Introduced by COMMITTEE ON RULES -- (at request of M. of A. Woerner) --
read once and referred to the Committee on Energy
AN ACT to amend the public service law, in relation to building make-
ready electrical infrastructure for the charging of electric vehicles
THE PEOPLE OF THE STATE OF NEW YORK, REPRESENTED IN SENATE AND ASSEM-
BLY, DO ENACT AS FOLLOWS:
Section 1. The public service law is amended by adding a new section
66-x to read as follows:
§ 66-X. MAKE-READY ELECTRICAL INFRASTRUCTURE. 1. LEGISLATIVE INTENT
AND PURPOSE. IT IS THE INTENT AND PURPOSE OF THIS SECTION TO IMPLEMENT
COST EFFECTIVE AND UNIFIED TREATMENT BY ELECTRIC CORPORATIONS OF ELEC-
TRICAL DISTRIBUTION INFRASTRUCTURE, AND CERTAIN CUSTOMER-OWNED MAKE-
READY INFRASTRUCTURE, NEEDED TO CHARGE ELECTRIC VEHICLES; AND PROVIDE
FOR CERTAIN COSTS OF SUCH INFRASTRUCTURE TO BE INCLUDED IN ELECTRIC
CORPORATIONS' RATE BASES AND GENERALLY RECOVERED THROUGH RATES OR
SURCHARGES, INSTEAD OF DIRECTLY FROM THE CUSTOMERS SERVED BY SUCH
INFRASTRUCTURE. NOTHING IN THIS SECTION SHALL MODIFY ANY OBLIGATION OF
AN ELECTRIC CORPORATION TO PROVIDE A FULL AND ACCURATE ACCOUNTING OF
COSTS RELATED TO ELECTRICAL DISTRIBUTION INFRASTRUCTURE NEEDED TO CHARGE
ELECTRIC VEHICLES.
2. DEFINITIONS. FOR THE PURPOSES OF THIS SECTION THE FOLLOWING TERMS
SHALL HAVE THE FOLLOWING MEANINGS:
(A) "ELECTRICAL DISTRIBUTION INFRASTRUCTURE" MEANS ANY UTILITY FACILI-
TIES USED TO DISTRIBUTE ELECTRIC SERVICE TO CUSTOMERS, AND INCLUDES
POLES, VAULTS, SERVICE DROPS, TRANSFORMERS, MOUNTING PADS, TRENCHING,
CONDUIT, WIRE, CABLE, METERS, OTHER EQUIPMENT AS NECESSARY, AND ASSOCI-
ATED ENGINEERING AND CIVIL CONSTRUCTION WORK.
(B) "UTILITY-OWNED MAKE-READY COSTS" MEANS ANY CAPITAL INVESTMENT IN
ELECTRICAL DISTRIBUTION INFRASTRUCTURE NEEDED TO CONNECT AND SERVE A NEW
ELECTRIC VEHICLE CHARGER, INCLUDING STEP DOWN TRANSFORMERS, OVERHEAD
SERVICE LINES, AND UTILITY METERS.
(C) "CUSTOMER-OWNED MAKE-READY COSTS" MEANS ANY CAPITAL INVESTMENT IN
EQUIPMENT OR INFRASTRUCTURE BEYOND THE UTILITY SERVICE POINT NECESSARY
EXPLANATION--Matter in ITALICS (underscored) is new; matter in brackets
[ ] is old law to be omitted.
LBD15064-02-4
A. 10383 2
TO MAKE A SITE, OTHER THAN A SINGLE-FAMILY RESIDENCE, READY TO ACCEPT AN
ELECTRIC VEHICLE CHARGER, INCLUDING CONDUCTORS, TRENCHING, AND PANELS.
(D) "DISADVANTAGED COMMUNITY" MEANS A COMMUNITY DEFINED AS A DISADVAN-
TAGED COMMUNITY UNDER ARTICLE SEVENTY-FIVE OF THE ENVIRONMENTAL CONSER-
VATION LAW.
(E) "PUBLIC SERVING FLEET" MEANS A FLEET OF VEHICLES OWNED, LEASED, OR
CONTRACTED BY THE STATE, ANY MUNICIPALITY, PUBLIC AUTHORITY OR SCHOOL
DISTRICT THAT OWNS, LEASES, OR CONTRACTS MORE THAN TWENTY-FIVE VEHICLES.
3. REASONABLE EFFORTS REQUIRED. ELECTRIC CORPORATIONS SHALL MAKE
REASONABLE EFFORTS TO ENSURE THAT ANY INFRASTRUCTURE BUILT PURSUANT TO
THIS SECTION IS EFFICIENTLY SIZED AND OPERATED. SUCH EFFORTS MAY
INCLUDE, BUT NOT BE LIMITED TO, CONSIDERING CUSTOMERS' REASONABLY FORE-
SEEABLE LOAD MANAGEMENT ACTIVITIES AND DEPLOYMENTS OF DISTRIBUTED ENERGY
RESOURCES.
4. APPLICATION. NO LATER THAN SIXTY DAYS AFTER THE EFFECTIVE DATE OF
THIS SECTION, ALL ELECTRIC CORPORATIONS SHALL FILE AN APPLICATION WITH
THE COMMISSION TO ESTABLISH A TARIFF THAT SHALL REPLACE THE LINE EXTEN-
SION RULES CURRENTLY USED BY SUCH ELECTRIC CORPORATIONS. SUCH TARIFF, AT
A MINIMUM, SHALL:
(A) PROVIDE FOR SUCH ELECTRIC CORPORATION TO DEPLOY CUSTOMER-SIDE
MAKE-READY INFRASTRUCTURE;
(B) AUTHORIZE SUCH ELECTRIC CORPORATION TO INCLUDE IN ITS BASE RATE
ONE HUNDRED PERCENT OF ALL REASONABLE AND PRUDENT UTILITY-OWNED MAKE-
READY COSTS;
(C) AUTHORIZE SUCH ELECTRONIC CORPORATION TO INCLUDE IN ITS BASE RATE
OF REASONABLE AND PRUDENT CUSTOMER-SIDE MAKE-READY COSTS NEEDED TO
PREPARE A SITE FOR ELECTRIC VEHICLE CHARGING IN THE FOLLOWING MANNER:
(I) A MINIMUM FIFTY PERCENT OR HIGHER WHERE AUTHORIZED BY THE COMMIS-
SION, OF CUSTOMER-OWNED MAKE-READY COSTS IN LOCATIONS THAT ARE NOT WITH-
IN TWO MILES OF A DISADVANTAGED COMMUNITY ZONE;
(II) ONE HUNDRED PERCENT OF CUSTOMER-OWNED MAKE-READY COSTS LOCATED
WITHIN A DISADVANTAGED COMMUNITY OR DISADVANTAGED COMMUNITY ZONE;
(III) ONE HUNDRED PERCENT OF CUSTOMER-OWNED MAKE-READY COSTS FOR
PUBLIC SERVING FLEETS; AND
(D) PROVIDE THAT THE PORTION OF CUSTOMER-OWNED MAKE-READY COSTS
INCLUDED IN THE ELECTRIC CORPORATION'S RATE BASE SHALL NOT BE CHARGED
DIRECTLY OR SOLELY TO THE CUSTOMER SERVED BY SUCH MAKE-READY INFRASTRUC-
TURE.
5. DISADVANTAGED COMMUNITY ZONE. FOR THE PURPOSES OF THIS SECTION THE
COMMISSION SHALL DEFINE THE TERM "DISADVANTAGED COMMUNITY ZONE".
6. COST TREATMENT AND RECOVERY FOR UTILITY-OWNED MAKE-READY COSTS. ALL
ELECTRIC CORPORATIONS SHALL MAINTAIN BUDGETS FOR ITS COSTS INCURRED
UNDER THIS SECTION. THE PORTION OF CUSTOMER-OWNED MAKE-READY COSTS
INCURRED BY AN ELECTRIC CORPORATION PURSUANT TO SUBDIVISION FOUR OF THIS
SECTION SHALL BE TREATED IN ACCORDANCE WITH A DEPRECIATION OR AMORTI-
ZATION SCHEDULE AS AUTHORIZED BY THE COMMISSION. ANY ELECTRIC CORPO-
RATION MAY RECOVER THE REVENUE REQUIREMENT ASSOCIATED WITH SUCH COSTS
THROUGH A SURCHARGE MECHANISM UNTIL ITS BASE RATES ARE RESET. ANY ELEC-
TRIC CORPORATION SEEKING TO RECOVER SUCH COSTS THROUGH A SURCHARGE MECH-
ANISM SHALL INCLUDE SUCH PROPOSAL AS PART OF ITS APPLICATION FILED
PURSUANT TO SUBDIVISION FOUR OF THIS SECTION.
7. APPROVAL OF TARIFFS. THE COMMISSION SHALL, AFTER NOTICE AND OPPOR-
TUNITY FOR PUBLIC COMMENT AND WITHIN NINETY DAYS OF THE FILING OF THE
TARIFF, APPROVE, OR MODIFY AND APPROVE, SUCH TARIFF.
§ 2. This act shall take effect immediately.