have our families live
15 anywhere near the plant?
16 We work very hard every day to make sure that
17 Indian Point is run safely, as that is in the best
18 interests of ourselves, our families, and all
19 New Yorkers.
20 We want the people of this state and our
21 state government to realize that we would not do
22 anything which would endanger the people of
23 New York, and would be the first to warn the public
24 if there were any danger from the Indian Point
25 plant.
123
1 That's the common sense we are looking for as
2 we, the real experts, witness ideological and almost
3 hysterical opposition to this safe, clean source of
4 power.
5 With no real energy plan in sight, please
6 consider that Indian Point directly supports
7 11,000 jobs in the Hudson Valley, in addition to the
8 1200 employees there.
9 Just think of the devastation that would be
10 caused should nearly 14,000 New York families find
11 themselves out of work.
12 That's the grim picture that awaits us all if
13 Indian Point closes.
14 And please keep in mind that we would be the
15 first to blow the whistle if there were any real
16 danger from the operation of Indian Point.
17 JAMES SLEVIN: So as you heard from the
18 testimony here, my members' safety is a vital, vital
19 issue to them, day in and day out; to them and their
20 families.
21 And it's an important message we bring from
22 the Local back out to them.
23 And, we will undertake any questions you may
24 have.
25
124
1 SENATOR MAZIARZ: Thank you very much,
2 Mr. Slevin, Mr. Marzullo, and Mr. Spry.
3 I have to say that, I believe it was at
4 Senator Carlucci's request, I don't think
5 Senator Ritchie was in the Senate at the time, that
6 we did visit Indian Point for a tour.
7 I was very impressed with the workforce
8 there, with the safety procedures that were in
9 place.
10 We also did have a meeting with individuals
11 on both sides of this issue, much like this, right
12 there in -- in, I believe it was Rockland County.
13 I'm not sure which town it was --
14 SENATOR CARLUCCI: Stony Point.
15 SENATOR MAZIARZ: -- Stony Point, yes.
16 We did do that.
17 But I have to say, that we have reached out,
18 we have visited there.
19 And the members of the Committee, again,
20 I think I can speak, that they were most impressed
21 with the workforce there.
22 And, you know, we are -- we are -- are -- by
23 this hearing, by that hearing, by that meeting, by
24 visiting there, you know, we are looking to gain the
25 type of information from all sides on this
125
1 particular issue.
2 So, I really don't have any questions.
3 Senator Carlucci, if you'd like to?
4 SENATOR CARLUCCI: Yeah, just a question:
5 The workforce, what's the average salary of a
6 member at Indian Point?
7 JAMES SLEVIN: The average salary is about
8 $900,000 a year -- uh, I mean, $90,000 a year.
9 [Laughter.]
10 SENATOR MAZIARZ: I was just about ready to
11 move.
12 [Laughter.]
13 SENATOR CARLUCCI: I think we heard from
14 James Spry about your level of experience.
15 What is the typical level of experience of an
16 employee in the union?
17 Is it as extensive as Mr. Spry, or, do you
18 have entry-level employees?
19 JAMES SLEVIN: Yeah, we represent -- our
20 union represents, from water companies, to
21 generating companies, to utility companies, out
22 there, so it all varies into it.
23 But, some come from background in the
24 military, and some come from just right off the
25 street.
126
1 We do pride ourselves on trying to take
2 people from the state of New York, and try to make
3 sure that we get jobs coming into New York.
4 SENATOR CARLUCCI: How many members do you
5 have in New York State?
6 JAMES SLEVIN: Close to 9,000.
7 SENATOR CARLUCCI: And you have 400 at
8 Indian Point?
9 JAMES SLEVIN: Yes.
10 SENATOR CARLUCCI: Okay.
11 But at Indian Point, what's the level of
12 expertise, in terms of --
13 JAMES SPRY: I would say we have a
14 super-experienced crew.
15 I mean, our average age has got to be
16 mid-40s.
17 Most people -- a lot of the operators came
18 from the military, military background.
19 And some came from, you know, different
20 institutions, and they got trained there.
21 But, most of the people have extensive
22 experience in nuclear power.
23 SENATOR CARLUCCI: So it's not like this
24 would be the first facility you would work at?
25 In terms of representing utility workers,
127
1 there's not really that much entry-level positions
2 in your union at Indian Point?
3 Or --
4 JAMES SLEVIN: Occasionally, in a maintenance
5 side or a warehouse side, you may have those entry
6 levels.
7 We don't do the hiring.
8 Entergy does the hiring.
9 But we make sure that they look for a skilled
10 person, because, in our union, we really pride
11 ourselves on competent, skilled people.
12 SENATOR CARLUCCI: So it sounds like you have
13 to be highly skilled, have a certain level of
14 experience.
15 So if the facility were to close, I take it
16 that the employees here wouldn't look for other work
17 in the area.
18 They would look for work in a nuclear power
19 facility.
20 Is that correct?
21 JAMES SLEVIN: That would probably be, yeah.
22 I mean, it's not as easy going into a regular
23 generating facility and just learning that.
24 It's a different atmosphere.
25 SENATOR CARLUCCI: Thank you.
128
1 SENATOR MAZIARZ: As I recall, there was a
2 pretty extensive training facility, though, for
3 incoming employees when they were hired, by --
4 I remember --
5 DOMINIC MARZULLO: Yes, there is, but there's
6 ongoing, yearly, people have to, you know, requalify
7 and get their training.
8 You know, on and on.
9 Especially the operators, they go to classes
10 every year.
11 You know, these are people that actually turn
12 the wrenches and, you know, have the plant
13 operating.
14 So, they're constantly being retrained.
15 JAMES SLEVIN: Yeah, I mean, they, uh -- like
16 Dominic had said, we negotiate a lot of training for
17 them.
18 We make sure that they get, always part of
19 their skills, and enhanced, and further technology,
20 and things like that.
21 So, it's always ongoing.
22 It never has stopped.
23 No companies really come to us, because, the
24 energy market is changing, day in and day out, and
25 they want to make sure they're competitive in it.
129
1 SENATOR CARLUCCI: How many different unions
2 are represented at Indian Point?
3 JAMES SLEVIN: Oh, from millwrights, to
4 plumbers, to carpenters; there's a multiple.
5 SENATOR CARLUCCI: But you're the largest?
6 JAMES SLEVIN: We represent majority of the
7 employees up there, yeah.
8 SENATOR MAZIARZ: Senator Ritchie?
9 SENATOR RITCHIE: I have a couple questions.
10 As far as the longevity of your -- the
11 members that are there, when one of your members
12 goes to work at the facility, do they usually stay
13 the duration, or do they usually look for other
14 employment?
15 JAMES SLEVIN: No, they enjoy working there.
16 They feel safe and secure there.
17 And they -- most of them come in and want to
18 retire from the facility.
19 JAMES SPRY: What I would say is that,
20 I worked at Turkey Point in, uh -- south of Miami.
21 And when I worked there, they had a turnover
22 rate of 50 percent in, like, 2 years.
23 No one's from there.
24 A lot of the people come from out of state,
25 they go there and get trained, and they take off,
130
1 you know, because they're not from Miami or that
2 area.
3 But here at Indian Point, we get very few
4 people that leave once they are employed and get
5 settled in.
6 We have very few defections after hire.
7 SENATOR RITCHIE: Do you have a number of
8 people who are actually seeking employment at the
9 facility?
10 JAMES SLEVIN: Oh, yeah.
11 We get it all the time.
12 The utility workers, it's a great skilled
13 market to be in.
14 A lot of young men coming out of high school
15 and, you know, looking for employment, it's a great
16 field, it's a moving field.
17 All of my facilities that I represent, I do
18 get a good number of --
19 JAMES SPRY: Well, as we speak, there are
20 plans to bring in 18 new employees, and that would
21 be at entry level, in the maintenance area.
22 We have constantly brought in operators,
23 because the licensed operators are -- you know, you
24 have to have those to operate the facility.
25 And they've been -- we've been bringing them
131
1 in for years.
2 But, we haven't hired any new maintenance
3 people in a while, maybe within ten years.
4 And, they've interviewed, and they're ready
5 to hire, I believe, eighteen, as we are talking now.
6 SENATOR RITCHIE: I guess just a comment,
7 that because I have three nuclear facilities in my
8 district, I can say wholeheartedly that, the
9 community, this is one of the places that are
10 premium jobs, that those, you know, are looking to
11 get into.
12 And once they get there, they stay until they
13 retire.
14 And, so, I just -- as an observation, just
15 would like to say, not to take it lightly when we
16 were talking about these jobs, because it's not just
17 a job.
18 These are jobs, at least from my perspective,
19 that people strive for, that provide in salary, that
20 is something that you can sustain your family on,
21 something that you work to achieve.
22 It's not -- it's not just a job; it's a
23 career.
24 JAMES SLEVIN: Yeah, and I agree with that,
25 Senator Ritchie.
132
1 It's, also, we don't just look at our
2 membership as jobs.
3 We look at families, and growths of families.
4 I mean, there's a lot of my members have --
5 don't live far from the plant.
6 I don't live that far.
7 I live just north of it.
8 And it's a great place to bring people up.
9 And I see a lot of my members doing the same
10 thing: starting their careers, and starting
11 families, and making a better life for them and
12 their children.
13 Yeah.
14 SENATOR MAZIARZ: Thank you very much,
15 gentlemen.
16 JAMES SLEVIN: Thank you.
17 SENATOR MAZIARZ: Our next witness is
18 Darren Suarez of The Business Council.
19 Darren.
20 Mr. Suarez.
21 Thank you very much, Mr. Suarez.
22 We appreciate The Business Council testifying
23 here today.
24 DARREN SUAREZ: Thank you, Senator Maziarz,
25 and thank you Senator Ritchie and Senator Carlucci,
133
1 for having us here today, and for the opportunity to
2 speak about Indian Point, and really to address the
3 PSC proceedings.
4 As stated, I am Darren Suarez, the director
5 of government affairs for The Business Council.
6 I appreciate the opportunity to speak with
7 you.
8 I'm appearing before you on behalf of the
9 members of The Business Council in New York State to
10 once again express our opposition of the
11 Public Service Commission's current pursuit of an
12 Indian Point contingency plan.
13 The Business Council is the leading business
14 organization in New York State representing the
15 interests of large and small firms throughout the
16 state, through the -- though, 72 percent of our
17 members are small businesses.
18 All totaled, our members employ more than
19 1.2 million New Yorkers.
20 The commission's current course to fast-track
21 an expensive, economically unsustainable contingency
22 plan for the potential retirement of Indian Point is
23 predicated on unsubstantiated beliefs regarding the
24 relicensing of Indian Point.
25 The commission's current course of actions
134
1 has already cost ratepayers substantially, and has
2 the potential to cost ratepayers substantially more,
3 while the probability of Indian Point's imminent
4 closure appears remote.
5 The Business Council, on numerous occasions,
6 has urged the commission to halt the current
7 proceedings before additional economic damage is
8 done to the ratepayers of the state of New York.
9 Moreover, the commission, instead, should
10 commit to advocating for the relicensing of
11 Indian Point because of the undeniable importance
12 the facility has had on the delivery of clean, safe,
13 reliable, and affordable energy.
14 The New York State Business Council is proud
15 to join with the broad and diverse support for the
16 Indian Point in New York.
17 Numerous polls have demonstrated that the
18 Westchester community is generally favorable towards
19 Indian Point.
20 Indian Point is a safe facility, and it is --
21 its continued operation has proven positive impacts
22 on jobs, the economy, and the environment.
23 The Business Council is deeply troubled that
24 the current future ratepayer costs resulting from
25 the proceeding on a motion to -- of the commission
135
1 to review generation retirement plans, and that
2 The Business Council has long held that the
3 affordable energy rates are vital to the growth of
4 New York's economy, particularly the manufacturing
5 sector.
6 The commission -- the Indian Point
7 contingency plan has been established by the
8 commission to cost consumers $811 million.
9 The costly, unnecessary trial balloon assumes
10 the State will somehow prevail before the
11 Nuclear Regulatory Commission and close New York's
12 largest power generator, the Indian Point nuclear
13 power station, which produces 11 percent of the
14 state's electricity.
15 The current contingency plan requires
16 ratepayers to subsidize whatever costs are incurred
17 even if Indian Point's licensure is renewed and the
18 projects are left unfinished because they are no
19 longer necessary.
20 The PSC has already authorized nearly
21 10 million in expenditures to study the proposal,
22 a cost the that Downstate New York and New Yorkers
23 will pay through their energy rates.
24 New York's ratepayers could be left on the
25 hook for hundreds of millions of dollars in
136
1 undeveloped, mothballed, useless projects.
2 Most troubling is that the Indian Point
3 contingency plan is predicated on the rejection of a
4 critical component of our energy infrastructure
5 which is owned and operated safely by a private
6 company who has made significant investments in the
7 state of New York.
8 Ratepayers should not be paying for plans or
9 asked to subsidize the elimination of Indian Point
10 when Indian Point should not cease to operate.
11 Indian Point is essential to the
12 affordability and reliability of electricity in
13 New York.
14 The license-renewal process has been
15 approached on two tracks: one of those reviews, the
16 safety; and the other, the environmental issues.
17 An application must provide -- an applicant
18 must provide the NRC an evaluation that addresses
19 the technical aspects of the plant's aging, and
20 describe the ways that those effects is managed.
21 It must also prepare an evaluation of the
22 potential impacts on the environment that the plant
23 operates for another 20 years.
24 The NRC reviews the application and verifies
25 the safety and evaluation through inspections.
137
1 The State of New York has not supported the
2 license renewal, and the State has publicly opposed
3 the license renewal, because of concerns regarding
4 the close proximity of the facility to a population
5 area and to environmental concerns.
6 Pursuant to the NRC relicensing process,
7 energy needs -- Entergy has applied to the State
8 Department of Environmental Conservation for the
9 issuance of a water-quality certificate permit.
10 DEC, in 2010, after extensive submittals by
11 Indian Point, refused the issuing of the permit,
12 arguing that the plant's everyday operations and
13 effluents present an ongoing risk to the people and
14 wildlife.
15 Entergy has appealed the decision, and that
16 process is ongoing.
17 One specific concern the DEC has, is that
18 they're focused upon the impingement and
19 entrenchment and heat shock to numerous fish species
20 in the Hudson River.
21 The dangers to fish -- the danger to fish is
22 more substantial.
23 The plant's swallows and expels -- the plant
24 takes in 2.5 billion gallons of water per day to
25 cool its generation facilities.
138
1 To address the impingement and entrenchment
2 and heat shock, DEC has suggested the development of
3 the construction of cooling towers.
4 The retrofitted cooling towers for a nuclear
5 facility is without general precedent.
6 To place cooling towers on the site, the
7 company would have to blast 2 million cubic yards of
8 rock and granite over a period of four years in
9 order to make the space for the towers that are the
10 size of two Yankee Stadiums.
11 The conversion alone to the plant would cost
12 $1.1 billion in construction and would last until
13 2029.
14 Additionally, the facility would be down a
15 year without producing electricity, resulting in
16 additional significant loss.
17 As an alternative to the cooling towers at
18 Indian Point, Entergy has proposed the development
19 of cylindrical wedge-wires (CWW) screens that will
20 protect a greater number of fish eggs and larvae
21 than the cooling towers over the 20-year license
22 period.
23 From the -- for Indian Point to install
24 wedge-wire technology, it could take three to
25 five years, and cost $200 million.
139
1 Thus far, DEC has rejected the CWW screens as
2 an available technology, in part, because there are
3 no applications of CWW screens on nuclear
4 facilities, but, the uncertainties associated with
5 DEC's proposed cooling towers are far more
6 technically significant than those with CW [sic]
7 screens.
8 Thus, the DEC's position on the availability
9 of CW [sic] screens at Indian Point is inconsistent
10 with DEC's position on the availability of cooling
11 towers at Indian Point.
12 In conclusion, I leave you with a quote from
13 the New York City Department of Environmental
14 Protection's commissioned report, by the
15 Charles River Associates, "Indian Point Retirement
16 Economic Analysis."
17 "Every replacement option studied will result
18 in a cost of an increase to energy consumers through
19 the state, either through the increased market
20 prices or subsidies to new generators.
21 If the market is allowed to function without
22 subsidies for new generation, consumer prices will
23 see marked increases.
24 The market would see wholesale cost increases
25 of approximately $1.5 billion per year; or, roughly,
140
1 10 percent increase in our base-case scenarios.
2 New York City consumers would pay
3 approximately $300 million per year for wholesale
4 energy; or, approximately, a 5 to 10 percent
5 increase.
6 Indian Point's retirement will force greater
7 reliance on fossil-fueled generations resources,
8 increasing the sensitivity of electricity prices to
9 volatility in natural gas prices."
10 Thank you very much for this opportunity to
11 speak with you today.
12 SENATOR MAZIARZ: Thank you, Mr. Suarez.
13 We appreciate the position and the opinion of
14 The Business Council.
15 Senator Ritchie, any comments or questions?
16 SENATOR RITCHIE: Just a couple of questions.
17 Darren, how significant a factor are energy
18 costs when a business is looking to either expand or
19 to locate in New York State?
20 DARREN SUAREZ: They're a significant factor
21 in businesses choosing to be here, to locate, but,
22 also, continued operations.
23 And, that's, more and more of our facilities
24 are competing against other facilities, on an
25 international basis, even in their own -- and even
141
1 in their own company.
2 And it is a major contributing factor as to
3 where they will locate.
4 SENATOR RITCHIE: How do you feel this
5 proposal to shut Indian Point down would affect
6 businesses looking to either expand or to locate
7 here?
8 DARREN SUAREZ: It's gonna have a -- it --
9 certainly, the uncertainty associated with it will
10 have a chilling effect for those that are projecting
11 out what their costs would be.
12 And it will -- and the 811 million that's
13 projected to be in the PSC's costs for replacement
14 will have an effect on where companies choose to be.
15 SENATOR MAZIARZ: Thank you very much,
16 Mr. Suarez.
17 We appreciate it.
18 Next, we're going to hear from, one at a
19 time, but two former members of the New York State
20 Assembly, Jerry Kramer, from the Affordable,
21 Reliable Energy Alliance; and, John Ravitch, of
22 The Business Council of Westchester County.
23 Good morning, Mr. Kramer.
24 Thank you for being here.
25 ARTHUR "JERRY" KRAMER: Chairman Maziarz,
142
1 Senator Ritchie, Senator Carlucci, you know, you've
2 heard a lot today, and I'm going to sort of harken
3 back to the days when I sat on your side of the
4 rostrum, as to the questions that I think have been
5 raised that I think are very legitimate for the
6 Legislature to consider in evaluating this
7 particular proposal.
8 The very resolution by which the
9 Public Service Commission imposed this new mandate
10 on Consolidated Edison has as its language that
11 it's, quote, "increasingly apparent that
12 Indian Point," you know, "is in jeopardy of
13 closing."
14 And, clearly, the Public Service Commission
15 is not listening to the Charles River, the various
16 studies, and listening to the company.
17 There's no dialogue going on between the
18 Public Service Commission and the utility, to ask it
19 exactly what its potential position is, but, you've
20 heard it today.
21 I don't envy Consolidated Edison under these
22 circumstances, because they're sort of in the
23 position of Woody Allen's old line about, "The lion
24 and the lamb shall lie down, but the lamb won't get
25 a good night's sleep."
143
1 [Laughter.]
2 ARTHUR "JERRY" KRAMER: The problem that you
3 have here, is that Consolidated Edison continues to
4 have an ongoing relationship with the Public Service
5 Commission, and they're not in very much of a
6 position to say, That we're not going proceed to do
7 exactly what you're mandating on us.
8 But, let's look what they're really mandating
9 on Con Ed and the ratepayers.
10 $811 million is the number that's in the
11 PSC resolution.
12 So, let's start out with that at base.
13 And we've also heard today that there's a
14 halting procedure, and we can stop at any particular
15 point.
16 When you stop contracts of the magnitude that
17 are involved here, there are penalties involved.
18 The contract just doesn't end because you
19 say, As of midnight tomorrow, this contract ceases
20 to be operable.
21 Secondly, whoever heard of projects of this
22 nature without costs overruns?
23 They just don't happen.
24 They happen in all types of municipal work,
25 and they happen in this type of work of this
144
1 magnitude.
2 So I think what you're faced with here, is
3 that this is an open-ended cost for all of the
4 ratepayers in New York State, from Buffalo to
5 Montauk Point.
6 And there's just no rationale that -- and
7 there's nothing in here that's a limiting factor as
8 to what these costs are.
9 I know Senator Maziarz said we've had these
10 discussions in other forums, but this money would be
11 better spent on strengthening the grid, actually
12 making the grid work.
13 It's nice to build a windmill if they let you
14 in some part of New York, but it only connects to
15 the library, and about a mile away, and that's as
16 far as the energy goes.
17 And we're not wheeling energy in and out of
18 this state in an easy fashion.
19 So, you know, with respect to the
20 Public Service Commission's mandate on Con Ed, it
21 really is very open-ended.
22 And being the purpose of this hearing, is to
23 look at ratepayer costs and competitive markets.
24 I think we have to keep in mind that there's
25 a lot more information that I think that the Panel
145
1 should be privy to from the Public Service
2 Commission as this moves forward, and talking to
3 Con Ed.
4 By the way, Con Ed is going to spend
5 $375 million to harden the grid.
6 I consider that a meaningful expenditure.
7 As will other utility companies around the
8 New York State in the next year or two, to try to
9 make the grid more, if you will, sustainable, should
10 we have another 100-year storm, and another
11 blackout, which was 10 years ago.
12 I think there's another problem here, and
13 that's got to do with, the two of you were not in
14 the Legislature when the Shoreham debate took place,
15 but why isn't there, as a component in this PSC
16 study, the environmental impact of a closing?
17 Today, if you get a Long Island Power
18 Authority bill, there's still a line on there that
19 says "Shoreham Plant," so that the people of
20 Long Island are continuing -- and the Rockaways, are
21 continuing to pay for the closing of the Shoreham
22 nuclear power plant.
23 Aside, you know, you've heard from the union
24 representatives with respect to the number of people
25 who are gonna lose their jobs, but the economic
146
1 impact throughout the region, from Indian Point,
2 according to the Nuclear Energy Commission study
3 some years ago, is $750 million a year.
4 You're talking about all of the different
5 vendors and others who rely on Indian Point, and
6 that goes far beyond the Westchester region.
7 So, how can you ignore the concept of what
8 would happen if Indian Point closed, and not
9 remember the debacle of Shoreham, which still, to
10 this day, lingers in that region, and the people are
11 paying the price for it.
12 Municipalities overtaxed the facility, when
13 it wasn't even opened.
14 I can be almost sure, that in the case of
15 Indian Point, municipalities and surrounding region
16 have taken their fair share of taxes from utility
17 companies, as they always do.
18 So you've got this other factor, which is the
19 Shoreham nuclear facility, how you can ignore
20 history?
21 It means, unfortunately, that we're doomed to
22 repeat it.
23 I think, also, the only part of the
24 Charles River Study that was not mentioned this
25 morning, was the one that New York consumers will
147
1 pay between 10 and 12 billion more in higher
2 electricity costs through 2030.
3 That's a pretty astounding number as a result
4 of closing of one facility.
5 And the last point I want to make is, is my
6 continuing concern, on behalf of our organization,
7 and as a person who served on your side of the
8 rostrum, what kind of signals are New York State
9 sending to the people who are sitting in Chicago on
10 a couple of billion dollars worth of money, who want
11 to invest in energy?
12 New York right now is sending out the
13 following signals:
14 No hydrofracking.
15 Wind is opposed.
16 No nuclear.
17 And the real question becomes, is, you know:
18 Do we really -- you know, we can have an
19 energy highway, but who wants to drive on it?
20 I said, so the real question is:
21 We have to reach the point in time where
22 we're starting to send positive signals about
23 investing in New York.
24 And this particular type of thing,
25 encouraging, you know, in effect, on the part of the
148
1 State, the closing of a facility, not understanding
2 the economic impact of it, really is, What message
3 are we sending?
4 I mean, the fact of the matter is, you know,
5 Senator, you mentioned about the wind project in
6 your district.
7 A proposal was made by the Long Island Power
8 Authority to build a windmill 5 miles off of
9 Jones Beach, and over a thousand people showed up at
10 each of the hearings in opposition to it, because
11 they claimed it would cause visual destruction of
12 their view of the ocean.
13 And that got a thousand people to come out
14 and oppose it.
15 So the answer is:
16 There's a big global decision that we all got
17 to make; and that is, you know, What message is
18 New York going to continue to send to the rest of
19 the country, when we want them to invest here?
20 And this PSC project, if you will, which
21 I guess is, sort of, almost like a shotgun wedding,
22 surely isn't particularly good for the people in
23 New York State.
24 And it's the kind of thing that, hopefully,
25 your Committee will get into it a lot more deeper,
149
1 because I think the long-range costs go far beyond
2 $811 million.
3 That's -- that's my testimony.
4 SENATOR MAZIARZ: Thank you very much,
5 Mr. Kramer.
6 Some very good points were made.
7 I think it's fair, the comparison with the
8 Shoreham and the closure there.
9 I appreciate that.
10 And I can tell you that -- that the reason
11 we're having this hearing here today, and we've had
12 other hearings, and we visited Indian Point, and, we
13 have listened to those people who want -- are in
14 favor, I should say, of closing Indian Point, and
15 they'll be testifying later on today, we're
16 interested in all opinions and all aspects of this,
17 but we certainly are very concerned about the effect
18 on jobs, on businesses, and on energy rates, because
19 of exactly what you pointed out, the ability of
20 people to invest in the state of New York.
21 Senator Ritchie?
22 SENATOR RITCHIE: No, no questions.
23 SENATOR MAZIARZ: Thank you very much.
24 ARTHUR "JERRY" KRAMER: Thank you for your
25 time.
150
1 SENATOR MAZIARZ: Thank you very much,
2 Mr. Kramer.
3 John Ravitch, executive vice president & CEO
4 of The Business Council of Westchester.
5 JOHN RAVITZ: Good afternoon.
6 SENATOR MAZIARZ: Thank you very much,
7 Mr. Ravitz.
8 JOHN RAVITZ: Senator Ritchie, how you are
9 you?
10 SENATOR MAZIARZ: I thought I'd point out
11 earlier that you and Mr. Kramer were both former
12 members of the Legislature.
13 It didn't seemed to go over so well, so...
14 [Laughter.]
15 SENATOR MAZIARZ: And both members of the
16 Assembly, too.
17 Something that neither Senator Carlucci,
18 Senator Ritchie, nor myself had the pleasure of ever
19 serving there.
20 JOHN RAVITZ: Well, it was always a pleasure
21 seeing you walking through the Chamber.
22 Lots of fresh air.
23 The hat that I wear now, I'm the
24 executive vice president and COO for The Business
25 Council of Westchester.
151
1 The BCW is the county's largest and most
2 influential business membership organization.
3 We represent about thousand members, ranging
4 in size from the multi-international corporations
5 and mid-sized businesses, to professional firms,
6 not-for-profit organizations, and small business
7 owners, in every sector of the county's diverse
8 economy.
9 I want to just piggyback on what Mr. Kramer
10 talked about, and really drill down a little more,
11 in terms of what the impact would be in
12 Westchester County if Indian Point were to close.
13 And to do that, I have left with you,
14 Mr. Chairman and Senator Ritchie, a report that
15 The Business Council of Westchester commissioned
16 last September on an assessment of energy needs in
17 Westchester County, and how it would affect the
18 county, how it would affect our economy, and how it
19 would affect, obviously, the individual residents of
20 Westchester County.
21 And I just want to share a few specifics that
22 came out of this report, that I think are important
23 for the record, if Indian Point were to close.
24 Electric rates would increase by 6.3 percent
25 or more, with consumers paying more than
152
1 $374 million per year in added electrical bills.
2 By 2020, the probability of electrical
3 outages would increase by 280 percent.
4 Carbon emissions, a leading contributor to
5 global warming, would increase by more than
6 6 million tons annually, which is the equivalent of
7 adding 1 million more vehicles on our roads in
8 Westchester County.
9 As a result of higher electrical rates and
10 the closure of Indian Point, Westchester County
11 would lose more than 3300 jobs, many of them
12 high-paying jobs, representing over $200 million per
13 year in lost wages.
14 Westchester County would also lose
15 $75 million per year in property tax and revenue
16 sharing with the State.
17 And, contributions to local charitable
18 organizations would decline by $2 million annually.
19 Overall, the downstate regional economy would
20 be drained by some $11.5 billion, and that's
21 inflation-adjusted numbers.
22 As you know, Indian Point currently provides
23 2,065 MW of electric generations for Westchester and
24 the New York City area, producing over
25 16 billion kilowatt hours per year.
153
1 This represents 59 percent of Con Ed's retail
2 electrical sales, and 25 percent of all electrical
3 sales in New York City and Westchester.
4 The BCW report noted that, currently, there
5 are no plans by any entity, public or private, to
6 replace those electrical energy and capacities
7 produced by Indian Point plants.
8 And the report stated, quote, "Projected
9 energy efficiency, demand-side management, and
10 renewable resources cannot be added in time to
11 offset the output of Indian Point, at least for
12 foreseeable future."
13 So I will leave the full report for you and
14 other members of the Committee to review, and,
15 obviously, if you would have any follow-up
16 questions.
17 I would be remiss, Mr. Chairman, and
18 I understand Senator Carlucci had to leave, because
19 he mentioned the issues of evacuation and safety
20 plans.
21 Prior to joining the BCW, I served as the CEO
22 for the American Red Cross in Westchester County;
23 and, also, the COO for the Red Cross in New York --
24 Greater New York region.
25 That gave me the opportunity to not only
154
1 observe, but to participate in many training
2 exercises that the staff of Indian Point put on, and
3 asked for the Red Cross's involvement in those
4 tabletop exercises.
5 They were thorough.
6 They went through a lot of different
7 scenarios that needed to be gone through.
8 They reached out to those of us who would be
9 serving as first responders, and the other
10 organizations that would play a key role, if an
11 evacuation plan had to be put into place.
12 And it also showed me, that they had not only
13 put in the resources for these plans, but other
14 resources as well for the community at large.
15 So, during those 4 1/2 years at the
16 American Red Cross, serving as the CEO in
17 Westchester County, the transparency, the working
18 relationship on a daily basis, I know is very strong
19 with the local county municipalities that would be
20 involved, as well as the state and federal agencies.
21 So, I just wanted to, I would be remiss
22 again, if I didn't have the opportunity to share
23 that with you as well.
24
25
155
1 SENATOR MAZIARZ: Thank you, Mr. Ravitch.
2 We appreciate that.
3 Senator Ritchie?
4 SENATOR RITCHIE: No, no questions.
5 Thank you.
6 SENATOR MAZIARZ: Thank you very much, John.
7 JOHN RAVITZ: Thank you.
8 SENATOR MAZIARZ: Appreciate it.
9 You said, pretty much, what some previous
10 speakers have said.
11 So, we're now going to go, and I apologize in
12 advance if I mispronounce his name,
13 Phillip Musegaas, from the Hudson River Program,
14 director of Riverkeeper.
15 Philip.
16 Philip, I'm sorry.
17 How did I do?
18 PHILLIP MUSEGAAS, ESQ.: That's quite all
19 right.
20 You did fairly well.
21 SENATOR MAZIARZ: Okay.
22 PHILLIP MUSEGAAS, ESQ.: It's Musegaas.
23 SENATOR MAZIARZ: Musegaas.
24 Boy, I didn't do good at all.
25 PHILLIP MUSEGAAS, ESQ.: I've heard a lot of
156
1 worse, so...
2 Thank you.
3 SENATOR MAZIARZ: Thank you very much for
4 being here today, Phillip.
5 We appreciate, your organization, your
6 willingness to come here and testify, certainly.
7 PHILLIP MUSEGAAS, ESQ.: Thank you, Senator.
8 We appreciate the chance to -- for
9 Riverkeeper to provide our perspective on the
10 Public Service Commission's contingency planning,
11 and also to respond to some of the questions that
12 you raised in a letter to us, inviting us to testify
13 today, which I'll get to at the end of my testimony.
14 And I'll abbreviate the written testimony
15 I submitted.
16 I would like to take a couple of minutes at
17 the end to --
18 Thank you.
19 -- to respond to some of the earlier comments
20 that were made today.
21 That's maybe one benefit of going almost
22 last, is that you can listen to other folks testify,
23 and have some -- hopefully, some constructive
24 responses.
25 SENATOR MAZIARZ: Sure.
157
1 Sure, thank you.
2 We appreciate it.
3 PHILLIP MUSEGAAS, ESQ.: Riverkeeper is a
4 member-supported organization.
5 We have about 5,000 members in the Hudson
6 Valley.
7 And our mission is to defend and restore the
8 Hudson River and its tributaries, and to protect the
9 drinking-water supply for 9 million New York City
10 and Hudson Valley residents.
11 We've been actively involved on a wide range
12 of Indian Point safety and environmental issues,
13 actually, since the plant was built, when we were an
14 earlier iteration of our organization.
15 We've become much more involved on safety
16 issues regarding Indian Point since --
17 unfortunately, since 9/11.
18 And we have a campaign currently underway,
19 which I'm sure you're aware of, to prevent the
20 relicensing of Indian Point, and retire and
21 decommission the plant.
22 In my testimony, I'll briefly summarize
23 Riverkeeper's participation in the PSC proceeding
24 that we're discussing today.
25 And, I'd also like to mention, and I put into
158
1 the record, an independent study that was
2 commissioned by Riverkeeper, not in the context of
3 this proceeding, but, actually, at the outset of the
4 Indian Point Nuclear Regulatory Commission hearings,
5 we partnered with Natural Resources Defense Council,
6 and we hired a company called "Synapse Energy
7 Economics" to basically prepare a report -- a series
8 of two reports, but I'll talk about the later one
9 today, that sets out a road map for replacing
10 Indian Point's power under slightly different time
11 frames than we're discussing today.
12 So, just to keep that in context.
13 And then I'll also talk about the concerns
14 you raised in your letter regarding the loss of
15 jobs, and a little bit regarding the cost impacts.
16 I also want to mention, just -- you know,
17 there was some discussion with Senator Carlucci
18 especially about the various legal proceedings that
19 are going on; very complicated, overlapping
20 proceedings.
21 Riverkeeper is an active party in the
22 Nuclear Regulatory Commission proceeding.
23 I'm the lead attorney in that.
24 We're also a party in the consolidated
25 proceeding before the DEC, regarding the
159
1 pollution-discharge permit under the Clean Water Act
2 that is being litigated right now for Indian Point;
3 And, the water-quality certification, which
4 I believe the Entergy spokesman mentioned.
5 So, I want to give you a little more context
6 on those, granted we have time on that.
7 Riverkeeper's position is that Indian Point's
8 continued operation presents a risk to the
9 20 million people living and working within 50 miles
10 of the plant, and its operation continues to take a
11 severe toll on the aquatic life in the Hudson; hence
12 we have the these permit proceedings before the DEC,
13 to try to require Indian Point to upgrade its
14 environmental cooling-water intake system to prevent
15 that impact.
16 Due to its location, its history of
17 accidents, which I'm prepared to talk about if you
18 so desire, radioactive water leaks, and unsafe
19 storage of nearly 2,000 tons of toxic nuclear waste,
20 Riverkeeper believes the risk of continuing to
21 operate Indian Point clearly outweighs its benefits.
22 And I would be happy to provide any
23 information, if that's helpful to the Committee, and
24 to the Chairman, regarding these safety issues.
25 SENATOR MAZIARZ: Sure.
160
1 PHILLIP MUSEGAAS, ESQ.: We're an active
2 party in the Public Service Commission proceeding,
3 as I mentioned, and we joined with the
4 Natural Resources Defense Council and the
5 Pace Energy and Climate Center in submitting
6 comments early in the proceeding on the Indian Point
7 contingency plan.
8 In general, we support the plan.
9 I think we appreciate the testimony that was
10 given earlier today by Mr. Quinones, and by the
11 Con End spokesperson, about the plan.
12 In our comments, we urged for stronger
13 consideration of increasing the amount of energy
14 efficiency and demand-response tools beyond
15 100 megawatts.
16 And, certainly, I have submitted our comments
17 which have more detail on that to the Committee
18 today.
19 In terms of energy-efficiency potential, our
20 comments actually reference the 2012 Synapse report
21 which I mentioned, which found that a 1.5 percent
22 annual demand reduction can reasonably be achieved
23 in New York over the next decade, leading to
24 approximately 21,000 gigawatts of cumulative savings
25 by 2022.
161
1 And as I mentioned earlier, our
2 energy-replacement study looked at replacing
3 Indian Point's power, assuming that the reliability
4 concerns would not come in until about 2020.
5 So, looking at different assumptions than
6 I believe NYISO and Con Ed does.
7 So just to -- if you think about why the
8 numbers are so different, that's certainly why.
9 The 2012 Synapse report I mentioned earlier,
10 just very briefly, provides a road map to replacing
11 Indian Point's power using entirely clean renewable
12 energy and energy-efficiency measures in equal
13 parts.
14 And I put that report in my testimony, and
15 I'm happy to answer questions on that as well.
16 Their report showed, again, that we believe
17 Indian Point's power can be replaced on time to
18 avoid any reliability concerns, and can be done
19 affordably.
20 Our experts estimated that, under their plan,
21 which is more aggressive in terms of energy
22 efficiency and more aggressive in renewables, that
23 the ratepayer cost increases to Downstate New York
24 ratepayers would be, roughly, about 1 percent a
25 month, which equates to about $1.20 a month in rate
162
1 increases.
2 Again, that's reflecting very high use of
3 energy-efficiency measures and a higher reliance on
4 renewables, so that's separate.
5 We didn't look at transmission upgrades that
6 are being looked at in this proceeding, so, it's in
7 the context of this, but it's based on some
8 different assumptions.
9 Finally, I want to just go to a couple of the
10 issues you raised in your letter to us.
11 One is regarding the loss of union jobs.
12 There was some discussion by previous
13 testifiers about the idea that -- of course, there's
14 a lot of discussion about, if you close Indian Point
15 in kind of a vacuum, that you're going to have a
16 massive loss of jobs and a massive loss of economic
17 resources in the -- economic benefits to the region.
18 In terms of decommissioning, we believe that
19 it would be very helpful to the public, and actually
20 to the Legislature, and we would make an informal
21 request, I think, at this point, for the Chairman
22 and this Committee to consider doing a study of what
23 kinds of jobs would be required at Indian Point
24 during a decommissioning of the plant.
25 You know, if we're talking about the
163
1 potential of retiring Indian Point, that, of course,
2 leads then to the decommissioning of the plant.
3 And based on other nuclear plants that have
4 been decommissioned around the country, we believe
5 it's worth the study, because I think that that's a
6 high number of jobs that are -- people that are
7 currently employed at Indian Point could be employed
8 in decommissioning the plant.
9 And, decommissioning is not a simple
10 exercise.
11 It's a very complex process.
12 It takes -- I think, other plants, it's taken
13 anywhere from 10 to 15, to nearly 20 years to
14 decommission older nuclear plants.
15 And, so, Indian Point, in particular, has
16 a -- is a very dense site.
17 We have the concern, and the problem with the
18 radioactive water plumes that are in the groundwater
19 underneath the site now.
20 And, so, decommissioning is going to take
21 additional time and additional resources, but, it
22 will provide jobs, and it will provide many of the
23 same skilled jobs that are currently being employed
24 at the plant.
25 So, you know, we don't take the idea of job
164
1 loss lightly by any means.
2 We're concerned about the river, and our
3 focus is on the environment, but, we certainly think
4 that we should have a full understanding of the
5 impacts of closing.
6 And that not only means the immediate job
7 losses, but, what kinds of jobs will be there long
8 term, in terms of decommissioning, and also in terms
9 of managing and securing the spent fuel that will be
10 on site.
11 The nuclear waste that Senator Carlucci
12 mentioned will be on site for the foreseeable
13 future, unfortunately.
14 In addition, I wanted to talk about the --
15 very briefly about the -- this question about how
16 much power Indian Point supplies to New York City
17 and Westchester County.
18 And I think we all hear the "25 percent"
19 number quite a bit.
20 I think there's debate whether Indian Point's
21 public power-purchase agreements are the only power
22 they sell, versus a number -- versus selling power
23 into the open market, versus private contracts with
24 the power.
25 I think it would benefit all of us, and
165
1 benefit the public, to really get a sense of what
2 the actual percentage is; and not only what
3 Indian Point is capable of sending into the grid,
4 and in terms of raw capacity power, how much it
5 represents in terms of percentages, but, actually,
6 on a daily basis, or a monthly basis, what is the
7 percentage of power it supplies, literally, into the
8 marketplace?
9 Finally, you mentioned in your letter of
10 August 28th, I think your concerns, and they're
11 justifiable concerns, about the -- and correct me if
12 I'm wrong about this, but the length of time that
13 it's taken the Nuclear Regulatory Commission to kind
14 of work through the relicensing proceeding.
15 One thing I do want to mention is that, up
16 until the present time, the NRC proceeding and the
17 state permit proceedings had been moving along at a
18 parallel rate.
19 Where they overlap is in -- is in the DEC's
20 denial of the water-quality certification, which
21 happened in 2010.
22 And in terms of the SPDES permit that
23 regulates the cooling-water intake, that's a
24 separate proceeding.
25 So those have been going on, in one form or
166
1 another, since 2004, a few years before Entergy
2 applied for relicensing.
3 The relicensing proceeding has been going on
4 from 2007 to now.
5 One of the major delays in that proceeding
6 was, the time it took the Nuclear Regulatory
7 Commission staff to actually complete the
8 environmental impact study.
9 It took about four years just to get through
10 the initial draft and the final EIS, and then they
11 supplemented that with an additional study, which
12 has just been completed, and gone through the
13 public-comment process now.
14 So, I just want to give you a sense of the
15 context.
16 It's a very large, complicated proceeding,
17 but, some of the delays have been caused, certainly,
18 the proceeding takes longer because New York State's
19 Attorney General and Riverkeeper and the Clearwater
20 are active parties.
21 We raised a number of contentions that have
22 to be heard in the hearing, and that takes time, but
23 there has been a very slow process on the NRC staff
24 side.
25 So just want to give that you context so you
167
1 understand the process a little better.
2 Finally, I just want to comment a little bit
3 on a few things that the Entergy spokesman said, and
4 not in a desire to get into a debate, but in a
5 desire to give you our perspective and make sure
6 you're fully informed.
7 SENATOR MAZIARZ: Sure.
8 Thank you.
9 PHILLIP MUSEGAAS, ESQ.: Mr. Twomey,
10 I believe, mentioned the NRC staff has completed its
11 final safety-evaluation report for Indian Point.
12 That's actually incorrect.
13 They completed an initial report, but they
14 are doing the second supplement to that.
15 And so, again, with the staff, the NRC staff
16 is taking a very long time on this application.
17 We are still waiting for a supplement.
18 And we have to wait for that to be complete
19 before we can move forward with the second round of
20 hearings on these safety issues, because the safety
21 issues that still have to be heard in the hearing
22 are directly related to the work that the staff is
23 doing.
24 We've also heard a lot of discussion today,
25 not only by Mr. Twomey, but I believe by a number
168
1 of other testifiers, regarding the Charles River
2 Associates report that was commissioned by
3 New York City to look at Indian Point replacement.
4 And there was repeated mention of the very
5 high economic costs and the high ratepayer costs
6 that would ensue for -- if Indian Point were closed
7 down and replaced.
8 I think it's critically important that the
9 Committee, and both of you here, are aware that, in
10 that study, New York City, for reasons I'm not clear
11 on, presented a replacement scenario that relied on
12 about 1,000 megawatts of offshore wind power and
13 1,000 megawatts of, I believe, a single, very large
14 natural-gas plant.
15 So, the replacement scenario they chose is
16 inherently a very expensive scenario, and it's
17 very, very different than what we are looking at
18 today, in terms of Public Service Commission's
19 replacement of using generation -- some new
20 generation, some new upgraded transmission projects,
21 and then this energy-efficiency portfolio.
22 So, the reason you're hearing numbers that
23 are so high is because New York City chose some of
24 the most expensive ways to replace Indian Point's
25 power, particularly using offshore wind.
169
1 It's a very expensive form of power. It's
2 coming -- the price is coming down slowly, but, in
3 the context of all the replacement sources that
4 we're looking at and options that we're looking at,
5 it's probably on the very expensive end.
6 And, so, I just think it's important that we
7 note that.
8 Mr. Twomey also mentioned that DEC had not
9 made a final decision on this water-quality
10 certification for Indian Point.
11 In fact, DEC did make a final decision in
12 2010; in April of 2010.
13 And I'm happy to follow up after the hearing
14 and send you a number of letters, both the denial
15 letter, and, subsequent correspondence from the DEC,
16 both to the state of New York and to the
17 Nuclear Regulatory Commission, literally, explaining
18 that this was an agency decision to deny the
19 water-quality certification, which is needed for
20 Indian Point's license renewal.
21 And the State, in that denial, gave Entergy
22 the option and the opportunity to request a hearing
23 to challenge that denial.
24 And that's the hearing process that we're in
25 now.
170
1 So, it's more than just a semantical
2 difference.
3 The state has taken a position that -- and
4 denied that permit.
5 And then, the reason that's important in this
6 context is, that is one of the two state permits
7 that -- where the State has some veto authority, in
8 a legal context, to prevent the relicensing.
9 The second one is the Coastal Zone Management
10 Act review, which other people have mentioned is
11 underway now, and that possibly could conclude
12 within the next year.
13 So, we could have a decision by the
14 Department of State, I think, within a year or so,
15 whether that -- whether they are going to approve or
16 deny that's -- that consistency review.
17 And I'm happy to answer questions about that.
18 I also want to mention, there was --
19 I believe Senator Carlucci asked a number of
20 questions about spent-fuel storage and nuclear-waste
21 storage at the site.
22 Mr. Twomey mentioned that Entergy has
23 decommissioning funds that could be used to pay for
24 the cost of storing spent fuel.
25 That's actually not technically correct.
171
1 The NRC regulations don't allow
2 decommissioning funds to be used for the ongoing
3 cost of storing spent fuel.
4 Decommissioning funds are solely in the fund,
5 and kept separate from other operational costs, to
6 pay for the cleanup of the site.
7 And, theoretically, down the road, if there's
8 still spent fuel on the site, Entergy would have to
9 pay for that.
10 But I want to be clear that this is not
11 Riverkeeper saying this.
12 These are NRC regulations: keep those things
13 separate.
14 The reason for that is, power companies, like
15 Entergy, have very actively been suing the federal
16 government in the Federal Court of Claims to recoup
17 the costs of storing all the spent fuel on their
18 site.
19 They've been suing the Department of Energy,
20 and they've been winning in federal claims court;
21 and so, there are damages, in the number of billions
22 of dollars coming back to companies, like Entergy,
23 and other companies that run nuclear plants, to
24 offset that cost.
25 Just a final comment:
172
1 You know, there's a lot of, I think, very
2 compelling testimony about people that work at the
3 plant, and others, saying how the plant has an
4 excellent safety record.
5 Riverkeeper's long-range concerns about the
6 radioactive water leaks that -- which have gone into
7 the Hudson River. These were undetected leaks until
8 2005.
9 We've raised concerns about the risk of the
10 plant, as you know well.
11 I also want to note that, in terms of safety
12 and security, two independent security guards, over
13 the past year, have filed lawsuits against
14 Indian Point, and raised whistleblower claims with
15 the Nuclear Regulatory Commission, regarding
16 significant security concerns, and alleged security
17 lapses, at Indian Point.
18 And one of these, at least, I know is a
19 decorated army veteran. Served in Afghanistan, and
20 I believe in Iraq.
21 So these are, again, not just disgruntled
22 employees. These are people that worked at the
23 plant for years, that alleged that they are serious
24 security concerns.
25 So I think there are active concerns about
173
1 safety and security at Indian Point that we need to
2 keep in mind.
3 But -- oh, I'm sorry.
4 One other thing, if I may.
5 I don't want to go over time.
6 Senator Ritchie, you asked a number of
7 questions about the -- about the Nine Mile Point and
8 Fitzpatrick plants.
9 I just wanted to make sure that you were
10 aware, and that the Committee was aware, that,
11 actually, all three plants that are on the
12 Great Lakes -- the Ginna, Nine Mile Point, and
13 Fitzpatrick -- have all been relicensed by the
14 Indian -- not by the Indian Point -- by the
15 Nuclear Regulatory Commission for 20-year license
16 terms.
17 And so, in terms of concerns about this
18 similar type of scenario unfolding for those plants,
19 they have been relicensed for second terms.
20 In -- I know for Fitzpatrick, that plant went
21 through its 401 certification process with the State
22 and was granted a 401 certificate, because it
23 complied with it, and it's -- I believe put in
24 systems that the DEC required to minimize its impact
25 on the Great Lakes marine ecosystem.
174
1 So, different factual contexts than
2 Indian Point's.
3 Indian Point's, essentially, been challenging
4 New York State's requirements to install
5 closed-cycle cooling, and to do other things at the
6 plant, for over 10 years now.
7 And, so, that's one reason why we're in this
8 permitting proceeding with the State that's now
9 overlapping with the nuclear-renewal proceeding.
10 That's all I have today.
11 Thank you for giving me a chance to speak.
12 SENATOR MAZIARZ: Thank you very much,
13 Mr. Musegaas.
14 We appreciate your perspective, and you
15 coming here today.
16 Just a couple of points before I ask
17 Senator Ritchie if she has anything.
18 You know, you talked about the employees.
19 And, you know, it's interesting, how we have
20 all these different studies, and some of them lead
21 to much, almost diametrically opposed conclusions,
22 but, that's the way it goes.
23 And, you know, as far as the, you know,
24 people being employed by the decommissioning of the
25 plant, I would just add this perspective to that:
175
1 That, you know, I think it would be very
2 difficult to get qualified, capable, a higher level
3 of employees that I think Indian Point tries to get,
4 and Entergy tries to get now, in some something that
5 they know is, is eventually going to be terminated,
6 whether it takes, you know, you said up to 10 years,
7 you know, 5 years, or whatever.
8 The percent, I just -- I just want to comment
9 on a couple of things that you said.
10 PHILLIP MUSEGAAS, ESQ.: Sure, sure.
11 SENATOR MAZIARZ: And you can, by the way,
12 comment right back.
13 The percentage of power, you know, whether
14 it's, uh -- you know, whether it's 20 or 25, I have
15 heard those estimates kicked around a lot too.
16 And you wonder, you know, how can it be?
17 I think, you know, from our analysis, a lot
18 of it has to depend, obviously, on the time of the
19 year, you know, and power usage --
20 PHILLIP MUSEGAAS, ESQ.: Absolutely.
21 SENATOR MAZIARZ: -- particularly in the
22 city.
23 But bottom line is, it's still 2,000 -- or
24 maybe a little more -- 2,000 megawatts of capability
25 of producing that much power.
176
1 You know, I'm certain that, you know, in the
2 middle of the week during August, they probably
3 produce all of that, and then some.
4 I'm most familiar with the, you know,
5 Power Authority and the Niagara Power Project, which
6 happens to be in my backyard.
7 You know, and I know, you know, the way that
8 they operate it is, when the demand is there,
9 they're going to run to the maximum capacity to get
10 it.
11 So, it is still -- still is very unclear, and
12 you heard testimony after testimony from some pretty
13 capable individuals.
14 Gavin Donohue, the Independent Power
15 Producers, I mean, his statement couldn't have been
16 any stronger, you know, that -- that this would
17 cause this -- this is my term, not his term, but, a
18 catastrophic reaction in the system when you're
19 taking all of that power off the grid.
20 But I respect, you know --
21 PHILLIP MUSEGAAS, ESQ.: Certainly.
22 SENATOR MAZIARZ: -- you know, technically,
23 it could be done.
24 And as far as, I just want to comment on the
25 denial of the water-quality permit.
177
1 I think, at least from our perspective on
2 this Committee, we did understand that that permit
3 had been denied; that it is in the appeals process.
4 And he probably wasn't as clear about that as
5 he should have been, but, we understood that.
6 PHILLIP MUSEGAAS, ESQ.: Okay, wonderful.
7 SENATOR MAZIARZ: With that, I'll turn it
8 over to Senator Ritchie for any questions or
9 comments.
10 SENATOR RITCHIE: Just a comment, I guess, to
11 start.
12 I understand what you're saying, that the
13 facility in my district has already been -- gone
14 through the relicensing procedure.
15 I guess, for me, the question is, because
16 Indian Point has -- is in the process of being
17 relicensed, or attempting to be relicensed, and they
18 have not, at any point, said that they were going to
19 retire the facility, and now this contingency
20 process is underway, it gives me pause that, next
21 year, that facility would have to refuel.
22 And at that time, even though this is about
23 relicensing, would the PSC be able to step in and
24 say: Now it's time for you to refuel. You know, we
25 really don't want you to undertake that process, and
178
1 we're going to put a contingency plan in place?
2 So, I guess -- I guess there's a gray area,
3 as far as I'm concerned, about how all of this took
4 place.
5 And the fact that, why, if we have a facility
6 that hasn't said they're going to look at retiring
7 the plant, why, all of a sudden, in the middle of
8 relicensing, considering they can operate until the
9 decision's made, why this is already underway?
10 And I guess I don't really understand how
11 they're going to put something in place, until they
12 have the final decision whether it can operate or it
13 can't.
14 So, I think there's too many balls in the air
15 for me to be comfortable with.
16 So, that's why I keep asking the question:
17 Why -- you know, what kind of precedence are
18 we setting here?
19 Because this kind of came out of the blue.
20 So...
21 PHILLIP MUSEGAAS, ESQ.: I understand.
22 I think, just a quick response:
23 I mean, I think I would support what
24 Mr. Quinones said at the outset, and -- I mean, in
25 terms of a decision, whether to continue with a
179
1 refueling outage or not, that's certainly an
2 economic decision that Entergy has to make.
3 But I think Indian Point is unique in many
4 ways, because of the size of the plant, because of
5 the legal and kind of regulatory context that we
6 find ourselves in, where the plant is going through
7 a long relicensing process with the NRC, with a lot
8 of opposition from the Attorney General, and from
9 less opposition, but, some from us as well.
10 And then these state environmental permits,
11 which, you know, we have a -- we have an adversarial
12 context, where Entergy doesn't believe, either they
13 are subject to the permits, or that -- that the
14 additional environmental upgrades that the State is
15 saying need to be done, Entergy disagrees with that.
16 And so we're, I think, in some ways, it's
17 this adversarial context is causing more delay and
18 more time to go by, and contributing to this sense
19 of not knowing when, how this is all going to wrap
20 itself up.
21 I would -- you know, I would just make a
22 comment about the Coastal Zone Management Act
23 review: By that -- under that law, the Department
24 of State actually has to make a determination on
25 that application, I believe, within six month of
180
1 starting its review.
2 And it's begun it -- well, it was out for
3 public comment at the end of August.
4 So, theoretically, you may have a final
5 state-agency decision on -- you know, on that
6 review, which -- actually, which also is a
7 precondition for relicensing, in the spring.
8 And so, hopefully, you know, whichever way
9 the State decides on that, that may provide some
10 additional clarity in the spring of 2014, or the
11 summer of 2014, as to where this is all headed.
12 But I -- you know, I share your concern that
13 it's not a clear process, but I think, out of an
14 abundance of caution, given this legal dispute
15 that's ongoing in these different proceedings, that
16 it makes sense for the State to plan as much as
17 possible.
18 Because if we don't, and we get to 2016 or
19 2017, and all the appeals start to run out and we --
20 Entergy decides to close for, you know, whatever the
21 decision is, then we won't have put those plans in
22 place, and we'll be in a much more difficult
23 position.
24 So that would -- that's how I would respond
25 to that.
181
1 SENATOR RITCHIE: Well, I certainly
2 understand how sensitive this issue is, and that
3 there are different perspectives on what should go
4 on.
5 But, it is kind of difficult, sitting in my
6 seat, that we have something that we're planning to
7 put in place, when we don't even know whether the
8 license will not be granted.
9 And in the meantime, I understand how
10 important it is to have the plan in place, because,
11 you know, this is going be quite -- quite lengthy.
12 But if something happens and the relicense is
13 granted, you know, and I have to think, how many
14 manhours, and how much of the taxpayers' money, has
15 gone into play in this process of going through
16 something that we don't even know is going to
17 happen.
18 So, you know, it's something that's not cut
19 and dry.
20 And I certainly appreciate you coming, and
21 giving your comments, so, you know, I can see
22 somewhat of a different perspective.
23 So I just have one question:
24 Can you just tell me what you do believe the
25 proper mix of fuel sources in New York State should
182
1 be?
2 PHILLIP MUSEGAAS, ESQ.: Well, I believe
3 it's --
4 Under this contingency plan, or to replace
5 Indian Point?
6 SENATOR RITCHIE: No, I guess, in general.
7 I guess -- do you -- do you support any
8 nuclear power, or are you opposed to that, you know,
9 as a blanket statement?
10 PHILLIP MUSEGAAS, ESQ.: No, we -- I'll be
11 very specific, and I appreciate you asking that.
12 Riverkeeper is specifically focused on
13 Indian Point, both, for the environmental impacts,
14 and the safety risks that it poses -- that we
15 believe it poses, and that I think the
16 State Attorney General believes it poses to the
17 area.
18 And, so, our efforts to close the nuclear
19 plant are entirely focused on Indian Point.
20 We do get involved, and we are actively
21 involved, in some national nuclear issues that have
22 a direct relation to Indian Point.
23 The nuclear-waste storage is one of them.
24 We were a party in a case in the D.C. Circuit
25 Court of Appeals, where we won a ruling from the
183
1 Circuit Court against the NRC regarding waste
2 storage.
3 But the reason we're involved in that, is
4 because that's how the NRC regulates nuclear waste,
5 focus -- you know, goes back directly to how it's
6 managed at Indian Point.
7 But, in terms of upstate nuclear plants, we
8 have not taken a position on those.
9 And, you know, our area of jurisdiction, if
10 you'll call it that, is the Hudson Valley and upper
11 New York Harbor and the Hudson River.
12 And, so, I -- we don't have the resources or
13 the time to -- you know, to take a position or weigh
14 in on upstate nuclear plants.
15 There are other groups in the state that do.
16 You know, we gave general concerns about --
17 primarily about nuclear-wastes storage nationally.
18 And -- but, you know, our focus is
19 Indian Point, and has always been, and it will
20 continue to be.
21 Thank you.
22 SENATOR MAZIARZ: So you're not opposed to
23 nuclear energy, just in general?
24 PHILLIP MUSEGAAS, ESQ.: Riverkeeper is not
25 opposed to nuclear energy.
184
1 We're certainly not supportive of it.
2 I mean, I think we are -- we have serious
3 concerns, and other water-keeper -- we're part of a
4 large alliance of keeper organizations around the
5 country.
6 Other keepers in the south, and out west,
7 work on nuclear issues as well.
8 I think we have a major concern with the
9 nuclear-waste problem that we have, and it's a
10 national problem.
11 It's particularly acute at Indian Point
12 because we have a large amount of nuclear waste
13 stored on the banks of the Hudson River.
14 We've had a history at Indian Point of the
15 spent-fuel pools leaking into the groundwater,
16 contaminating the groundwater, and leaking into the
17 Hudson River.
18 And so, for us, as a river organization,
19 we're very concerned that, if this stuff isn't going
20 anywhere, it's going be stored there for 100 years,
21 and it hasn't been managed properly already, what
22 are the future impacts going to be?
23 So that -- that's an issue we care deeply
24 about.
25 And we are involved, on a national level, on
185
1 that issue, to make sure that -- or, to do our best
2 to make sure that the NRC finds better ways of
3 requiring these plants to store it.
4 And moving it to dry-cask storage is one way.
5 And that was discussed a little bit earlier
6 today, but, Entergy's current plan is only to move
7 as much spent fuel out of the pools as they need to
8 to continue operating the plant.
9 We believe they should move much more fuel
10 out of the pools to reduce the accident risk and to
11 store it more safely.
12 So, I hope that -- I believe that answers
13 your question.
14 SENATOR MAZIARZ: Thank you.
15 Thank you very much, Mr. Musegaas.
16 PHILLIP MUSEGAAS, ESQ.: Thank you.
17 SENATOR MAZIARZ: We appreciate it.
18 [Applause.]
19 SENATOR MAZIARZ: Our next witness is
20 Susan Shapiro, with Radiation and Public Health
21 Project.
22 Susan.
23 Hi.
24 Thank you for being here today, Susan.
25 SUSAN SHAPIRO, ESQ.: Thank you for giving me
186
1 this opportunity to present to you.
2 I'm also not only representing
3 Radiation Public Health Project, but, also, the
4 Sierra Club Atlantic Chapter; and the New York
5 Environmental Law and Justice Project; and the
6 Indian Point Safe Energy Coalition.
7 And this binder will have a lot of the backup
8 reports that I will briefly discuss.
9 I'm not going to into them in depth, but,
10 there's a lot of -- because there's a -- there was
11 lot of information given you today by different
12 parties.
13 SENATOR MAZIARZ: Yes.
14 SUSAN SHAPIRO, ESQ.: And there's many
15 studies that I think would be very helpful for you
16 to look at, to understand this issue, and --
17 SENATOR MAZIARZ: You're going to submit
18 that? You're going to leave it?
19 SUSAN SHAPIRO, ESQ.: Yes, I'm going to
20 submit that to you.
21 SENATOR MAZIARZ: Okay.
22 Thank you.
23 SUSAN SHAPIRO, ESQ.: First of all, I want to
24 say this room is freezing, and maybe we can conserve
25 some energy -- maybe this is where we can start
187
1 conserving some energy.
2 SENATOR MAZIARZ: I couldn't agree with you
3 more. I wish I knew how to turn it off.
4 Open a window.
5 SUSAN SHAPIRO, ESQ.: I know, but, here,
6 that's an example of a waste of energy, because,
7 here, it's a nice beautiful day and we're freezing
8 in this room.
9 So, maybe New York State should start
10 thinking about, you know, even its own buildings,
11 conserving energy in some buildings, and that may be
12 helping the whole power problem we have in
13 New York State, if we do actually have a problem.
14 So, let me just start by saying, it is not
15 if, but when, Indian Point will close.
16 It could be by accident.
17 It could be by age.
18 It could be natural disaster. It's located
19 on two intersecting fault lines.
20 It could be by terrorist attack. It's
21 probably the most attractive terrorist target in the
22 country.
23 It could be by financial unsustainability.
24 And, it also could be by failure of Entergy
25 to meet state and federal legal requirements.
188
1 They have refused to revise their operations
2 to meet those requirements.
3 But, Indian Point will close.
4 Morgan Stanley recently published a study
5 which projects Indian Point will close, due to
6 economics, no later than 2018.
7 So this contingency plan is a necessity.
8 We can't wait any longer to figure this out.
9 We as a state need to think this through in a
10 thoughtful, planned way: How are we going to
11 replace the power of Indian Point?
12 You know, the first question we really do
13 have to get to, as Philip and others have said,
14 there's a big discrepancy of how much energy do they
15 actually provide for our region?
16 You, in your invitation, to -- say
17 25 percent.
18 That's what Entergy advertises in the Yankees
19 games, and on the airwaves, of -- they say
20 25 percent of New York City's energy.
21 That's impossible, because only 18 percent is
22 allowed to be imported from out of the city.
23 So, that fact -- the fact that they advertise
24 it is legally impossible, to begin with.
25 And today we just heard from Con Ed, that
189
1 only 10 percent of New York State's -- all of the
2 state's energy is provided by nuclear.
3 And you have your plants upstate, so
4 Indian Point could not be providing 25 percent of
5 our energy.
6 So we need to -- as Philip said, they have
7 not been forthcoming or transparent about how
8 much -- where they're selling their selling their
9 energy to.
10 If they're not selling it to us in
11 New York State, where they are selling it?
12 They could be selling it, clearly, to the
13 open market for the highest price.
14 Our region has the most expensive energy in
15 the country, and, Indian Point is not helping reduce
16 that price.
17 It's only probably increasing it, but we
18 don't know, because they've hidden that information.
19 So I would asked you, respectfully, to
20 request that, and require them to be transparent, as
21 they're supposed to be by law, and give you, the
22 State Senate and Assembly, that data.
23 They have refused to do that.
24 As of last Saturday, September 28th,
25 Indian Point actually stopped providing any energy
190
1 to the New York Power Authority.
2 So the subway system, the airports, none of
3 it, no longer runs on Entergy's energy:
4 Indian Point's energy.
5 So, once again, we need to know, really, what
6 are they providing?
7 And right now, we have an amazing opportunity
8 here in New York State to create really good-paying,
9 sustainable jobs, and rebuild our economy, by
10 creating renewable-energy infrastructure for the
11 existing -- with existing twenty-first-century
12 energy technology, and become a model, not only for
13 the state and the region, but for the whole country,
14 and the world.
15 New York can once again have a real economic
16 motor, by enacting this contingency plan. By
17 figuring out how we're going to make other safe,
18 clean forms of energy, and not rely on this plant
19 that's, literally, falling apart.
20 It's -- you know, it's made of 40-year-old
21 concrete and rebar that has been bombarded by
22 fission.
23 It's corroded. It's cracking.
24 They don't even know what kinds of piping
25 they have in that plant. It's a mixture of all
191
1 different types of piping.
2 They -- they really -- it's, literally,
3 falling apart.
4 I mean, the Tappan Zee Bridge was falling
5 apart. It took years, finally -- you know, they're
6 finally doing something about it.
7 But these are structures.
8 These are, you know, industrial structures.
9 They have a life cycle.
10 It's outlived its life cycle.
11 It was only supposed to last for 30 years,
12 but because of finances, they said, No, make it
13 40 years.
14 But, now, we're going into a future period,
15 where we don't know, nobody knows, nobody can
16 guarantee, that plant's not going to crack and fall
17 apart even worse than it already has in the near
18 future.
19 So, to protect New York State, and to protect
20 the people here, we really need to figure out how we
21 have to secure that plant in a safe way and close it
22 down, and plan for the future, so that we can really
23 be safe, you know, for our kids and our grandkids,
24 and the future of our area.
25 A recent Stamford University study found that
192
1 it's feasible and affordable to convert
2 New York State energy infrastructure to wind, water,
3 sunlight, without nuclear.
4 There's really no reason that we are going to
5 rely -- continue to rely in this downstate densely
6 populated area on this dangerous kind of energy.
7 In fact, just using the roof tops of
8 New York City, of the municipalities buildings and
9 the schools, we could easily, with solar and wind,
10 we could add a significant amount of distributed
11 electrical generation, just right here in
12 New York City alone.
13 So, instead of throwing good money after bad
14 by continuing to subsidize this unsustainable
15 industry that keeps, every year, asking for billions
16 and billions in handouts, it's time that
17 New York State make some plans; not contingency
18 plans, but real plans, to start replacing what
19 Indian Point produces.
20 It may generate 2,000 -- it may be able to
21 generate 2,000 kilowatts, but -- megawatts, I mean,
22 but, it doesn't -- once it goes on to the
23 transmission lines, the 1450 is what we're talking
24 about.
25 And then today we heard, there's already
193
1 plans for about 500 of that that's already taken
2 care of in these proposed up and coming plans.
3 So we're talking about replacing
4 1,000 megawatts of energy.
5 This is something that we can make happen,
6 with some planning, and some forethought.
7 When -- and I want to talk about jobs for a
8 second, because I know it's a big concern for all of
9 us. You know, it's a very big concern for
10 everybody.
11 But you have to remember, that when Entergy
12 took ownership of Indian Point, there were
13 3,000 good-paying union jobs at that plant.
14 Today, there's about 1,000.
15 They are the one who have cut the jobs.
16 We lost 2,000 good-paying jobs because of
17 Entergy.
18 So, you know, there's a period where, yes,
19 there's retraining. We might have to retrain some
20 people. And decommissioning, for many years, will
21 keep the people -- many of the people that are there
22 still working.
23 But, there's no reason that we can't invest
24 in retraining our very talented and very capable
25 New York State workforce.
194
1 We have -- I live in the Hudson Valley, right
2 near the plant, and we have empty factories. We
3 have highly-skilled workers that are unemployed.
4 It's time to start bringing the jobs for
5 manufacturing of solar, geothermal, tidal, all those
6 components right here, instead of shipping them --
7 bringing -- letting China make those jobs.
8 We need to have a workforce, you know, here,
9 making them. We're in the right area.
10 We have the whole New York State down area --
11 downstate area as the place to use it.
12 So why don't we make it where we're going to
13 use it, and give our people really good, sustainable
14 jobs that will last forever into the future, because
15 it will be safe, and we can continue this kind of
16 energy, and growing this kind of energy.
17 In fact, New York State, as you well know, is
18 a great agricultural state.
19 Biofuels:
20 Why -- there's very little talk even about
21 biofuels in New York State, but we -- you know,
22 we're farmland, grasslands.
23 Let's start using switchgrass and hemps, and
24 start using that to create our biofuels, and we will
25 have a much safer form of energy.
195
1 In fact, there was a recent study, done by
2 the University of Massachusetts, that found, that
3 for every million dollar invested, only four nuclear
4 jobs are created;
5 Whereas, for the same million dollars, you
6 can create 17 jobs in retrofitting and biomass,
7 14 jobs in transmission, 13 jobs in solar, wind, and
8 smart grids.
9 Retraining energy nuclear workers would be
10 like -- today, would be like saying, Well, you know,
11 chimney sweeps; we have to keep those chimney-sweep
12 jobs, because those are really good jobs at the time
13 we use coal in everyone's fireplace to make energy.
14 But we don't have chimney sweeps anymore.
15 There are other good jobs that they can be created.
16 Holding on to an old format isn't going to
17 make a sustainable job.
18 It will make a job that can only live a
19 certain lifetime.
20 Oh, I'm sorry.
21 So, as Philip said, the Synapse energy
22 consultants did a study that detailed a road map of
23 how to get there, by replacing Entergy --
24 Indian Point with clean energy sources.
25 And, let's talk about what the risks and the
196
1 costs of continuing to allow Indian Point to
2 operate. That's really a big concern that we have,
3 that should be considered in this contingency plan
4 as an alternative.
5 If you keep it operating, what's it really
6 costing New York State taxpayers?
7 Not just us in the downstate region, but all
8 New York taxpayers.
9 First of all, it's a historic thing that
10 Indian Point is now the first plant in the country,
11 and I believe the world, to operate with an expired
12 license.
13 You and I can't drive with an expired
14 license. Right?
15 We'd get fined, or we'd get pulled over.
16 We might even go to jail.
17 Indian Point is only 25 miles from midtown
18 Manhattan.
19 It's on, as I said, two active fault lines.
20 It has defective fire installation that only
21 protects for 24 minutes, instead of required 3 hours
22 by New York State law, and federal law, but it's
23 allowed to operate with an expired license.
24 Now, I've heard people talk today about, they
25 have these commitments; that they've met the
197
1 commitments.
2 Well, I have it in here, and I've read these
3 commitments that they're supposed to meet.
4 First of all, it's about that thick, how many
5 commitments they're supposed to meet.
6 And about 50 percent of them, they don't
7 meet, today. We're sitting here today with them not
8 having met those commitment.
9 In fact, it even says, "The NRC inspectors
10 aren't sure that the systems Entergy is using, with
11 regard to thermal-aging embrittlement, will meet the
12 requirements of federal law."
13 Yet, the NRC is allowing them -- the NRC and
14 New York State is allowing them to continue to
15 operate that plant with an expired license.
16 That's really endangering 20 million people,
17 and our entire economy.
18 It's not -- New York State's economy, and the
19 entire country's economy.
20 If something happens at Indian Point, the
21 bankruptcy of our state, and the country, will
22 happen shortly after that.
23 You know, if Indian Point closes -- or,
24 Indian Point has refused to meet the state and
25 federal requirements.
198
1 That's their choice not to follow the law.
2 I'm sure you wouldn't support somebody else
3 breaking the law.
4 But, why does this industry get -- why does
5 Entergy get a pass on following the law?
6 They have refused, in fact, like, to spend
7 about $500,000, which is about a quarter of their
8 day's profit, to retrofit this fire-insulation
9 problem.
10 Instead, they've litigated for millions of
11 dollars.
12 They're still litigating about it.
13 Why don't they just fix it?
14 What -- it -- it doesn't make any sense to
15 anyone.
16 Fix the problem.
17 Every other plant in the country fix their
18 problem.
19 Entergy claims, We should be exempted from
20 fixing our problem; when, between us and a meltdown,
21 it's 24 minute.
22 New York City and a meltdown is a 24-minute
23 fire.
24 It should be a 3-hour fire rating.
25 It's their choice not to meet these
199
1 standards.
2 They claim that the -- we -- the closed-cycle
3 cooling system that's being required will require
4 these Yankee Stadium-sized cooling towers.
5 That's not what the requirement is.
6 There's a whole different system, a much less
7 expensive system, they could use, but they don't
8 want to.
9 They don't want to spend the money to keep
10 operating properly.
11 They're an industry, they're a business. It
12 costs money to operate a business to make the profit
13 they're making.
14 We should be not ashamed to require them to
15 live up to their obligations under the law.
16 So, let's talk about the continued cost of
17 operations.
18 Every single day that plant continues to
19 operate it makes more waste.
20 And as Philip said, that is the biggest
21 problem of the nuclear industry -- it's one of
22 biggest problems of the nuclear industry, is the
23 waste.
24 When they took ownership of the plant, there
25 were 18,000 tons of nuclear waste at that plant.
200
1 Today there's 27,000 tons of it.
2 It's not going anywhere.
3 The fact that the gentleman from Entergy
4 said, Oh, well, it's going to be in dry-cask storage
5 so the Department of Energy can come and ship it
6 away.
7 There is no place to ship it to.
8 Period.
9 In fact, tomorrow, there's going to be --
10 nationally starting, the NRC is starting, their
11 waste store -- Waste Confidence hearings, because
12 the bottom line is, Yucca Mountain was not a
13 political decision, that it was closed, though most
14 people would like to think, that, Oh, the politics
15 of Nevada made it close down.
16 Yucca Mountain closed because of science.
17 The heat from this nuclear waste, put all in
18 one place, cannot be contained.
19 We, scientifically, don't know how to deal
20 with it.
21 We don't know how to store it.
22 100 years, maybe the dry casks that they've
23 designed now will last.
24 "Maybe."
25 They don't know. We don't know.
201
1 We can't keep making, for the future, this
2 waste that we don't know how to deal with.
3 Unlike coal and fossil fuels, which, yes, do
4 create, you know, a carbon footprint, and all of
5 that, but it's hot once.
6 It goes through, it's cold.
7 It's ash, it's cold.
8 Nuclear is hot for thousands of years. It
9 keeps heating the environment.
10 No one has calculated how much that heats the
11 environment, but we know it's super-heating the
12 Hudson River.
13 We know that every single day it super-heats
14 the Hudson River.
15 That's why there's this need for closed-cycle
16 cooling, which they have refused to do.
17 But, let's also talk about what's -- who's
18 insuring this plant?
19 Who -- where's the insurance on this plant?
20 Who is it, really, actually insuring it?
21 Okay, we did a property-value study, which
22 you'll see in here, based on assessed actual values,
23 and actual -- assessed values and actualization
24 rates.
25 And the problem -- this is in 2011, the study
202
1 was done.
2 At that time, the property values in the
3 50-mile radius of Indian Point is $8.5 trillion.
4 The insurance coverage, under the
5 Price-Anderson Act, is only $12 billion.
6 That means it's only insured for .01 percent.
7 Because the nuclear -- the -- I'm sorry, the
8 insurance industry said, Nuclear is too expensive to
9 insure. We're not going to touch it.
10 It's not like flood insurance you can add a
11 rider on.
12 You look in your homeowner's policy, look in
13 any building policy, it's excluded. There's an
14 exclusion.
15 So who's the insurer?
16 The taxpayer: the New York State taxpayer,
17 the American taxpayer.
18 If something happens at Indian Point, your
19 region, as well as our region, is gonna have to pay
20 for that.
21 It's gonna -- that's what bankrupt the
22 Soviet Union, was Chernobyl.
23 Because who's going to pay for it? It's the
24 taxpayer here.
25 That was a different system, so I don't want
203
1 to get into that.
2 But, at this point in time, it's no longer
3 economically feasible to keep operating a plant
4 that's broken, that's cracked, that's leaking into
5 the Hudson River.
6 The spent-fuel pools, it's acknowledged they
7 have cracks in them, but they don't even know where
8 they are. They haven't found them.
9 But, it's still leaking, but they're not
10 doing anything about it.
11 So we know that there's problems with the
12 plant.
13 The fact that they're saying there has been
14 no leaks?
15 There's records that there's been leaks.
16 There's maps, there's been leaks.
17 You know, you guys can see it.
18 They can say what they want, but there's
19 evidence.
20 The spent-fuel pools are really one of the
21 larger problems, is because they're so densely
22 packed, as Philip said.
23 They're four times more densely packed than
24 they were designed to be, because they don't know
25 what to do with the fuel. You know, the waste, they
204
1 don't know where to go, so they keep just putting it
2 into these fuel pools.
3 Now they're starting to take some of it out,
4 but, like he said, they're not going to reduce the
5 density.
6 And that is just an enormous risk to our
7 entire region.
8 Let's see.
9 And, then, we all -- all of us New Yorkers
10 should be really concerned about who's going to be
11 left holding the bag to pay for the spent fuel once
12 Entergy no longer is around.
13 Entergy is a corporation. They can dissolve,
14 they can disappear.
15 They may not be here later.
16 Listen, after "Katrina," there was Entergy
17 and "Katrina." They left New Orleans with a big
18 bill.
19 They tried to hide behind the corporate veil.
20 And they did, they succeeded.
21 They'll do that here too.
22 Once they walk away, they've made their
23 profit, there's no guarantee, that who's going to be
24 paying for the waste and the cleanup?
25 Their decommissioning fund, the GAO found
205
1 that their decommissioning fund is short.
2 They were allowed them to -- the NRC allowed
3 them to actually use it on the stock market in 2008.
4 They lost a lot of money on it.
5 They are trying to recoup that, but they're
6 not there yet.
7 And prior to that, they weren't even keeping
8 up with the cost-of-living increases. There were
9 only doing 1 percent per year, rather than 3 percent
10 like everyone else.
11 So their fund, their decommissioning fund,
12 isn't even adequate.
13 So at the end of the day, who's gonna be
14 paying for this?
15 New York State taxpayers.
16 You know, yet, we need to have a plan to
17 close Indian Point down in a way that we make sure
18 have reliable energy for our region, because we
19 don't want to be stuck with paying for the cost and
20 also not having proper energy.
21 So this is the time to do it.
22 I mean, we have an example of, during the
23 "Sandy" hurricane, storm -- "superstorm," I guess
24 we're calling it, and everywhere in our region had
25 flashlights and candles, because we all knew that
206
1 the power was going to go out. We all knew the
2 power was going to down, because the trees were
3 falling and the wind was so strong.
4 Entergy continued to operate that plant, even
5 though Mayor Bloomberg had shut down the
6 transportation system in New York City.
7 All of the transportation systems in that
8 region, in the Westchester and the counties, was
9 shut down hours before "Sandy" actually hit.
10 Once those -- once that was shut down, there
11 was no evacuation plan.
12 Transportation -- public transportation is an
13 essential part of any evacuation plan, but they
14 allowed that plant to continue to operate, until
15 there was an emergency scram in the middle of the
16 night, at 10:20 at night, in the middle of the
17 storm.
18 If -- it's the most dangerous way to shut
19 down a plant, is in an emergency scram, instead of
20 in an orderly fashion.
21 And if -- if something had gone wrong, nobody
22 could have gotten anywhere.
23 All the trees were down.
24 People in this area didn't even use that
25 power.
207
1 That's why we have to find out, where are
2 they selling?
3 Because, we weren't using that power.
4 We didn't have power for two weeks.
5 Most of the area didn't have power for
6 two weeks.
7 Where were they selling that power?
8 Why were they putting us at risk, instead of
9 doing something orderly and planned?
10 And that's what we're asking for, with this
11 contingency plan, is let's have an orderly planned
12 method, so that we protect our region, and make sure
13 that we have the proper jobs.
14 Just a couple of more minor things -- not
15 minor, but it's a couple more things.
16 In terms of emergency preparedness, it turns
17 out that Entergy doesn't actually cover all the
18 costs for our region to prepare for an emergency
19 because of them.
20 They only cover a very small portion of it.
21 It's mostly covered by the taxpayers, the
22 ratepayers, right here.
23 And it should be, they're here, they're
24 making profit off of us. They should be responsible
25 for their own protection.
208
1 Our emergency-service guys are not fully
2 funded through Entergy to protect against them.
3 And I wonder, in your region, actually,
4 because I know in our region it doesn't happen, but,
5 is potassium iodide handed out to everyone in the
6 10-mile radius?
7 Because in our region, it's, by law, it
8 should be.
9 It's federal law, it should be.
10 And they don't do it, because Entergy refuses
11 to let our emergency-service guys to hand it out.
12 They want to send it out to all of the
13 residents in the region, and Entergy said no.
14 So right now, if there is an accident, we
15 aren't actually even protected to that real level,
16 just for thyroid cancer.
17 That's all that would cover, but it would be
18 something.
19 But they won't let it happen because they
20 think it's bad PR.
21 So, they're not following that minor federal
22 law. Even that.
23 And maybe New York State, you and the Senate,
24 can make that happen.
25 It's a very minor thing to do.
209
1 And, now, talking about health, and the
2 concerns that you have about air quality, which we
3 all share.
4 We all share concerns about our health and
5 our children's health, and asthma and air quality
6 and sickness.
7 Well, turns out that, every day, Indian Point
8 releases a minimum of 60 pounds of radioactive waste
9 into our air and into our water, as steam, or in --
10 directly into the water.
11 Even if it goes into the water, it
12 evaporates, it ends up in air.
13 We're breathing that in. That's going into
14 our thyroids.
15 The thyroid-cancer rates in our region are so
16 much higher that the rest of the nation, based on
17 the Cancer Registry studies.
18 The reports are in here, the studies are in
19 here.
20 So, you know, we know that we're getting sick
21 from Indian Point.
22 We know that people have thyroid cancer,
23 infants are being born with hypothyroidism, in our
24 region.
25 This is directly related to Indian Point.
210
1 Thyroid cancer is the marker from exposure to
2 radiation.
3 You don't get it from anything else. It's
4 not hereditary.
5 If you go onto the Thyroid Cancer Register --
6 Society, they'll explain that as well.
7 So, you know, the problem we actually have,
8 and this is something you guys can do, the
9 State Senate and the State Assembly really should be
10 requesting, and I respectfully ask you, to enact
11 this, or enact legislation towards this, is that
12 Entergy, actually, is the only ones who are
13 monitoring themselves.
14 There's no independent self-monitoring of the
15 radiation releases.
16 So, by regulation, they're allowed to release
17 60 pounds, but, based on what we've seen from
18 studies that were prior, it looks like, maybe,
19 they're releasing around 90 pounds a day.
20 It could be more.
21 We don't know.
22 The monitoring is very sporadic. It's only
23 three or four times a year. We -- and it's done by
24 Entergy themselves.
25 It's clearly the fox watching the hen house.
211
1 So we're asking to have funding -- Entergy
2 pay funding for independent monitoring by the
3 New York State Department of Health, that we have
4 continuous monitoring of the radiation that's coming
5 out of the plant.
6 Because we can't talk about the impacts on
7 health and the air unless we actually know what's
8 actually coming out of that plant.
9 And the other part of it, is that
10 New York State Department of Health should be
11 required to do captured-species studies around that
12 plant, because, taking a one-day test, a -- mon- --
13 you know, "Oh, here, what I see today," doesn't
14 really mean anything, because radiation impacts are
15 cumulative.
16 It doesn't -- they're bio -- they
17 bio-accumulate.
18 So we need the fish, the frogs, the birds,
19 all of the oysters...all the creatures around that
20 live there, and we need to capture them for at least
21 a year to see, actually, what is being released into
22 our environment.
23 We don't know that.
24 You should do that at your plant, too, so you
25 can protect your people -- at your plants, I should
212
1 say.
2 You know, there's, really -- the lack of
3 knowledge is -- of what's going on at that plant, is
4 one of the reason that it's no longer safe, and we
5 do need a contingency plan -- or, actually, I don't
6 even think it should be contingency plan.
7 It should be an enacted plan.
8 We need to be in the position, where,
9 Indian Point could go down at any minute for a
10 variety of reasons, and if we don't have a backup
11 plan for our energy, that will be a problem.
12 So there is -- it's not wasted money to plan
13 ahead.
14 It's good money spent, to know how we're
15 going to go into a healthy future with our energy in
16 New York State.
17 And I really hope that, you know, there isn't
18 undue influence due to large contributions that are
19 made by Entergy to our political people, you know,
20 that really influence you, this Committee, or any
21 other committee, because that should not be allowed
22 to affect the health of New York State, both
23 energy-wise, jobs-wise, and health-wise.
24 So I really thank you for, you know, this
25 opportunity.
213
1 SENATOR MAZIARZ: Thank you very much, Susan.
2 [Applause.]
3 SUSAN SHAPIRO, ESQ.: We appreciate it.
4 We, and, obviously, several people in
5 audience appreciate your comments.
6 Senator Ritchie.
7 SENATOR RITCHIE: I guess, could you just
8 tell me, I'm assuming from your presentation, then
9 you personally are opposed to nuclear facilities
10 across the country?
11 SUSAN SHAPIRO, ESQ.: You know what? I will
12 say something.
13 I wouldn't be opposed to nuclear if we knew
14 what to do with the waste, but there is no -- there
15 is no solution to deal with the waste.
16 There's no way to reverse-engineer it.
17 There's no place to store it.
18 The cost of storage we haven't even talked
19 about.
20 You know, the cost of keeping this waste, on
21 New York State, is enormous.
22 It's an enormous expense in perpetuity.
23 So if -- I can't -- I'm not against any form
24 of energy if you know how to make it safe, and you
25 can deal with the waste.
214
1 But we can't.
2 SENATOR RITCHIE: And I don't know the
3 history of your organization, so, can you tell me,
4 was your organization in place when NYPA owned the
5 facility?
6 Or, how did your organization come about?
7 SUSAN SHAPIRO, ESQ.: The organization -- the
8 Radiation Public Health Project is the organization
9 that, President Kennedy used their studies to stop
10 the aboveground nuclear testing, because we're an
11 epidemiological organization that takes data and
12 analyzes the data.
13 And that original data was -- was
14 strontium-90 and baby teeth.
15 And they found that the high -- the
16 super-high levels of strontium-90 in baby teeth was
17 caused by aboveground testing.
18 So President Kennedy stopped the aboveground
19 testing because of the work that this organization
20 did.
21 So, it's a very old organization.
22 SENATOR RITCHIE: But were you -- you --
23 because I'm just trying to get the history here of
24 the fact that, NYPA actually owned the facility
25 before Entergy purchased it.
215
1 Were you actively involved at that time --
2 SUSAN SHAPIRO, ESQ.: Yeah, we were doing --
3 SENATOR RITCHIE: -- trying to shut the plant
4 down then?
5 SUSAN SHAPIRO, ESQ.: -- I wouldn't say we
6 were trying -- I represent a few different
7 organizations, so Radiation Public Health is not
8 about shutting plants down.
9 They do studies. They do epidemiological
10 studies.
11 They're not about shutting plants down.
12 They do health studies.
13 So that's -- that organization --
14 Indian Point Safe Energy Coalition is made up of
15 70 environmental groups.
16 And one, for example, WestCan was very
17 involved in those hearings, and -- at that time, and
18 their biggest concern was the lack of
19 decommissioning funds at that time.
20 And they were told, Oh, you can't raise it
21 then. It's the wrong time to raise it.
22 Well, now is the right time to raise it.
23 We need to talk about the decommissioning
24 funds, and are they adequate?
25 And will New York State taxpayers be the ones
216
1 holding the bag on the decommissioning?
2 Because Entergy bought the plant to take the
3 decommissioning funds out.
4 It was an asset that they were looking at,
5 and they did use that money.
6 So, we need to -- New York State, you guys
7 really have to look and see, where are we on this
8 decommissioning?
9 Because at the end of the day, it's going be
10 all of us -- all of us in New York State -- who's
11 going to have to pay for that.
12 And that's a big expense.
13 And I don't think that your taxpayers are --
14 end even in your region are going to be happy about
15 that they're going to have to pay for
16 decommissioning for Indian Point, because Entergy
17 didn't, because they left the state.
18 They're an out-of-state corporation.
19 It's a single corporation that you're trying
20 to protect, if you are trying to protect it.
21 I hope that's not the intent of these
22 hearings.
23 I believe these hearings, the intent should
24 really be about replacement energy, is it needed?
25 It is, there's no question.
217
1 Even if Indian Point, even if you say, you
2 know, "Okay, they're going to get their
3 relicensing," in 20 years it's going to be needed.
4 You need to start planning it today.
5 Every -- you know, there's no reason not to
6 plan ahead, and do it right.
7 The longer you plan, the better you'll do.
8 The better -- the less it will cost.
9 The better we'll have a plan.
10 And that's really what this should be about,
11 is let's plan ahead.
12 There's no reason to not plan.
13 You know, it's like putting blinders on and
14 saying, Oh, I don't want to think about that.
15 But, it is the future, we have to think about
16 it.
17 And there's so many possibilities of why
18 Entergy Indian Point will close, sooner than later
19 that, we have to look it a realistically, you know.
20 And the other organizations, I have to say,
21 that I represent, the Sierra Club Atlantic Chapter
22 has been involved for a very long time on this
23 particular issue.
24 They are not an anti-nuclear group.
25 They're an environmental group that cares
218
1 about the protection of the environment.
2 SENATOR MAZIARZ: Thank you.
3 SUSAN SHAPIRO, ESQ.: Thank you.
4 SENATOR MAZIARZ: Thank you very much.
5 Thank you.
6 Thank you.
7 That's the termination of our hearing.
8 Thank you.
9 (Whereupon, at approximately 2:01 p.m.,
10 the public hearing held before the New York State
11 Senate Standing Committee on Energy and
12 Telecommunications concluded, and adjourned.)
13 ---oOo---
14
15
16
17
18
19
20
21
22
23
24
25