S T A T E O F N E W Y O R K
________________________________________________________________________
4993
2009-2010 Regular Sessions
I N S E N A T E
April 27, 2009
___________
Introduced by Sen. THOMPSON -- read twice and ordered printed, and when
printed to be committed to the Committee on Energy and Telecommuni-
cations
AN ACT to amend the public service law, in relation to net energy meter-
ing for residential solar and wind, farm waste or non-residential
solar electric generating systems
THE PEOPLE OF THE STATE OF NEW YORK, REPRESENTED IN SENATE AND ASSEM-
BLY, DO ENACT AS FOLLOWS:
Section 1. Paragraph (d) of subdivision 1 of section 66-j of the
public service law, as amended by chapter 452 of the laws of 2008, is
amended to read as follows:
(d) "Solar electric generating equipment" means a photovoltaic system
(i) (A) in the case of a residential customer, with a rated capacity of
not more than twenty-five kilowatts; and (B) in the case of a non-resi-
dential customer, with a rated capacity of not more than [the lesser of]
two thousand kilowatts [or such customer's peak load as measured over
the prior twelve month period, or in the case that such twelve month
period of measurement is not available, then as determined by the
commission based on its analysis of comparable facilities]; and (ii)
that is manufactured, installed, and operated in accordance with appli-
cable government and industry standards, that is connected to the elec-
tric system and operated in conjunction with an electric corporation's
transmission and distribution facilities, and that is operated in
compliance with any standards and requirements established under this
section.
S 2. Paragraph (f) of subdivision 1 of section 66-1 of the public
service law, as amended by chapter 483 of the laws of 2008, is amended
to read as follows:
(f) "Wind electric generating equipment" means one or more wind gener-
ators with a combined rated capacity of not more than twenty-five kilo-
watts for a residential customer-generator, and not more than five
EXPLANATION--Matter in ITALICS (underscored) is new; matter in brackets
[ ] is old law to be omitted.
LBD10574-02-9
S. 4993 2
hundred kilowatts for a farm service customer-generator, and in the case
of a non-residential customer-generator, [the lesser of] NOT MORE THAN
two thousand kilowatts [or the customer-generator's peak load as meas-
ured over the prior twelve month period, or in the case that such twelve
month period of measurement is not available, then as determined by the
commission based on its analysis of comparable facilities]; that is
manufactured, installed, and operated in accordance with applicable
government and industry standards, that is connected to the electric
system and operated in parallel with an electric corporation's trans-
mission and distribution facilities, and that is operated in compliance
with any standards and requirements established under this section.
S 3. This act shall take effect immediately.