2486
2025-2026 Regular Sessions
I N S E N A T E
January 21, 2025
___________
Introduced by Sen. PARKER -- read twice and ordered printed, and when
printed to be committed to the Committee on Energy and Telecommuni-
cations
AN ACT to amend the energy law, in relation to the creation of geother-
mal facilities in New York state
THE PEOPLE OF THE STATE OF NEW YORK, REPRESENTED IN SENATE AND ASSEM-
BLY, DO ENACT AS FOLLOWS:
Section 1. The energy law is amended by adding a new section 3-105 to
read as follows:
§ 3-105. GEOTHERMAL FACILITIES. NEW GEOTHERMAL, DRY STEAM, FLASH
STEAM, AND BINARY CYCLE PLANT FACILITIES SHALL BE CREATED AND INSTALLED
ON AN EXPEDITED PROCESS, IN CONJUNCTION WITH THE FOLLOWING GUIDELINES:
1. SUCH FACILITIES SHALL BE CONSTRUCTED ON SITES THAT ARE PRE-APPROVED
BY THE PUBLIC SERVICE COMMISSION, THE NEW YORK STATE ENERGY RESEARCH AND
DEVELOPMENT AUTHORITY, THE NEW YORK POWER AUTHORITY, OR OTHER IDENTIFIED
STATE-APPROVED ORGANIZATIONS WHICH SPECIALIZE IN THE CONSTRUCTION,
PRODUCTION, AND DISTRIBUTION OF ENERGY.
2. SUCH FACILITIES SHALL BE CAPABLE OF COMPLETING EFFICIENT AND SAFE-
TY-APPROVED CONSTRUCTION AND WILLING TO OPERATE IN COMPLIANCE WITH THE
ENVIRONMENTAL CONSERVATION LAW TO PERFORM THE SAFE CAPTURE AND HARNESS-
ING OF GEOTHERMAL ENERGY.
3. ALL GEOTHERMAL COMPANIES AND SUCH COMPANIES' OPERATING PARTNERS AND
AFFILIATES SHALL GO THROUGH ANNUAL INSPECTIONS STARTING ONE YEAR AFTER
COMPLETION OF CONSTRUCTION, MAXIMIZING THE SAFETY OF THE ENERGY FACILITY
AND THE SURROUNDING LOCAL AREA OF SAID FACILITY. SUCH ANNUAL INSPECTIONS
WILL BE CONDUCTED BY THE STATE, THE PUBLIC SERVICE COMMISSION, THE NEW
YORK STATE ENERGY RESEARCH AND DEVELOPMENT AUTHORITY, THE NEW YORK POWER
AUTHORITY, OR OTHER IDENTIFIED STATE-APPROVED ORGANIZATIONS WHICH
SPECIALIZE IN THE CONSTRUCTION, PRODUCTION, AND DISTRIBUTION OF ENERGY.
4. THE PUBLIC SERVICE COMMISSION, THE NEW YORK STATE ENERGY RESEARCH
AND DEVELOPMENT AUTHORITY, OR ANY OTHER COMPETENT AUTHORITY THAT GEOTH-
EXPLANATION--Matter in ITALICS (underscored) is new; matter in brackets
[ ] is old law to be omitted.
LBD06649-01-5
S. 2486 2
ERMAL ENERGY PRODUCTION MAY FALL UNDER, SHALL OVERSEE THE MAPPING,
TRACKING, AND REPORTING OF AREAS THAT HAVE BEEN APPROVED AND CITED AS
READY FOR GEOTHERMAL-CAPABLE FACILITIES TO BE ERECTED ON APPROVED
GROUNDING SITES.
5. THE DOCUMENTED INFORMATION FOR THE READYING OF CONSTRUCTION AND
INSTALLATION OF SUCH FACILITIES SHALL BE MADE PUBLIC ON A STATE AGENCY
WEBSITE FOR A MINIMUM OF THIRTY DAYS ALLOWING FOR PUBLIC COMMENT ON THE
APPROVED SITE IF THE CITED AREA IS IN CONJUNCTION WITH A LOCAL MUNICI-
PALITY, AND/OR WOULD CHANGE THE OVERALL AGRICULTURAL LAND IN THE
APPROVED AREA. HOWEVER, IF THERE ARE NO ADVERSE EFFECTS TO THE LOCAL
MUNICIPALITY, THE THIRTY-DAY COMMENT PERIOD SHALL BE CLOSED WITH NO NEED
FOR FURTHER REVIEW, AND CONSTRUCTION OF THE FACILITY MAY COMMENCE EFFEC-
TIVE IMMEDIATELY.
6. THE CONSTRUCTION AND INTEGRATION OF ENERGY SYSTEMS TO THE DESIG-
NATED APPROVED AREA MAY EXPEDITE APPROVAL TIME OF PERMITS WITH THE
HIRING OF A BONAFIDE OR STATE-APPROVED LOCAL UNION TO TAKE ON THE PRIMA-
RY ROLES OF INSTALLATION AND CONSTRUCTION OF THE NEW FACILITY FITTING,
OR RETROFITTING AS IN THE CASE OF OLDER FOSSIL FUEL FACILITIES THAT ARE
CAPABLE OF BEING RETROFITTED FOR GEOTHERMAL ENERGY PRODUCTION, FOR THE
PROCESS OF BRINGING IN NEW GEOTHERMAL POWER PRODUCTION FACILITIES FOR
DRY STEAM, FLASH STEAM, AND BINARY CYCLE.
7. GEOTHERMAL COMPANIES SHALL BE DEEMED ELIGIBLE FOR STATE FUNDING AND
GRANTS IF THEY EMPLOY AND RETAIN MORE THAN SIXTY PERCENT OF THE WORK-
FORCE FROM NEW YORK STATE RESIDENTS AND/OR LOCAL UNIONS FOR CONTINUED
EMPLOYMENT BEYOND THE ORIGINAL BASE CONSTRUCTION OF THE FACILITY.
8. THE MAPPING PROCESS SHALL INCLUDE, BUT NOT BE LIMITED TO THE INTE-
GRATION OF THE AREA THAT HAS BEEN APPROVED TO BE A NEWLY-FORMED FACILITY
SITE WHICH IS CAPABLE OF REASONABLY AND TIMELY CONNECTING TO PRE-EXIST-
ING LINES AS WELL AS, THE CREATION OF NEW LINES TO INTERCONNECT WITH THE
NEW GEOTHERMAL ENERGY SOURCE, AND ANY OTHER NEW OR PRE-EXISTING RENEWA-
BLE ENERGY SOURCE THAT MAY PROVIDE A SUFFICIENT, SAFE, RELIABLE, AND
AFFORDABLE COMMODITY FOR EXISTING AND NEW STRUCTURES. RESIDENTIAL HOUS-
ING SHALL TAKE CONNECTION PRIORITY, FOLLOWED BY COMMERCIAL BUILDING
STRUCTURES, WITH THE GOAL BEING A SUSTAINABLE SOURCE ABLE TO MAINTAIN
AND SUSTAIN THE SURROUNDING STRUCTURE AND PROVIDE ENOUGH ENERGY TO BUILD
OUT MORE IN-DEPTH BATTERY STORAGE AND ENERGY SUPPLY FOR THE ENTIRETY OF
NEW YORK.
9. THE ADOPTION AND BUILD OUT OF GEOTHERMAL ENERGY FACILITIES AND
THEIR DISTRIBUTION OF STORED ENERGY WILL NOT PRECLUDE, EXCLUDE, OR ELIM-
INATE THE CONTINUED ADOPTION OF ANY AND ALL OTHER RENEWABLE ENERGY
SOURCES THAT WOULD AID IN THE ABILITY TO CREATE A SUSTAINABLE, AFFORDA-
BLE AND CLEAN ENERGY EFFICIENT NEW YORK, AND SHALL NOT REMOVE OR SUPER-
SEDE ANY CURRENT RENEWABLE ENERGY PROJECTS THAT HAVE ALREADY BEEN
APPROVED, HAVE ALREADY STARTED CONSTRUCTION, OR HAVE BEEN DEEMED A VALU-
ABLE PIECE OF CLEAN ENERGY PROVISIONS FOR THE STATE.
§ 2. This act shall take effect immediately.