§ 35-0101. DEFINITIONS.
AS USED IN THIS TITLE, THE FOLLOWING TERMS SHALL HAVE THE FOLLOWING
MEANINGS:
1. "DATA-CENTER FACILITY" MEANS A BUILDING OR GROUP OF BUILDINGS, OR
CAMPUS, PRIMARILY USED TO HOUSE COMPUTER SERVERS, STORAGE SYSTEMS,
NETWORK EQUIPMENT, POWER DISTRIBUTION AND COOLING INFRASTRUCTURE, OPER-
ATING CONTINUOUSLY OR NEAR-CONTINUOUSLY FOR CLOUD COMPUTING, ARTIFICIAL
INTELLIGENCE PROCESSING, LARGE-SCALE COMPUTING SERVICES, OR ANALOGOUS
OPERATIONS.
2. "LARGE-CAPACITY COMPUTING FACILITY (LCCF)" MEANS ANY DATA-CENTER
FACILITY THAT EITHER:
(A) HAS AN AGGREGATE ELECTRICAL DEMAND OF TEN MEGAWATTS OR MORE; OR
(B) UTILIZES MORE THAN FIVE MILLION GALLONS OF POTABLE WATER ANNUALLY
FOR COOLING, HUMIDIFICATION OR OTHER FACILITY-RELATED USES; OR
(C) IS PART OF A CAMPUS COMPRISED OF MULTIPLE FACILITIES EACH OF WHICH
MEETS PARAGRAPHS (A) OR (B) OF THIS SUBDIVISION.
3."POTABLE WATER SOURCE" MEANS WATER WITHDRAWN FROM A PUBLIC WATER
SUPPLY SYSTEM OR PRIVATE WATER SYSTEM TREATED TO DRINKING-WATER STAND-
ARDS.
4. "NON-POTABLE RECYCLED WATER" MEANS WATER TREATED FOR REUSE ON-SITE
OR VIA OFF-SITE RECLAIMED WATER SYSTEM, NOT TREATED TO DRINKING-WATER
STANDARDS BUT SUITABLE FOR COOLING, HUMIDIFICATION, LANDSCAPING, PROCESS
USE OR OTHER FACILITY USES AS APPROVED BY THE COMMISSIONER.
5. "CLOSED-LOOP COOLING SYSTEM" MEANS A SYSTEM IN WHICH THE SAME WATER
OR OTHER COOLANT IS RECIRCULATED, WITH ONLY MAKE-UP AND BLOW-DOWN LOSS-
ES, AND MINIMAL FRESH WATER INTAKE.
6. "BASELINE WATER INTAKE" MEANS THE FACILITY'S ANNUAL POTABLE WATER
INTAKE IN GALLONS IN THE YEAR IMMEDIATELY PRIOR TO ENACTMENT OF THIS
TITLE OR, FOR NEW FACILITIES, THE PROJECTED POTABLE WATER INTAKE
APPROVED UNDER PERMIT.
§ 35-0103. APPLICABILITY AND PHASING.
1. THIS TITLE APPLIES TO ANY LCCF LOCATED WITHIN THE STATE, WHETHER
NEW CONSTRUCTION, MAJOR EXPANSION DEFINED AS INCREASE IN CAPACITY GREAT-
ER THAN THIRTY PERCENT OF ELECTRICAL DEMAND OR WATER USE, OR EXISTING
FACILITY.
2. FOR NEW CONSTRUCTION OR MAJOR EXPANSION WITH SITE-PREPARATION
COMMENCEMENT AFTER JANUARY FIRST, TWO THOUSAND TWENTY-EIGHT: PERMITS
SHALL REQUIRE INCORPORATION OF NON-POTABLE RECYCLED WATER SYSTEMS,
CLOSED-LOOP COOLING AND POTABLE WATER INTAKE OFFSET MEASURES CONSISTENT
WITH SECTION 35-0105 OF THIS TITLE.
3. FOR EXISTING LCCFS IN OPERATION AS OF JANUARY FIRST, TWO THOUSAND
TWENTY-EIGHT:
(A) BY JANUARY FIRST, TWO THOUSAND THIRTY-ONE: EACH FACILITY SHALL
HAVE REDUCED POTABLE WATER INTAKE BY AT LEAST FIFTY PERCENT OF ITS BASE-
LINE.
(B) BY JANUARY FIRST, TWO THOUSAND THIRTY-FIVE: EACH FACILITY MUST
HAVE REDUCED POTABLE WATER INTAKE BY AT LEAST SEVENTY-FIVE PERCENT OF
ITS BASELINE, UNLESS SUCH FACILITY IS EXEMPT UNDER SECTION 35-0115 OF
THIS TITLE.
S. 10487 3
4. THE COMMISSIONER MAY ADOPT REGULATIONS TO PHASE IN COMPLIANCE FOR
SMALLER CAPACITY FACILITIES OR ESTABLISH TIERED COMPLIANCE SCHEDULES.
§ 35-0105. WATER-REUSE AND CONSERVATION STANDARDS.
1. NEW OR EXPANDED LCCFS SHALL ENSURE THAT AT LEAST SIXTY PERCENT OF
PROCESS/COOLING WATER INTAKE, EXCLUDING DOMESTIC POTABLE USE, IS DERIVED
FROM NON-POTABLE RECYCLED WATER OR OTHER APPROVED NON-POTABLE SOURCES AT
INITIAL BUILD.
2. EXISTING LCCFS SHALL MEET BY JANUARY FIRST, TWO THOUSAND THIRTY-ONE
A MINIMUM OF FORTY PERCENT RECYCLED/NON-POTABLE WATER INTAKE AND BY
JANUARY FIRST, TWO THOUSAND THIRTY-FIVE A MINIMUM OF SIXTY PERCENT
RECYCLED/NON-POTABLE WATER INTAKE.
3. FACILITIES SHALL DESIGN CLOSED-LOOP OR HYBRID COOLING SYSTEMS IN
WHICH MAKE-UP WATER INTAKE IS LESS THAN FIVE PERCENT ANNUALLY OF SYSTEM
FLOW, AND AVOID DISCHARGE OF WARM WATER OR INCREASED THERMAL LOADS TO
SURFACE WATERS UNLESS APPROVED UNDER BEST AVAILABLE TECHNOLOGY STAND-
ARDS.
4. FACILITIES SHALL CALCULATE AND PUBLICLY REPORT A WATER-USE EFFEC-
TIVENESS (WUE) METRIC, GALLONS OF POTABLE WATER PER KILOWATT-HOUR OF IT
LOAD, AND BENCHMARK AGAINST PEER FACILITIES.
5. FACILITIES LOCATED IN WATERSHEDS DESIGNATED BY THE DEPARTMENT AS
WATER-STRESS OR WATER-SCARCE SHALL PRIORITIZE NON-EVAPORATIVE COOLING
TECHNOLOGIES, INCLUDING, BUT NOT LIMITED TO, AIR-COOLED, IMMERSION, OR
OTHER LOW-WATER APPROACHES, AND USE RECLAIMED WATER RATHER THAN POTABLE
MAKEUP WATER.
6. RECYCLED WATER SYSTEMS MUST COMPLY WITH TREATMENT, QUALITY AND
REUSE STANDARDS PROMULGATED BY THE DEPARTMENT AND CONSISTENT WITH FEDER-
AL GUIDELINES SUCH AS THE UNITED STATES ENVIRONMENTAL PROTECTION AGEN-
CY'S INDUSTRIAL WATER REUSE GUIDANCE.
§ 35-0107. PERMITTING, REVIEW AND CERTIFICATION.
1. THE COMMISSIONER, IN CONSULTATION WITH THE NEW YORK STATE ENERGY
RESEARCH AND DEVELOPMENT AUTHORITY (NYSERDA) AND THE NEW YORK STATE
PUBLIC SERVICE COMMISSION (PSC), SHALL PROMULGATE ANY NECESSARY RULES
AND REGULATIONS ESTABLISHING:
(A) CRITERIA AND PROCEDURES FOR PERMIT REVIEW OF LCCFS, INCLUDING
WATER INTAKE ESTIMATES, WATER-REUSE PLANS, WATERSHED IMPACT ANALYSES,
COOLING SYSTEM DESIGN, ENERGY-WATER TRADE-OFF ANALYSIS AND HEAT-REUSE
POTENTIAL;
(B) CERTIFICATION PROTOCOLS FOR NON-POTABLE WATER TREATMENT AND REUSE
SYSTEMS; AND
(C) PROCEDURES FOR VERIFICATION OF COMPLIANCE, INTERIM BENCHMARKS AND
PERIODIC AUDITS.
2. NO LOCAL ZONING, PLANNING OR BUILDING PERMIT FOR AN LCCF SHALL BE
ISSUED UNLESS THE APPROVING AUTHORITY RECEIVES A CERTIFICATION FROM THE
DEPARTMENT THAT THE FACILITY'S WATER REUSE/COOLING PLAN COMPLIES WITH
THIS ARTICLE AND IMPLEMENTING REGULATIONS.
3. FOR EXISTING FACILITIES, THE DEPARTMENT SHALL ISSUE A "DATA CENTER
WATER STEWARDSHIP CERTIFICATE" ONCE THE FACILITY VERIFIES COMPLIANCE
WITH REDUCTION AND REUSE TARGETS UNDER SECTIONS 35-0103 AND 35-0105 OF
THIS TITLE; CERTIFICATES SHALL BE RENEWED EVERY FIVE YEARS.
4. THE DEPARTMENT MAY IMPOSE CONDITIONS ON PERMITS OR CERTIFICATES
INCLUDING, BUT NOT LIMITED TO, MONITORING INSTRUMENTATION, THIRD-PARTY
VERIFICATION, ADAPTIVE REMEDIATION PLANS AND PERIODIC AUDITS.
§ 35-0109. REPORTING, TRANSPARENCY AND PUBLIC DISCLOSURE.
1. EACH LCCF SHALL SUBMIT ANNUALLY TO THE DEPARTMENT A REPORT INCLUD-
ING, BUT NOT LIMITED TO:
(A) TOTAL POTABLE WATER WITHDRAWN;
S. 10487 4
(B) TOTAL NON-POTABLE RECYCLED WATER USED;
(C) TOTAL WATER DISCHARGED (VOLUME, DESTINATION, TEMPERATURE OR
CONDUCTIVITY, MAKEUP LOSSES);
(D) THE FACILITY'S WATER-USE EFFECTIVENESS METRIC;
(E) DESCRIPTION OF COOLING SYSTEM, WATER TREATMENT/REUSE SYSTEM, MAKE-
UP STRATEGY, HEAT REUSE, IF ANY;
(F) ANY VARIANCES OR EXEMPTIONS GRANTED; AND
(G) SUMMARY OF COMMUNITY/WATERSHED ENGAGEMENT AND MITIGATION MEASURES.
2. THE DEPARTMENT SHALL PUBLISH AN ANNUAL "DATA CENTER WATER STEWARD-
SHIP REPORT" SUMMARIZING AGGREGATED DATA AND FACILITY-SPECIFIC RESULTS,
SUBJECT TO CONFIDENTIALITY PROTECTION, AND MAKE SUCH REPORT AVAILABLE ON
THE DEPARTMENT'S WEBSITE.
3. EACH FACILITY SHALL POST ON ITS WEBSITE A SUMMARY OF ITS MOST
RECENT REPORT AND CERTIFICATE STATUS AND PROVIDE A DIRECT LINK TO THE
DEPARTMENT'S PUBLIC PORTAL.
§ 35-0111. INCENTIVES AND TECHNICAL ASSISTANCE.
1. SUBJECT TO APPROPRIATION, NYSERDA AND THE DEPARTMENT SHALL JOINTLY
ESTABLISH A DATA CENTER WATER EFFICIENCY GRANT AND LOAN PROGRAM TO
PROVIDE COST-SHARING GRANTS, LOW-INTEREST LOANS OR TAX CREDITS FOR:
(A) RETROFITS OF EXISTING LCCFS TO UPGRADE COOLING SYSTEMS, INSTALL
ON-SITE NON-POTABLE WATER TREATMENT AND CLOSED-LOOP INFRASTRUCTURE; AND
(B) PILOT PROJECTS DEMONSTRATING NOVEL LOW-WATER COOLING, IMMERSION
COOLING, HEAT-REUSE INTEGRATION OR SHARED INFRASTRUCTURE (REGIONAL
RECLAIMED WATER LINES).
2. THE DEPARTMENT MAY OFFER EXPEDITED PERMITTING OR REDUCED FEES FOR
LCCFS THAT EXCEED THE STATUTORY MINIMUMS.
3. THE STATE SUPPORTS INCLUSION OF RECLAIMED/NON-POTABLE WATER INFRAS-
TRUCTURE IN REGIONAL WATER PLANNING, AND MAY ASSIST MUNICIPALITIES OR
UTILITIES PARTNERING WITH LCCFS TO BUILD SHARED REUSE INFRASTRUCTURE.
§ 35-0113. ENFORCEMENT, PENALTIES AND REMEDIES.
1. IF AN LCCF FAILS TO MEET REQUIRED TARGETS OR SUBMITS FALSE OR
MISLEADING REPORTS, THE COMMISSIONER MAY:
(A) ISSUE A NOTICE OF VIOLATION;
(B) IMPOSE CIVIL PENALTIES UP TO FIFTY THOUSAND DOLLARS PER DAY OF
NON-COMPLIANCE;
(C) SUSPEND OR REVOKE ITS WATER-RELATED PERMIT OR CERTIFICATE; OR
(D) REQUIRE SUBMISSION AND IMPLEMENTATION OF A CORRECTIVE ACTION PLAN,
SUBJECT TO DEPARTMENT APPROVAL.
2. THE DEPARTMENT MAY REMOVE CERTIFICATE STATUS AND THE FACILITY SHALL
LOSE ELIGIBILITY FOR INCENTIVES UNDER SECTION 35-0111 OF THIS TITLE.
3. THE STATE MAY BRING CIVIL ACTION TO ENJOIN NON-COMPLIANCE OR COMPEL
IMPLEMENTATION OF REQUIRED MEASURES.
4. ALL MONETARY PENALTIES COLLECTED SHALL BE DEPOSITED INTO THE DATA
CENTER WATER STEWARDSHIP FUND PURSUANT TO SECTION EIGHTY-FIVE OF THE
STATE FINANCE LAW TO BE USED FOR TECHNICAL ASSISTANCE, WATER-REUSE
RESEARCH GRANTS AND WATERSHED RESTORATION.
§ 35-0115. EXEMPTIONS, VARIANCES AND HARDSHIP RELIEF.
1. THE COMMISSIONER MAY GRANT A VARIANCE OR TEMPORARY EXEMPTION FROM
ONE OR MORE STANDARD OR STANDARDS UPON WRITTEN APPLICATION SHOWING:
(A) TECHNICAL/GEOLOGIC/HYDROLOGIC CONSTRAINTS PREVENT FULL COMPLIANCE;
(B) THE FACILITY HAS IMPLEMENTED ALL COMMERCIALLY FEASIBLE WATER REUSE
MEASURES AND ADDITIONAL REDUCTION WOULD CAUSE DISPROPORTIONATE COST OR
ENERGY PENALTY; OR
(C) THE FACILITY PROPOSES AN ALTERNATE PLAN PROVIDING EQUIVALENT POTA-
BLE WATER REDUCTION, INCLUDING BUT NOT LIMITED TO, CO-LOCATED WASTE-HEAT
REUSE OR ALTERNATE COOLING MEDIUM.
S. 10487 5
2. VARIANCE APPROVAL SHALL INCLUDE A TIME-BOUND SCHEDULE FOR COMPLI-
ANCE, BE PUBLICLY POSTED, AND MAY BE SUBJECT TO CONDITIONS.
3. FACILITIES LOCATED IN WATERSHEDS DESIGNATED BY THE DEPARTMENT AS
CRITICAL WATER-STRESS ZONES MAY BE SUBJECT TO STRICTER STANDARDS AND
LESS LIKELY TO OBTAIN WAIVERS.
§ 35-0117. TECHNICAL STANDARDS AND REGULATORY UPDATES.
1. THE DEPARTMENT SHALL ADOPT RULES AND REGULATIONS ESTABLISHING
TREATMENT STANDARDS, QUALITY SPECIFICATIONS AND MONITORING PROTOCOLS FOR
NON-POTABLE RECYCLED WATER USED BY LCCFS, CONSISTENT WITH FEDERAL INDUS-
TRIAL REUSE GUIDANCE.
2. THE DEPARTMENT SHALL REVIEW COOLING- AND WATER-REUSE TECHNOLOGIES
AT LEAST EVERY THREE YEARS, AND MAY UPDATE REGULATIONS OR GUIDANCE
ACCORDINGLY, INCLUDING BUT NOT LIMITED TO, IMMERSION COOLING, DIRECT-TO-
CHIP COOLING, AND HEAT RECOVERY SYSTEMS.
3. THE DEPARTMENT, IN COORDINATION WITH NYSERDA, SHALL PUBLISH A
"WATER-SMART DATA CENTER DESIGN GUIDELINES" DOCUMENT, INCLUDING, BUT NOT
LIMITED TO, BENCHMARKING TOOLS, BEST PRACTICE CASE STUDIES AND METRICS
FOR INDUSTRY USE.
§ 4. The state finance law is amended by adding a new section 85 to
read as follows:
§ 85. DATA CENTER WATER STEWARDSHIP FUND. 1. THERE IS HEREBY ESTAB-
LISHED IN THE CUSTODY OF THE STATE COMPTROLLER AND THE COMMISSIONER OF
TAXATION AND FINANCE A FUND TO BE KNOWN AS THE "DATA CENTER WATER
STEWARDSHIP FUND." THE DEPARTMENT OF ENVIRONMENTAL CONSERVATION SHALL
ADMINISTER SUCH FUND.
2. SUCH DATA CENTER WATER STEWARDSHIP FUND SHALL CONSIST OF ALL REVEN-
UE COLLECTED FROM ANY CIVIL PENALTIES IMPOSED PURSUANT TO SECTION
35-0113 OF THE ENVIRONMENTAL CONSERVATION LAW AND ANY OTHER MONIES
DEPOSITED INTO SUCH FUND PURSUANT TO LAW. SUCH FUNDS SHALL BE USED FOR
TECHNICAL ASSISTANCE, WATER-REUSE RESEARCH GRANTS AND WATERSHED RESTORA-
TION.
3. MONEYS OF THE FUND, FOLLOWING APPROPRIATION BY THE LEGISLATURE,
SHALL BE USED FOR EXECUTION OF DATA CENTER WATER STEWARDSHIP PURSUANT TO
TITLE THIRTY-FIVE OF ARTICLE FIFTEEN OF THE ENVIRONMENTAL CONSERVATION
LAW, AND EXPENDED FOR THE PURPOSES AS SET FORTH IN SUCH TITLE OF THE
ENVIRONMENTAL CONSERVATION LAW.
§ 5. Severability. If any provision of this act or the application
thereof to any person or circumstance is held invalid, the remainder of
the act and the application of its other provisions shall not be
affected.
§ 6. This act shall take effect immediately. The commissioner of envi-
ronmental conservation shall adopt the implementing rules and regu-
lations no later than January 1, 2027. The provisions of subdivision two
of section 35-0103 of the environmental conservation law as added by
section three of this act regarding new facilities for new/expanded
construction shall apply to projects with site preparation on or after
January 1, 2028. The provisions of subdivision three of section 35-0103
and subdivision two of section 35-0105 of the environmental conservation
law as added by section three of this act regarding existing facilities
shall apply to projects on and after January 1, 2031.