S T A T E O F N E W Y O R K
________________________________________________________________________
8543
2025-2026 Regular Sessions
I N A S S E M B L Y
May 20, 2025
___________
Introduced by M. of A. STIRPE -- read once and referred to the Committee
on Energy
AN ACT to amend the energy law, in relation to allowing new buildings
where new parking is provided to have an optional, charger-agnostic,
power-based allocation method alternative to certain electric vehicle
charging infrastructure requirements
THE PEOPLE OF THE STATE OF NEW YORK, REPRESENTED IN SENATE AND ASSEM-
BLY, DO ENACT AS FOLLOWS:
Section 1. Subparagraphs (i) and (ii) of paragraph (a) of subdivision
9 of section 11-104 of the energy law, as added by chapter 111 of the
laws of 2025, are amended and two new subparagraphs (iii) and (iv) are
added to read as follows:
(i) "electric vehicle ready infrastructure" shall mean all electrical
components, terminating in a receptacle or outlet, as necessary to
enable electric vehicle charging and support electric vehicle charging
stations; [and]
(ii) "electric vehicle charging station" shall mean all the equipment
necessary to deliver electricity from a source outside an electric vehi-
cle into one or more electric vehicles, as defined by the code coun-
cil[.];
(III) "POWER-BASED ALLOCATION METHOD" SHALL MEAN A COMPLIANCE APPROACH
THAT ALLOWS ELECTRIC VEHICLE CHARGING INFRASTRUCTURE REQUIREMENTS TO BE
MET BASED ON THE TOTAL KILOWATT POWER CAPACITY AVAILABLE FOR CHARGING
ELECTRIC VEHICLES, WITHOUT MANDATING A SPECIFIC NUMBER OR TYPE OF CHARG-
ING STATIONS; AND
(IV) "CHARGER-AGNOSTIC" SHALL MEAN A STANDARD OR METHOD THAT DOES NOT
REQUIRE THE USE OF A SPECIFIC TYPE OR BRAND OF ELECTRIC VEHICLE CHARGER
AND ALLOWS FOR THE USE OF LEVEL 1, LEVEL 2, OR DC FAST CHARGERS, DEPEND-
ING ON POWER AVAILABILITY AND SITE CONDITIONS.
§ 2. Subdivision 9 of section 11-104 of the energy law is amended by
adding a new paragraph (e) to read as follows:
EXPLANATION--Matter in ITALICS (underscored) is new; matter in brackets
[ ] is old law to be omitted.
LBD11280-02-5
A. 8543 2
(E) WITHIN TWELVE MONTHS OF THE EFFECTIVE DATE OF THIS PARAGRAPH, THE
DEPARTMENT OF STATE DIVISION OF BUILDING STANDARDS AND CODES SHALL
PROMULGATE RULES AND REGULATIONS ESTABLISHING AN OPTIONAL, CHARGER-AG-
NOSTIC, POWER-BASED ALLOCATION METHOD ALTERNATIVE TO MEET THE REQUIRE-
MENTS OF THIS SUBDIVISION. SUCH RULES SHALL INCLUDE, BUT NOT BE LIMITED
TO:
(I) GUIDELINES FOR CALCULATING AGGREGATE POWER CAPACITY FOR ELECTRIC
VEHICLE CHARGING STATIONS IN PARKING LOTS;
(II) STANDARDS ENSURING EQUITABLE ACCESS TO CHARGING OPTIONS FOR VARI-
OUS TYPES OF ELECTRIC VEHICLES;
(III) FLEXIBILITY FOR PROPERTY OWNERS TO SELECT APPROPRIATE CHARGING
TYPES BASED ON POWER LEVELS; AND
(IV) PROVISIONS TO ENSURE COMPLIANCE WITH ALL APPLICABLE SAFETY AND
ACCESSIBILITY REQUIREMENTS.
§ 3. This act shall take effect immediately.