S T A T E O F N E W Y O R K
________________________________________________________________________
1120
2009-2010 Regular Sessions
I N A S S E M B L Y
(PREFILED)
January 7, 2009
___________
Introduced by M. of A. DESTITO, REILLY, KOON -- Multi-Sponsored by -- M.
of A. CLARK, ESPAILLAT, GLICK, MAYERSOHN, McENENY, TOWNS, WEISENBERG
-- read once and referred to the Committee on Environmental Conserva-
tion
AN ACT to amend the canal law, in relation to establishing the pilot
water level management program and hydraulic model
THE PEOPLE OF THE STATE OF NEW YORK, REPRESENTED IN SENATE AND ASSEM-
BLY, DO ENACT AS FOLLOWS:
Section 1. The canal law is amended by adding a new section 135 to
read as follows:
S 135. PILOT WATER LEVEL MANAGEMENT PROGRAM. 1. PILOT PROGRAM. THE
CORPORATION SHALL ESTABLISH AND OPERATE THE PILOT WATER LEVEL MANAGEMENT
PROGRAM FOR THE PURPOSE OF ENHANCING NAVIGATION AND FLOOD MITIGATION,
IMPROVING REAL-TIME FLOOD FORECASTING, ENABLING PRO-ACTIVE FLOOD RESPON-
SIVENESS AND DEVELOPING UNIFIED OPERATING PROCEDURES THROUGH THE
COLLECTION, ANALYSIS, COORDINATION AND DISSEMINATION OF REAL-TIME WATER
AND SYSTEMS DATA IN AND ALONG THE CANAL SYSTEM. SUCH PROGRAM SHALL BE
DESIGNED FOR AND IMPLEMENTED IN THE MOHAWK RIVER BASIN CANAL SYSTEM AND
INCLUDE LOCKS SEVEN THROUGH TWENTY-TWO. THE PILOT WATER LEVEL MANAGEMENT
PROGRAM SHALL INCLUDE, BUT NOT BE LIMITED TO:
(A) THE EVALUATION OF EXISTING WATER MANAGEMENT INFRASTRUCTURE INCLUD-
ING GAUGES AT LOCKS, IN AND ALONG THE CANAL SYSTEM, FEEDER TRIBUTARIES
AND AFFECTING RESERVOIRS;
(B) THE IMPLEMENTATION OF REAL-TIME AND REMOTE SENSING TECHNOLOGY, AND
OTHER ADVANCED WATER MEASUREMENT DEVICES AS DEEMED APPROPRIATE;
(C) A CENTRALIZED REAL-TIME DATA COLLECTION AND COMMAND CENTER WITH AN
INTERCONNECTED DATA COLLECTION AND INFORMATION SHARING SYSTEM TO INCLUDE
LOCKS AND OTHER APPROPRIATE CANAL SYSTEM WATER MANAGEMENT FACILITIES;
(D) DEVELOPMENT OF UNIFIED OPERATING AND COMMAND PROCEDURES IN
CONJUNCTION WITH THE WATER LEVEL MANAGEMENT PROGRAM AND ITS SYSTEMS;
EXPLANATION--Matter in ITALICS (underscored) is new; matter in brackets
[ ] is old law to be omitted.
LBD03777-01-9
A. 1120 2
(E) INFORMATION SHARING AND COORDINATION WITH APPROPRIATE AGENCIES TO
INCLUDE, BUT NOT BE LIMITED TO, THE NATIONAL WEATHER SERVICE, THE STATE
EMERGENCY MANAGEMENT OFFICE, NEW YORK POWER AUTHORITY AND APPROPRIATE
COUNTY OFFICERS FROM COUNTIES ADJACENT OR INTERSECTED BY THE CANAL
SYSTEM; AND
(F) AN ENHANCED SYSTEM FOR PUBLIC NOTIFICATION; AND
(G) THE DEVELOPMENT OF A DETAILED HYDRAULIC MODEL OF THE CANAL SYSTEM
AND WATER LEVEL CONTROL STRUCTURES.
2. REPORT. (A) NOT LATER THAN THREE YEARS AFTER THE EFFECTIVE DATE OF
THIS SECTION, THE CORPORATION SHALL PREPARE A REPORT EVALUATING THE
EFFECTIVENESS OF THE PILOT PROGRAM. SUCH REPORT SHALL INCLUDE, BUT NEED
NOT BE LIMITED TO:
(I) A DETAILED DESCRIPTION OF THE PROGRAM AS IT IS IMPLEMENTED TO
INCLUDE EACH OF THE ITEMS SET OUT IN PARAGRAPHS (A) THROUGH (G) OF
SUBDIVISION ONE OF THIS SECTION;
(II) AN ASSESSMENT AND RECOMMENDATION FOR IMPROVING THE WATER LEVEL
MANAGEMENT PROGRAM AND COSTS THEREOF;
(III) AN ASSESSMENT OF THE EFFICACY OF THE WATER LEVEL MANAGEMENT
PROGRAM, AND THE DEGREE TO WHICH IT SUCCESSFULLY ADDRESSED NAVIGATION
AND FLOOD MITIGATION ENHANCEMENT, REAL-TIME FLOOD FORECASTING, PRO-AC-
TIVE FLOOD RESPONSIVENESS AND DEVELOPMENT OF UNIFIED OPERATING PROCE-
DURES, AS WELL AS OTHER REALIZED BENEFITS; AND
(IV) RECOMMENDATION AS TO THE EXPANSION OF THE PROGRAM TO OTHER PARTS
OF THE CANAL AND COSTS THEREOF.
(B) THE CORPORATION SHALL SUBMIT SUCH REPORT TO THE GOVERNOR, COMMIS-
SIONER OF TRANSPORTATION, TEMPORARY PRESIDENT OF THE SENATE, SPEAKER OF
THE ASSEMBLY AND THE SENATE AND ASSEMBLY TRANSPORTATION COMMITTEES.
S 2. This act shall take effect immediately.