S T A T E O F N E W Y O R K
________________________________________________________________________
7283
2025-2026 Regular Sessions
I N S E N A T E
April 8, 2025
___________
Introduced by Sen. PARKER -- read twice and ordered printed, and when
printed to be committed to the Committee on Energy and Telecommuni-
cations
AN ACT to amend the energy law, in relation to allowing new buildings
where new parking is provided to have an optional, charger-agnostic,
power-based allocation method alternative to certain electric vehicle
charging infrastructure requirements
THE PEOPLE OF THE STATE OF NEW YORK, REPRESENTED IN SENATE AND ASSEM-
BLY, DO ENACT AS FOLLOWS:
Section 1. Subparagraphs (i) and (ii) of paragraph (a) of subdivision
9 of section 11-104 of the energy law, as added by chapter 111 of the
laws of 2025, are amended and two new subparagraphs (iii) and (iv) are
added to read as follows:
(i) "electric vehicle ready infrastructure" shall mean all electrical
components, terminating in a receptacle or outlet, as necessary to
enable electric vehicle charging and support electric vehicle charging
stations; [and]
(ii) "electric vehicle charging station" shall mean all the equipment
necessary to deliver electricity from a source outside an electric vehi-
cle into one or more electric vehicles, as defined by the code coun-
cil[.];
(III) "POWER-BASED ALLOCATION METHOD" SHALL MEAN A COMPLIANCE APPROACH
THAT ALLOWS ELECTRIC VEHICLE CHARGING INFRASTRUCTURE REQUIREMENTS TO BE
MET BASED ON THE TOTAL KILOWATT POWER CAPACITY AVAILABLE FOR CHARGING
ELECTRIC VEHICLES, WITHOUT MANDATING A SPECIFIC NUMBER OR TYPE OF CHARG-
ING STATIONS; AND
(IV) "CHARGER-AGNOSTIC" SHALL MEAN A STANDARD OR METHOD THAT DOES NOT
REQUIRE THE USE OF A SPECIFIC TYPE OR BRAND OF ELECTRIC VEHICLE CHARGER
AND ALLOWS FOR THE USE OF LEVEL 1, LEVEL 2, OR DC FAST CHARGERS, DEPEND-
ING ON POWER AVAILABILITY AND SITE CONDITIONS.
EXPLANATION--Matter in ITALICS (underscored) is new; matter in brackets
[ ] is old law to be omitted.
LBD11280-02-5
S. 7283 2
§ 2. Subdivision 9 of section 11-104 of the energy law is amended by
adding a new paragraph (e) to read as follows:
(E) WITHIN TWELVE MONTHS OF THE EFFECTIVE DATE OF THIS PARAGRAPH, THE
DEPARTMENT OF STATE DIVISION OF BUILDING STANDARDS AND CODES SHALL
PROMULGATE RULES AND REGULATIONS ESTABLISHING AN OPTIONAL, CHARGER-AG-
NOSTIC, POWER-BASED ALLOCATION METHOD ALTERNATIVE TO MEET THE REQUIRE-
MENTS OF THIS SUBDIVISION. SUCH RULES SHALL INCLUDE, BUT NOT BE LIMITED
TO:
(I) GUIDELINES FOR CALCULATING AGGREGATE POWER CAPACITY FOR ELECTRIC
VEHICLE CHARGING STATIONS IN PARKING LOTS;
(II) STANDARDS ENSURING EQUITABLE ACCESS TO CHARGING OPTIONS FOR VARI-
OUS TYPES OF ELECTRIC VEHICLES;
(III) FLEXIBILITY FOR PROPERTY OWNERS TO SELECT APPROPRIATE CHARGING
TYPES BASED ON POWER LEVELS; AND
(IV) PROVISIONS TO ENSURE COMPLIANCE WITH ALL APPLICABLE SAFETY AND
ACCESSIBILITY REQUIREMENTS.
§ 3. This act shall take effect immediately.