S T A T E O F N E W Y O R K
________________________________________________________________________
976
2025-2026 Regular Sessions
I N A S S E M B L Y
(PREFILED)
January 8, 2025
___________
Introduced by M. of A. ANGELINO, LEMONDES, McDONOUGH, MORINELLO -- read
once and referred to the Committee on Environmental Conservation
AN ACT to amend the environmental conservation law, in relation to
requiring the department of environmental conservation to promulgate
rules and regulations relating to gas flow meters at natural gas well
sites
THE PEOPLE OF THE STATE OF NEW YORK, REPRESENTED IN SENATE AND ASSEM-
BLY, DO ENACT AS FOLLOWS:
Section 1. Section 23-0305 of the environmental conservation law is
amended by adding a new subdivision 16 to read as follows:
16. WITH RESPECT TO NATURAL GAS WELL SITES, THE DEPARTMENT SHALL
PROMULGATE RULES AND REGULATIONS THAT:
A. REQUIRE THAT ALL GAS WELLS CAPABLE OF PRODUCTION BE EQUIPPED WITH
AN ELECTRONIC FLOW METER ASSEMBLY FOR THE PURPOSE OF MONITORING SUCH
PRODUCTION, THE FLOW METER ASSEMBLY SHALL CONSIST OF A METER TUBE
CONTAINING TEST PORTS TO BE UTILIZED FOR MEASUREMENT AND TESTING OF
EXTRACTED GAS, SHUTOFF VALVES TO BE UTILIZED FOR THE PURPOSE OF SHUTTING
DOWN PORTIONS OF THE SYSTEM, AND A FLOW METERING ASSEMBLY, WHEREIN THE
ORIFICE IS CAPABLE OF BEING REMOVED WITHOUT SHUTTING OFF THE SYSTEM.
B. SHALL CAUSE TO BE COMPILED A LIST OF THIRD-PARTY CONTRACTORS, FROM
WHICH THE GAS COMPANIES AND WELL OPERATORS SHALL SELECT FOR THIS
SERVICE, THAT HAVE BEEN APPROVED BY THE DEPARTMENT TO PROVIDE FOR THE
PURPOSE OF TESTING AND/OR CALIBRATING OF GAS FLOW METER ASSEMBLIES.
C. PROVIDE THAT ANY OWNER OR OPERATOR OF A NATURAL GAS WELL SITE MAY,
AT SUCH OWNER'S OR OPERATOR'S OWN COST, ENGAGE THE SERVICES OF A THIRD
PARTY CONTRACTOR FROM THE APPROVED LIST COMPILED PURSUANT TO PARAGRAPH B
OF THIS SUBDIVISION FOR THE PURPOSE OF CAUSING AN INDEPENDENT TEST OR
CALIBRATION TO BE CONDUCTED UPON THE GAS FLOW METER OR METERS CONNECTED
TO THE NATURAL GAS WELL SITE.
EXPLANATION--Matter in ITALICS (underscored) is new; matter in brackets
[ ] is old law to be omitted.
LBD02688-01-5
A. 976 2
D. REQUIRE THAT ORIFICE METERS AND PIPING BE INSTALLED TO COMPLY WITH
AMERICAN GAS ASSOCIATION REPORT NO. 3, ORIFICE METERING OF NATURAL GAS
AND OTHER RELATED HYDROCARBON FLUIDS, THIRD EDITION, PART 2 SPECIFICA-
TION AND INSTALLATION REQUIREMENTS. FOR PURPOSES OF THIS SUBDIVISION,
"ORIFICE METER" MEANS A FLOW MEASURING DEVICE USED FOR CALCULATING THE
PRESSURE DROP, FLOW RATE AND BEHAVIOR OF THE GAS MOVING THROUGH THE
PIPE.
E. REQUIRE THAT TESTING AND CALIBRATION OF AN ORIFICE METER PROVIDED
BY GAS COMPANIES OR WELL OPERATORS SHALL BE CONDUCTED ON A MONTHLY BASIS
DURING THE INITIAL PRODUCTION STAGES AND ON A ROUTINE BASIS THEREAFTER,
THE FREQUENCY OF WHICH SHALL BE DEPENDENT ON THE DEGREE OF WEAR OF THE
ORIFICE AND/OR FLOW CHARACTERISTICS OF THE WELL AND COMPLIANCE WITH AGA
SPECIFICATIONS. FOR PURPOSES OF THIS PARAGRAPH "INITIAL PRODUCTION
STAGE" SHALL MEAN THE INITIAL THREE YEARS FOLLOWING INSTALLATION. THE
ORIFICE SHALL BE REPLACED IF THE DEGREE OF WEAR OF THE ORIFICE IS GREAT-
ER THAN TWO PERCENT.
F. REQUIRE THAT COPIES OF ALL REPORTS AND RESULTS OF THE TESTS
CONDUCTED PURSUANT TO PARAGRAPH E OF THIS SUBDIVISION SHALL BE PROVIDED
TO THE COMMISSIONER, THE COMMISSIONER OF AGRICULTURE AND MARKETS, THE
CHIEF INSPECTOR OR DIRECTOR OF THE LOCAL BUREAU OF WEIGHTS AND MEASURES
REPRESENTING THE GEOGRAPHIC AREA IN WHICH SUCH TEST WAS CONDUCTED, AND
THE ROYALTY OWNERS WHO HAVE AN INTEREST IN THE UNIT SERVED BY THE WELL.
§ 2. This act shall take effect on the one hundred eightieth day after
it shall have become a law. Effective immediately, the addition, amend-
ment and/or repeal of any rule or regulation necessary for the implemen-
tation of this act on its effective date are authorized to be made and
completed on or before such effective date.